Loading...
HomeMy WebLinkAbout20090566 Ver 2_Stormwater Info_2010091344 vM`HII"t&cREED TO: NCDENR - DWQ 2321 Crabtree Boulevard Raleigh, NC 27699 ATTENTION: Ms. Annette Lucas oq-bs6(. LETTER OF TRANSMITTAL DATE: Sept 10, 2010 PROJECT NO: 01517-0210 TASK NO: RE: Caterpillar PDC- Test Area Phase 2A TRANSMITTAL NO: PAGE 1 OF 1 WE ARE SENDING: ? Originals ® Prints ? Shop Drawings ? Samples ? Specifications ? Calculations ® Other Quantity Drawing No. Rev Description Status 2 Set of Phase 2A plans - 2 Copies 401 Supplemental Narrative and Calculations LF i ? &JLJ UY SEp . REMARKS: Annette, Vi+ETLq'VD ?S TER QUALITY OftiMr;qER @RMCH Please find the attached submittal for Phase 2A of the CAT Core PDC Test Area. We are submitting the project as a low density modification. I know we have had discussions about the test area. Caterpillar has split the project into phases and this will be the first phase followed by Phase 2B which includes the endurance. Caterpillar would like to set up a meeting with appropriate NCDENR representatives, on site, to better explain what the test area will involve and more specifics to assist in further review of the project. I would like to coordinate setting up the meeting as soon as possible, so please contact me and I will work on a date and time that works for everyone. Thanks again. 1730 Varsity Dr., Suite 500, Raleigh, NC 27606 919/233-8091 Fax 919/233-8031 Cc: McKIM & CREED, PA Signed Grant Livengood, PE oq - 056 401 SUPPLEMENTAL STORMWATER NARRATIVE & SUPPORTING CALCULATIONS ? 1 1 September 10, 2010 0 SAP ? 3 X0'0 'WkA4$ OD of CATERPILLAR CORE PRODUCT DEVELOPMENT CENTER TEST AREA - PHASE 2A Clayton, Johnston County, North Carolina Prepared for: CATERPILLAR, INC. Prepared By: ' McKim & Creed, PA 1730 Varsity Drive Raleigh, North Carolina 27606 Phone: (919) 233.8091 Fax: (919) 233.8031 M&C Project No. 01517-0210 PROJECT DESCRIPITON ' The purpose of this project is to construct a product development center for Caterpillar, Inc. This facility is designed to provide real-world product testing capability that will enable Caterpillar to apply research to improve product performance, efficiency and safety. ' The first phase of the project was completed in early 2010 and included construction of the infrastructure and access to a modular building facility and maintenance building that ' accommodates approximately 170 employees. Additionally, 10 acres were approved to for construction of testing areas which were permitted with the understanding that they would be permanently denuded areas. Along with cooperation from NCDENR-DLR, runoff from the site would be directed into oversized sediment basins that were designed with consideration to the ' 25-year storm event. The next phase of construction on the site is for Phase 2 of the testing area. Upon completion of ' the initial phases of this project, it was apparent that Caterpillar would need more capabilities in their testing facilities. Therefore, new specific testing areas have been planned for previously undisturbed areas of the site. This phase, 2A, will add to the existing Phase 1 test area by adding ' a 'deadman j-hook' area. A demuck area will be added such that vehicles can be washed down when leaving the testing facility. A 'field trench test area' and a track area will also be a part of phase 2. ' SITE DESCRIPTION The existing site is a 245.5 acre tract (252.34 including NCDOT R/W) located in Clayton, North Carolina. The northeastern boundary of the site is formed by an approximate 3,000' frontage along the Neuse River. The entire site drains directly to the Neuse River (WS-V; NSW) r C 1 The tract has elevations ranging from 320' MSL in the southwest portion of the site to 150' MSL nearest to the Neuse River. The average slope over the site is around 4%, however several localized areas have existing grades in excess of 20%. SOILS According to the Johnston County Generalized Soil Survey, the majority of uplands within the site are classified as Cecil sandy loam (Ce) and Pacolet loam (Pa). Interspersed within the uplands are small pockets of Urdorthents loamy. Along the banks of the Neuse River are the frequently flooded Wahadkee loam (Wt) and Chewacla loam (Ch). The following soil descriptions are associated with the soils found on the site: CeC - Cecil sandy loam at 6 to 10% slopes CeB - Cecil sandy loam at 2 to 6% slopes PaD - Pacolet loam at 10 to 15% PaE - Pacolet loam at 15 to 25% Ud - Urdorthents loamy Wt - Wahadkee loam frequently flooded 1 1 1 1 Ch - Chewacla loam frequently flooded STORMWATER IMPROVEMENTS All stormater runoff generated within the footprint of the previously approved testing area will drain to existing and previously approved devices. The majority of stormwater generated by the new demuck area will drain to the wet detention pond approved and constructed during the initial phases of the project. The stormwater not directed to the pond will flow offsite into natural conveyances. Runoff generated by newly disturbed areas for Phase 2A will be directed into sediment basins designed for the 25-year storm event, as was approved for the phase 1 areas. Vegetated conveyances will be used where feasible within the site. Pipes will be used to get water under roads and over large elevation changes. IMPERVIOUS CALCULATIONS Note: impervious areas in testing areas includes those areas that will be permanently denuded, but considered impervious due to compaction from heavy traffic IMPERVIOUS AREA BREAKDOWN Area Description Total Impervious Area ac Test Area - Phase 1 - Interior drives/loader ads/ho er charger area 4.89 - Future Gravel/Sand Areas 2.34 - Rear Drive to test area 0.41 Test Area - Phase 2A - Interior Drives 2.19 - Oval Test Track (including future ravel areas 5.42 - Field Trench Test Area 1.21 - Deadman w/J-hook Area 0.41 - Field Trench Test Area 1.09 - Deadman `J-Hook" area 0.51 - Covered Test/Machine Storage area 0.28 - Demuck Area 1.15 NCDOT Road 1.06 Pre-Engineered Maintenance Building 0.09 Modular Units 0.73 Parkin area for modular units and future corporate building 5.70 Driveways to and around site 2.44 Future Corporate building 1.70 Total Impervious Acreage 31.62 Total Site Acreage (including NCDOT R/W 252.34 Total im ervious % 12.53% 1 Trap. Swale #1 -Permanent Liner ' ecf' Description Pr o} Friction Method Manning Formula ' Solve For Normal Depth Input Data ' Roughness Coefficient 0.030 Tall Fescue Channel Slope 0.03600 ft/ft Left Side Slope 2.00 ft/ft (H:V) ' Right Side Slope 2.00 ft/ft (H:V) Bottom Width 2.00 ft Discharge 4.39 ft3/s ' R lts esu Normal Depth 0.39 ft ' Flow Area 1.07 ft' Wetted Perimeter 3.73 ft ' Hydraulic Radius Top Width 0.29 ft 3.55 ft Critical Depth 0.45 ft Critical Slope Velocity 0.02010 ft/ft 4.09 ft/s <5.5 fUs permissible for slopes 0-5% Velocity Head 0.26 ft Specific Energy 0.65 ft ' Froude Number 1.31 Flow Type Supercritical ' GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft ' Number Of Steps 0 GVF Output Data ' Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft ' Downstream Velocity Infinity Ws Upstream Velocity Infinity fUs Normal Depth 0.39 ft ' Critical Depth 0.45 ft Channel Slope 0.03600 ft/ft Bentley Systems, Inc. H aestad Methods SoEMiWe$FftwMaster V8i (SELECTseries 1) [08.11.01.03] 9110/2010 8:13:03 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06796 USA +1-203-755-1666 Page 1 of 2 Trap. Swale #1 - Permanent Liner ' GVF Output Data Critical Slope 0.02010 ft /ft Bentley Systems, Inc. Haestad Methods SoBBi tle¢FidwMaster V8i (SELECTseries 1) [08.11.01.03] 9/10/2010 8:13:03 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06796 USA +1-203-755-1666 Page 2 of 2 ??II I??J Trap. Swale #2 - Permanent Liner ' Project Description Friction Method Manning Formula ' Solve For Normal Depth Input Data ' Roughness Coefficient 0.030 Tall Fescue Channel Slope 0.07900 ft /ft Left Side Slope 2.00 ft/ft (H:V) ' Right Side Slope 2.00 ft/ft (H:V) Bottom Width 4.00 ft Discharge 1.60 W/s ' Results Normal Depth 0.12 ft ' Flow Area 0.50 ft2 Wetted Perimeter 4.53 ft Hydraulic Radius 0.11 ft ' Top Width 4.47 ft Critical Depth 0.17 ft Critical Slope 0.02501 ft/ft ' Velocity 3.20 ft/s <5.0 ft/s permissible for slopes 5-101/10 Velocity Head 0.16 ft Specific Energy 0.28 ft ' Froude Number 1.69 Flow Type Supercritical ' GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft ' Number Of Steps 0 GVF Output Data ' Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft /s Normal Depth 0.12 ft ' Critical Depth 0.17 ft Channel Slope 0.07900 ft/ft ' 1 03 . ] Bentley Systems, Inc. Haestad Methods SoIbAkWq d6srMaster V81 (SELECTseries 1) (08.11.0 9/10/2010 8:13:45 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06796 USA +1-203-755-1666 Page 1 of 2 Trap. Swale #2 - Permanent Liner ' GVF Output Data Critical Slope 0.02501 fl/ft Bentley Systems, Inc. Haestad Methods SoB61104FiksrMaster V8i (SELECTseries 1) (08.11.01.03] 9/10/2010 8:13:45 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 C Trap. Swale #3 - Permanent Liner ' Project' Description Friction Method Manning Formula ' Solve For Normal Depth Input Data ' Roughness Coefficient 0.030 Tall Fescue Channel Slope 0.06800 ft/ft Left Side Slope 2.00 ft /ft (H:V) ' Right Side Slope 4.00 ft/ft (H:V) Bottom Width 4.00 ft Discharge 2.51 W/s ' Results Normal Depth 0.16 ft ' Flow Area 0.71 ft2 Wetted Perimeter 5.01 ft Hydraulic Radius 0.14 ft ' Top Width 4.96 ft Critical Depth 0.22 ft Critical Slope 0.02323 ft/ft ' Velocity 3.52 ft/s <5.0 Ws permissible for slopes 5-10% Velocity Head 0.19 ft Specific Energy 0.35 ft ' Froude Number 1.64 Flow Type Supercritical ' GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft ' Number Of Steps 0 GVF Output Data ' Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft ' Downstream Velocity Infinity Ws Upstream Velocity Infinity ft/s Normal Depth 0.16 ft ' Critical Depth 0.22 ft Channel Slope 0.06800 ft/ft ' Bentley Systems, Inc. Haestad Methods So®1icde4£rl6srMaster V8i (SELECTseries 1) [08.11.01.03] 9/10/2010 8:14:03 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06796 USA +1-203-755-1666 Page 1 of 2 Trap. Swale #3 - Permanent Liner ' GV'F-O*Ut Dada Critical Slope 0.02323 ft/ft 11 1 1 Bentley Systems, Inc. Haestad Methods So®lidAeQiil6srMaster V8i (SELECTseries 1) (08.11.01.03] 9/10/2010 8:14:03 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 11 1 1 1 1 1 1 Trap. Swale #4A - Permanent Liner Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.030 Tall Fescue Channel Slope 0.00900 ft/ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Bottom Width 5.00 ft Discharge 2.21 ft3/s Results Normal Depth 0.24 ft Flow Area 1.34 f12 Wetted Perimeter 6.49 ft Hydraulic Radius 0.21 ft Top Width 6.41 ft Critical Depth 0.18 ft Critical Slope 0.02444 ft/ft Velocity 1.64 ft/s <5.5 ft/s permissible for slopes 0-5% Velocity Head 0.04 ft Specific Energy 0.28 ft Froude Number 0.63 Flow Type Subcritical GVF`Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.24 ft Critical Depth 0.18 ft Channel Slope 0.00900 ft/ft Bentley Systems, Inc. Haestad Methods SoOlislilloq i6srMaster V8i (SELECTseries 1) [08.11.01.03] 9110/2010 8:14:57 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 Trap. Swale #4A - Permanent Liner ' VF Output Daft Critical Slope 0.02444 ft/ft r 11 L ?I G Bentley Systems, Inc. Haestad Methods Soetkb e4~Master V8i (SELECTseries 1) (08.11.01.03] 9/1012010 8:14:57 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 F Trap. Swale #4B - Permanent Liner ' Project Description Friction Method Manning Formula ' Solve For Normal Depth Input Data Roughness Coefficient 0.030 Tall Fescue ' Channel Slope 0.02700 ft/ft Left Side Slope 2.50 ft/ft (H:V) ' Right Side Slope 2.50 ft/ft (H:V) Bottom Width 4.50 ft Discharge 4.39 ft3/s ' Results Normal Depth 0.27 ft ' Flow Area 1.41 ft2 Wetted Perimeter 5.97 ft Hydraulic Radius 0.24 ft t Top Width 5.86 ft Critical Depth 0.29 ft Critical Slope 0.02116 ft/ft ' Velocity 3.11 ft/s <5.5 fUs permissible for slopes 0-5% Velocity Head 0.15 ft Specific Energy 0.42 ft Froude Number 1.12 Flow Type Supercritical ' GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft ' Number Of Steps 0 GVF Output Data ' Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft ' Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.27 