HomeMy WebLinkAbout20090430 Ver 3_Staff Comments_20100902Oq-ag3a Mcmillan, Ian From: Lucas, Annette Sent: Thursday, September 02, 2010 9:38 PM To: Daniel Ingram Cc: Mcmillan, Ian Subject: RE: Johnston County Airport Corporate Area phasing Daniel - Sorry for the slow response - Ian and I needed a chance to talk about your request. Per the DWQ's Protocol for 401 Stormwater Management Plan Approval and Implementation, the stormwater management plan must be approved prior to the impact being conducted (you have met this benchmark). Then, the stormwater management plan must be implemented prior to the facilties being constructed and operational. For the specific wording, see Item (C) on the protocol document: httD://Dortal.ncdenr.ora/c/document librarv/Qet file?uuid=Oc509d61-6dd6-4da8-9342-7079fe478688&arouDId=38364 Therefore, it is permissible for you to do the earthwork for the Corporate Area at this point (provided that there is appropriate Sedimentation and Erosion Control). However, before the Corporate Area is occupied, the stormwater management plan that serves the runway areas must be constructed and operational (remember you did a swap - treatment of the runways in exchange for treating the Corporate Area). I hope that clarifies the requirements for you. Please let me know if you have further questions. Thanks, Annette From: Daniel Ingram [dingram@wkdickson.com] Sent: Monday, August 30, 2010 10:56 AM To: Lucas, Annette Cc: Mcmillan, Ian Subject: RE: Johnston County Airport Corporate Area phasing Annette (and Ian): The Johnston County Airport Runway Safety Area construction bids were significantly lower than estimated. As a result, the airport may have additional funding to construct the Corporate Area. The Airport has requested me to determine if they could phase the construction to allow utilizing the current funding to its fullest. Currently, the Airport has funding for the Corporate Area mitigation and earthwork, but not the pavement and structures (and associated BMPs). No impervious surfaces would be constructed without stormwater controls. However, the airport would like to proceed with the mitigation and grading while funding is available. Would DWQ object to phasing the work in this manner? Thanks for your help on this. Daniel Ingram 919.782.0495 From: Mcmillan, Ian [mailto:ian.mcmillan@ncdenr.gov] Sent: Monday, August 30, 2010 10:46 AM To: Daniel Ingram Cc: Lucas, Annette Subject: Voicemail Daniel, please contact Annette with your storm water questions. Thanks, Ian McMillan Ian J. McMillan, PWS, GISP NCDENR/Division of Water Quality Acting Supervisor - 401/Wetlands Permitting and Oversight Unit 2321 Crabtree Blvd. Suite 250 Raleigh, NC 27604 Office: (919) 715-4631 Fax: (919) 733-6893 Email: ian.mcmillan(&ncdenr.gov E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties.