Loading...
HomeMy WebLinkAbout20100684 Ver 1_Staff Comments_20100913Gyamfi, Joseph From: Gyamfi, Joseph Sent: Monday, September 13, 2010 12:03 PM To: rhonda.honeycutt@mcgiIlengineers.com Cc: Johnson, Alan; 'Dale Pennell'; 'Rick Howell'; 'Brad Cornwell'; Gyamfi, Joseph Subject: RE: Foothills Commerce Center - Phase One - Cleveland County, NC Hi Rhonda, I just look through your plans and it seems to me that you have an estimate of the amount of imperviousness needed to size stormwater BMPs. You have shown anticipated footprints and square footages of all the buildings, parking areas and road network. Since we (DWQ) are reviewing and approving the SMP for the project, this is what you need to h! 1: (1) Drainage area map of entire site showing proposed stormwater BMP(s) for each drainage area. The entire site must be treated with BMP devices meeting at least 85% TSS. The BMPs should be clearly identified and shown with sizing information on the plans so we know that you have enough space allotted for each treatment device. (2) For Phase One: Complete SMP information must be submitted for review-these include design calcs, full size grading and drainage plans, Supplement Forms and Required Items Checklist along with all items listed therein, and notarized and Operation and Maintenance (0 & M) Agreement(s) for the selected BMP(s). The Supplement Forms and sample copies of the 0 & M Agreements are available at http://Portal.ncdenr.org/web/wq/ws/su/bmp-manual if you have any questions, please call to discuss. Thanks. Ijcnn, h, p r 64F? Joseph Gyamfi, P.E. Environmental Engineer NCDENR/DWQ 401/Express Permitting Unit 2321 Crabtree Blvd., Suite 250, Raleigh, NC 27604 Phone: (919) 715-3473 Fax: (919) 733-6893 `A/rl -,ite: http://h2o.enr.state.nc.us/ncwetlands/index.html F-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be di, tclosed to third parties. From: Rhonda Honeycutt [mailto:rhonda.honeycutt@mcgillengineers.com] Sent: Monday, September 13, 2010 10:33 AM To: Gyamfi, Joseph Cc: Johnson, Alan; 'Dale Pennell'; 'Rick Howell'; 'Brad Cornwell' Subject: RE: Foothills Commerce Center - Phase One - Cleveland County, NC Mr. Gyamfi- I am working to revise the stormwater plans for the Foothills Commerce Center in Cleveland County. Phase One of the project includes the main road into the property, one graded building pad, and water, sewer, erosion control, and stormwater for Phase One. Future phases will include a number of other buildings - our conceptual plan shows nine buildings total on the 152 acre site. For Phase One permitting, what do we need to show? As we do not know what the actual building layout will be (if an industry comes in and wants to build one large building where we show three smaller ones, they may), how precise do we need to be with our future stormwater design, due to the unknown future impervious areas? Let me know if you have any questions about the site. Thank you for your time. Rhonda H. Honeycutt, El McGill Associates, P.A. 55 Broad Street Asheville, NC 28801 Ph. (828)252-0575x173 Fax(828)252-2518 rhonda.honevcutt@mcgillengineers.com www.mcgillengineers.com From: Johnson, Alan [mailto:alan.johnson@ncdenr.gov] Sent: Monday, September 13, 2010 8:49 AM To: rhonda.honeycutt@mcgillengineers.com Cc: Gyamfi, Joseph Subject: RE: Foothills Commerce Center - Phase One - Cleveland County, NC Joseph Gyamfi in the central office in Raleigh can clarify your needs regarding SW. AT minimum "conceptual" SW will need to be shown on the plans to show that at build out the entire site will have SW BMPS Thanks AJ From: Rhonda Honeycutt [mailto:rhonda.honeycutt@mcgillengineers.com] Sent: Friday, September 10, 2010 11:55 AM To: Johnson, Alan Cc: 'Rick Howell'; 'Dale Pennell'; 'Bill Roark' Subject: Foothills Commerce Center - Phase One - Cleveland County, NC Mr. Johnson- Per our phone conversation yesterday about the Foothills Commerce Center - Phase One in Cleveland County, I am working on a plan and profile/cross-section of the proposed sewer and future culvert and water crossing of Little Beaverdam Creek. I will e-mail you drawings when they are ready. You had also mentioned that we needed to indicate on our plans that stormwater for full conceptual buildout was considered. You stated that someone else was in charge of that type of review and that you would forward me his information. I look forward to receiving that information so that we may determine exactly what he will be looking for and we can check our design again. Let me know if you have any other questions or comments. Thanks- Rhonda H. Honeycutt, El McGill Associates, P.A. 55 Broad Street Asheville, NC 28801 Ph. (828)252-0575x173 Fax(828)252-2518 rhonda.honeycutt@mcgiIlengineers.com www.mcgillengineers.com