ft ' Critical Depth 0.29 ft Channel Slope 0.02700 ft /ft ' Bentley Systems, Inc. Haestad Methods SoBAidte¢Eide+Master V8i (SELECTseries 1) (08.11.01.03] 9/10/2010 8:29:49 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 Trap. Swale #46 - Permanent Liner ' GVF Output Data Critical Slope 0.02116 ft/ft 1 Bentley Systems, Inc. Haestad Methods SoBAi kie$flidwMaster V8i (SELECTseries 1) (08.11.01.03] 9/10/2010 8:29:49 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 Trap. Swale #5A - Permanent Liner ' Project Description Friction Method Manning Formula ' Solve For Normal Depth Input Data Roughness Coefficient 0.030 Tall Fescue ' Channel Slope 0.02300 ft/ft Left Side Slope 10.00 ft/ft (H:V) Right Side Slope 10.00 ft/ft (H:V) ' Bottom Width 9.00 ft Discharge 10.74 ft3/s ' Results Normal Depth 0.31 ft ' Flow Area 3.68 ft2 Wetted Perimeter 15.13 ft Hydraulic Radius 0.24 ft ' Top Width 15.10 ft Critical Depth 0.31 ft Critical Slope 0.02090 ft/ft ' Velocity 2.92 ft/s <5.5 ft/s permissible for slopes 0-5% Velocity Head 0.13 ft Specific Energy 0.44 ft Froude Number 1.04 Flow Type Supercritical ' GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft ' Number Of Steps 0 GVF Output Data ' Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft ' Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.31 ft ' Critical Depth 0.31 ft Channel Slope 0.02300 ft/ft 0 11 01 03 . . ] 8. Bentley Systems, Inc. Haestad Methods SoBlistle4FiibsrMaster V8i (SELECTseries 1) [ 9110/2010 8:30:30 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06796 USA +1.203-755-1666 Page 1 of 2 1 Trap. Swale #5A - Permanent Liner ' GVF Output QAta Critical Slope r 1-1 L L 1 D 0.02090 ft/ft Bentley Systems, Inc. Haestad Methods SoBlkieQd'i16srMaster V81 (SELECTseries 1) [08.11.01.03] 9/10/2010 8:30:30 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06796 USA +1-203-766-1666 Page 2 of 2 Trap. Swale #5B - Permanent Liner Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.030 Tall Fescue Channel Slope 0.03900 ft/ft Left Side Slope 10.00 ft/ft (H:V) Right Side Slope 10.00 ft/ft (H:V) Bottom Width 9.00 ft Discharge 47.56 ft3/s Results Normal Depth 0.59 ft Flow Area 8.69 ftz Wetted Perimeter 20.76 ft Hydraulic Radius 0.42 ft Top Width 20.70 ft Critical Depth 0.73 ft Critical Slope 0.01656 ft/ft Velocity 5.47 ft/s <5.5 ft/s permissible for slopes 0-5% Velocity Head 0.47 ft Specific Energy 1.05 ft Froude Number 1.49 Flow Type Supercritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.59 ft Critical Depth 0.73 ft Channel Slope 0.03900 ft/ft Bentley Systems, Inc. Haestad Methods SoMikW 9fli wMaster V8i (SELECTseries 1) (08.11.01.03] 9/10/2010 8:16:10 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203.755-1666 Page 1 of 2 1 Trap. Swale #5B - Permanent Liner ' GVI Gutptat Data Critical Slope 0.01656 ft/ft C n r C C G n Bentley Systems, Inc. Haestad Methods So®lir6Ya¢FilbsrMaster V8i (SELECTseries 1) [08.11.01.03] 9/10/2010 8:16:10 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 0 Trap. Swale #6 - Permanent Liner ' Project Description Friction Method Manning Formula ' Solve For Normal Depth Input Data ' Roughness Coefficient 0.030 Tall Fescue Channel Slope 0.09900 ft/ft Left Side Slope 3.00 ft/ft (H:V) ' Right Side Slope 3.00 ft/ft (H:V) Bottom Width 3.00 ft Discharge 1.62 W/s ' Results Normal Depth 0.13 ft ' Flow Area 0.44 ftz Wetted Perimeter 3.82 ft Hydraulic Radius 0.11 ft ' Top Width 3.78 ft Critical Depth 0.19 ft Critical Slope 0.02428 ft/ft 69 ft/s <5.0 fUs permissible for slopes 5-10% 3 ' Velocity . Velocity Head 0.21 ft Specific Energy 0.34 ft ' Froude Number 1.91 Flow Type Supercritical ' GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft ' Number Of Steps 0 GVF Output Data ' Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft ' Downstream Velocity Infinity ft /S Upstream Velocity Infinity ft/s ' Normal Depth Critical Depth 0.13 ft 0.19 ft Channel Slope 0.09900 ft/ft ' 3 ] Bentley Systems, Inc. Haestad Methods Sol8NdAe fil6wMaster V8i (SELECTseries 1) [08.11.01.0 9/10/2010 8:16:27 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06796 USA +1-203-756-1666 Page 1 of 2 H Trap. Swale #6 - Permanent Liner ' t? Output Data Critical Slope C I i i i 0.02428 ft/ft Bentley Systems, Inc. Haestad Methods SoM*IdA QFil6erMaster V81 (SELECTseries 1) [08.11.01.03] 9/1012010 8:16:27 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 u Trap. Swale #7 - Permanent Liner ' Project Description Friction Method Manning Formula ' Solve For Normal Depth Input Data Roughness Coefficient 0.030 Tall Fescue Channel Slope 0.04800 ft /ft Left Side Slope 5.00 ft/ft (H:V) ' Right Side Slope 5.00 ft/ft (H:V) Bottom Width 3.50 ft Discharge 1.77 ft'/s ' Results Normal Depth 0.15 ft ' Flow Area 0.64 ftz Wetted Perimeter 5.04 ft Hydraulic Radius 0.13 ft ' Top Width 5.01 ft Critical Depth 0.18 ft Critical Slope 0.02485 ft/ft ' Velocity 2.75 ft/s <5.5 Ws permissible for slopes 0-5% Velocity Head 0.12 ft Specific Energy 0.27 ft ' Froude Number 1.36 Flow Type Supercritical ' GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft ' Number Of Steps 0 GVF Output Data ' Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft ' Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.15 ft ' Critical Depth 0.18 ft Channel Slope 0.04800 ft/ft ' Bentley Systems, Inc. Haestad Methods So®*klJeq e+Master V8i (SELECTseries 1) [08.11.01.03] 9/10/2010 8:16:44 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06796 USA +1-203-755-1666 Page 1 of 2 Trap. Swale #7 - Permanent Liner ' GVF Output Data Critical Slope r 0 C 11, C? r u 0.02485 ft/ft Bentley Systems, Inc. Haestad Methods Softifie4frlberMaster V81(SELECTseries 1) 108.11.01.031 9/1012010 8:16:44 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 1 1 1 1 1 1 1 1 1 1 1 Trap. Swale #8 - Permanent Liner Project Description Friction Method Manning Formula Solve For Normal Depth Input Data. Roughness Coefficient 0.030 Tall Fescue Channel Slope 0.04000 ft /ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Bottom Width 3.00 ft Discharge 0.74 ft3/s Results Normal Depth 0.11 ft Flow Area 0.35 ftz Wetted Perimeter 3.68 ft Hydraulic Radius 0.10 ft Top Width 164 ft Critical Depth 0.12 ft Critical Slope 0.02795 ft/ft Velocity 2.08 ft/s <5.5 ft/s permissible for slopes 0-5% Velocity Head 0.07 ft Specific Energy 0.17 ft Froude Number 1.18 Flow Type Supercritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.11 ft Critical Depth 0.12 ft Channel Slope 0.04000 fUft Bentley Systems, Inc. Haestad Methods So®iictle4£diwMaster V8i (SELECTseries 1) [08.11.01.03] 9/1012010 8:17:03 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 Trap. Swale #8 - Permanent Liner GVF 'O.utw Data Critical Slope L 1 r u 0.02795 ft /ft Bentley Systems, Inc. Haestad Methods SoMOdiegfritwMaster V8i (SELECTseries 1) [08.11.01.03] 9/1012010 8:17:03 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-766-1666 Page 2 of 2 I Trap. Swale #9 - Permanent Liner ' Project Description Friction Method Manning Formula ' Solve For Normal Depth Input Data Roughness Coefficient 0.030 Tall Fescue ' Channel Slope 0.04100 ft /ft Left Side Slope 3.00 ft/ft (H:V) ' Right Side Slope 3.00 ft/ft (H:V) Bottom Width 3.00 ft Discharge 2.12 ft3/s Results Normal Depth 0.20 ft ' Flow Area 0.70 ftz Wetted Perimeter 4.24 ft Hydraulic Radius 0.17 ft ' Top Width 4.17 ft Critical Depth 0.23 ft Critical Slope 0.02318 ft/ft 5 ft/s permissible for slopes 0-50710 3 02 ft/s <5 ' Velocity . . Velocity Head 0.14 ft Specific Energy 0.34 ft ' Froude Number 1.30 Flow Type Supercritical ' GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft ' Number Of Steps 0 GVF Output Data ' Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft /s Upstream Velocity Infinity ft/s Normal Depth 0.20 ft ' Critical Depth 0.23 ft Channel Slope 0.04100 ft/ft ' 11 01 03 . . ] Bentley Systems, Inc. Haestad Methods SoOkidieQ~Master V8i (SELECTseries 1) [08. 9/1012010 8:30:53 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06796 USA +1-203-755-1666 Page 1 of 2 L Trap. Swale #9 - Permanent Liner ' GV? ?U# c3a?a Critical Slope C 1 C 0 0 0.02318 ft/ft Bentley Systems, Inc. Haestad Methods SoRbiabWfil epMaster V8i (SELECTseries 1) [08.11.01.03] 9/1012010 8:30:53 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-765-1666 Page 2 of 2 Trap Swale #10 - Permanent Liner ' Project Description Friction Method Manning Formula ' Solve For Normal Depth Input Data t Roughness Coefficient 0.030 Tall Fescue Channel Slope 0.02600 ft/ft Left Side Slope 3.00 ft/ft (H:V) ' Right Side Slope 5.00 ft/ft (H:V) Bottom Width 6.00 ft Discharge 2.52 ft'/s Results Normal Depth 0.17 ft ' Flow Area 1.11 ftz Wetted Perimeter 7.38 ft Hydraulic Radius 0.15 ft Top Width 7.34 ft Critical Depth 0.17 ft Critical Slope 0.02467 ft/ft ' Velocity 2.26 ft/s <5.5 ft/s permissible for slopes 0-5% Velocity Head 0.08 ft Specific Energy 0.25 ft ' Froude Number 1.02 Flow Type Supercritical ' GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft ' Number Of Steps 0 GVF Output Data ' Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft ' Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.17 ft ' Critical Depth 0.17 ft Channel Slope 0.02600 ft/ft ' 1 01 03 . . ] Bentley Systems, Inc. Haestad Methods SoBlitMe4~Master V8i (SELECTseries 1) [08.1 9/10/2010 8:17:41 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 F 1 1 Trap. Swale #10 - Permanent Liner Critical Slope 0.02467 ft/ft Bentley Systems, Inc. Haestad Methods So81lidie4Fi16srMaster V8i (SELECTseries 1) [08.11.01.03) 911012010 8:17:41 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 Trap Swale #11 - Permanent Liner ' Project Description Friction Method Manning Formula ' Solve For Normal Depth Input Data Roughness Coefficient 0.030 Tall Fescue Channel Slope 0.03800 ft/ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) ' Bottom Width 2.50 ft Discharge 2.67 W/s ' Results Normal Depth 0.25 ft Flow Area 0.81 ftz ' Wetted Perimeter 4.08 ft Hydraulic Radius 0.20 ft Top Width 4.00 ft Critical Depth 0.29 ft Critical Slope 0.02201 ft/ft 29 3 5 Ws permissible for slopes 0-5% ft/s <5 ' Velocity . . Velocity Head 0.17 ft Specific Energy 0.42 ft ' Froude Number 1.29 Flow Type Supercritical ' GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft ' Number Of Steps 0 GVF Output Data ' Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft ' Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.25 ft Critical Depth 0.29 ft Channel Slope 0.03800 ft/ft 1 Bentley Systems, Inc. Haestad Methods So0A!dk4friberMaster V8i (SELECTseries 1) [08.11.01.03] 911012010 8:17:58 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06796 USA +1-203-755-1666 Page 1 of 2 I L Trap. Swale #11 - Permanent Liner lF Citt?iet; bate Critical Slope 0.02201 ft/ft Bentley Systems, Inc. Haestad Methods SoMild 4FilderMaster V8i (SELECTseries 1) [08.11.01.03] 9/10/2010 8:17:58 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 u 0 1 u 0 0 r Trap. Swale #12 - Permanent Liner Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.030 Tall Fescue Channel Slope 0.03500 ft/ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Bottom Width 2.00 ft Discharge 1-22 ft'/s Results Normal Depth 0.18 ft Flow Area 0.47 ft2 Wetted Perimeter 3.16 ft Hydraulic Radius 0.15 ft Top Width 3.10 ft Critical Depth 0.20 ft Critical Slope 0.02459 ft /ft Velocity 2.60 ft/s <5.5 ft/s permissible for slopes 0-5% Velocity Head 0.10 ft Specific Energy 0.29 ft Froude Number 1.18 Flow Type Supercritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft /s Upstream Velocity Infinity ft/s Normal Depth 0.18 ft Critical Depth 0.20 ft Channel Slope 0.03500 ft/ft Bentley Systems, Inc. Haestad Methods Sol kid e4£it6srMaster V8i (SELECTseries 1) [08.11.01.03] 9/10/2010 8:18:16 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06796 USA +1-203-766-1666 Page 1 of 2 Trap. Swale #12 - Permanent Liner Ab Critical Slope u 0 0.02459 ft/ft Bentley Systems, Inc. Haestad Methods So®iidie9filksrMaster V8i (SELECTseries 1) [08.11.01.03] 9110/2010 8:18:15 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 i Permit No. (to be provided by DWQ) ' State of North Carolina Department of Environment and Natural Resources ' Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM ' LOW DENSITY SUPPLEMENT This form may be photocopied for use as an original ' A low density project is one that meets the appropriate criteria for built upon area and transports stormwater runoff primarily through vegetated conveyances. Low density projects should not have a discrete stormwater ' collection system as defined by 15A NCAC 2H .1002(18). Low density requirements and density factors can be found in Session Law 2008-211, 15A NCAC 2H 1000, Session Law 2006-246, and the DWQ BMP Manual. Curb and gutter systems are allowed provided they meet the requirements in 15A NCAC 2H I 008(g). ' I. PROJECT INFORMATION ' Project Name : Caterpillar Test Area - Phase 2A Contact Person: Grant Livengood Phone Number: (919 )233-8091 ' Number of Lots:I Allowable Built Upon Area (BUA) Per Lot*:24% Number of Dwelling Units Per Acre* *:N/A Low Density Development (check one): ® without curb & gutter ? with curb & gutter, outlets to (check one): ' ® Swales ® Vegetated Area ' *If lot sizes are not uniform, attach a table indicating the number of lots, lot sizes and allowable built upon area for each lot. The attachment must include the project name, phase, page numbers and provide area subtotals and totals. BUA shall be shown in units of square feet. ' **(Phase II Post-Construction (non-SA) only) II. BUILT UPON AREA ' Refer to DWQ's forms and applications website for specific language that must be recorded in the deed restrictions for all subdivided projects. (http://h2o.enr.state.nc.us/su/bmp_fonns.htm) Complete the following calculation in the space provided below where: • SA Site Area - the total project area above Mean High Water. ' DF Density Factor - the appropriate percent built upon area divided by 100. • RA Road Area - the total impervious surface occupied by roadways. ' OA Other Area - the total area of impervious surfaces such as clubhouses, tennis courts, sidewalks, etc. • No. of Lots - the total number of lots in the subdivision. • BUA per Lot - the computed allowable built upon area for each lot including driveways and impervious surfaces located between the front lot line and the edge of pavement. • Total allowable lot BUA - the computed allowable built upon area for all lots combined. ' • Total BUA from lot listing - the sum of built upon area allocated for each lot on the list of non-uniform lots. Form SW401-Low Density-Rev.3-2/10/09 Page 1 of 5 C2lculntion' For uniform lot sizes: ' (SA: ft2 x DF• ) - (RA: ft2) - (OA: ft2) = BUA per Lot = ft2 (No of Lots: ) ' For non-uniform lot sizes: a. (SA: 10991930 ft2 x DF: 0.24) - (RA: ft2) - (OA: ft2) = Total allowable lot BUA = 26638063 ft2 b. Total BUA from lot listing: 1377367sf. b must be < a III. DESIGN INFORMATION ' Complete the following table. If additional space is needed the information should be provided in the same format as Table 1 and attached to this form. Rainfall intensity data can be found in Appendix 8.03 of the State ' of North Carolina Erosion and Sediment Control Planning and Design Manual or at http://hdsc.nws.noaa.gov/hdsc/pfds/ ' Table 1 Swale design information based on the 10-year storm. Swale No. Drainage Area (ac) Impervious Area (ac) Grassed Area (ac) C Q (cfs) Slope (%) Vallow (fps) Vactual (fps) Flow Depth (ft) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Form SW401-Low Density-Rev.3-2/10/09 Page 2 of 5 IV. REQUIRED ITEMS CHECKLIST ' The following checklist outlines design requirements per the North Carolina Administrative Code Section 15A NCAC 2H .1 000, NCDENR BMP Manual (2007), Session Law 2006-246, and Session Law 2008-211. ' Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final ' review and approval of the project. Initial in the space provided to indicate that the following requirements have been met and supporting documentation is provided as necessary. If the applicant has designated an agent on the Stormwater Management Permit Application Form, the agent may initial below. If any item is not met, then justification must be attached. Only complete items n through p for projects with curb outlets. ' Page/Plan Initials Sheet No. N/A a. tFor projects in the 20 coastal counties: Per NCAC 2H.1005, a 50 foot wide vegetative buffer is provided adjacent to surface waters. For Redevelopment projects, a 30' wide vegetative buffer adjacent surface waters is provided. ' N/A b. 7For HQW or ORW projects outside the 20 coastal counties: A 30 foot wide vegetative buffer is provided adjacent to surface waters. C1200-1203 c. t For Phase II Post-Construction projects: All built upon area is located at least 30 feet ' landward of all perennial and intermittent surface waters. N/A d. Deed restriction language as required on form SWU-101 shall be recorded as a restrictive ' covenant. A copy of the recorded document shall be provided to DWQ within 30 days of platting and prior to the sale of any lots. ' Narrative e. Built upon area calculations are provided for the overall project and all lots. N/A f. Project conforms to low density requirements within the ORW AEC. (if applicable per ' 15A NCAC 2H .1007) N/A g. Side slopes of swales are no steeper than 3:1; or no steeper than 5:1 for curb outlet swales. Calculations h. Longitudinal slope of swales is no greater than 5%; for non-curb ' outlet projects, calculations for shear stress and velocity are provided if slope is greater than 5%. ' Calculations i. At a minimum, swales are designed to carry the 10 year storm velocity at a non-erosive rate. ' N/A j. Swales discharging to wetlands are designed to flow into and through the wetlands at a non- erosive velocity (for this flow requirement into wetlands, non-erosive is velocity < 2 ft/s). ' C5101 k. Swale detail and permanent vegetation is specified on the plans. C5101 1. Swale detail provided on plans; includes grass type(s) for permanent vegetative cover. Will provide m. Swales are located in recorded drainage easements. N/A n.tt Length of swale or vegetated area is at least 100 feet for each curb outlet. N/A o.tt The system takes into account the run-off at ultimate built-out potential from all surfaces draining to the system (delineate drainage area for each swale). Form SW401-Low Density-Rev.3-2/10/09 Page 3 of 5 N/A p.tt Curb outlets direct flow to a swale or vegetated area. t Projects in the Neuse, Tar-Pamlico, Catawba River basins, and Randleman Lake may require additional buffers. ' tt Only complete these items for projects with curb outlets. n n 11 11 L Form SW401-Low Density-Rev.3-2/10/09 Page 4 of 5 1 1 1 1 1 1 1 1 1 1 1 1 V. SWALE SYSTEM MAINTENANCE REQUIREMENTS 1. Mowing will be accomplished as needed according to the season. Grass height will not exceed six inches at any time; and grass will not be mowed too close to the ground or "scalped". 2. Swales will be inspected monthly or after every runoff producing rainfall event for sediment build-up, erosion, and trash accumulation. 3. Accumulated sediment and trash will be removed as necessary. Swales will be reseeded or sodded following sediment removal. 4. Eroded areas of the swales will be repaired and reseeded. Swales will be revegetated as needed and in a timely manner based on the monthly inspections. Side slopes must be maintained at the permitted slope. 5. Catch basins, curb cuts, velocity reduction devices, and piping will be inspected monthly or after every significant runoff producing rainfall event. Trash and debris will be cleared away from grates, curb cuts, velocity reduction devices and piping. 6. Swales will not be altered, piped, or filled in without approval from NCDENR Division of Water Quality. I acknowledge and agree by my signature below that I am responsible for the performance of the six maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: Address: Phone: Date: Signature: Note: The legally responsible parry should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, a Notary Public for the State of , County of do hereby certify that personally appeared before me this _ day of , and acknowledge the due execution of the forgoing swale maintenance requirements. Witness my hand and official seal, Notary signature SEAL Form SW401-Low Density-Rev.3-2/10/09 My commission expires Page 5 of 5