HomeMy WebLinkAbout820044_Plan of Action (POA)_20200521 PLAN OF ACTION(Poa) FOR HIGH:FREEBOARD AT ANIMAL FACILITIES
Facility Number: 82-44 County: •Sampson
Facility Name: Baggett 8,Sons
•
Certified Operator Name: Gary Baggett Operator Number: AWA18344
1. Current liquid level(s)in inches as measured from the current liquid level in the lagoon to the,
lowest point on the top of the dam for lagoons without spillways;and from the current liquid level:
'in the lagoon to the bottom of the spillway for:lagoons with spillways.
Lagoon 1 LagOon'2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID:
Spillway(Y or N):
Level(inches): 17 18.
2. Check all applicable.items
Liquid level is within the designed structural freeboard elevations of one or more-structures:
Five and 30 day Plans of Action are attached: Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm.elevations for one or more structures. A
30 day:Plan of Action is attached. Agronomic balance is within acceptable.range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped'and hauled is'reflected in section Ill tables. Included within this plan is ailist
of the proposed sites with related facility nurribers,number of acres and receiving,crop
information. Contact and secure approval from the DM-priorto transfer of waste to.a site
not covered-inrthe facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be movedto another permitted facility, provide facility number, lagoon
freeboard-levels and herd population for the receiving facility
3. Earliest possible date to begin land application.of waste: as conditions permit
I hereby certify that I have reviewed the information listed above and included within the '
attached Plan.of Action,and to:the best of my knowledge and ability,theinformation is
accurate and correct. •
Gary Baggett Phone: 910-385-5923 :,
Facility Owner/Manager(print)'
Date: 5/21/2020
Facility Ow4er/Manae (signature)
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR.STORM STORAGE ELEVATIONS IN ALL WASTE.STRUCTURES FOR FACILITY
1. Structure ID: Lagoon 1 line m.= 1085.9 lb PAN
• 2. Structure ID: Lagoon'2 line m= 719.1 lb-PAN
3. Structure ID: line m=. lb PAN"
4. Structure ID: line m= lb:PAN
5. Structure ID: - line m= lb PAN
6: Structure ID: line m= lb PAN
n. lines 1 +2 t 3+4+5+-6= 1805.0 lb PAN
III: TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS'DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT_BE APPLIED DURING THIS 30 DAY PERIOD.
o.tract# p.field# q.crop r. acres s.remaining!RR-t.TOTAL PAN u.application window1
2 PAN.balance BALANCE FOR
(lb/acre) FIELD(lbs.)
column'r x s
5 Bermuda Hay' ' 0.40 296.00 118.4 March-Sept
4 Bermuda Hay ' 1.40 296.00, 4.14:4 March-Sept
3 Bermuda"Hay 4.70 296.00 '1391.2 March-Sept
1 Bermuda Hay 4.60 271.90 1250.7 March-Sept
2A Bermuda Hay 0:70 287.80 ' ' 201.5 March-Sept
9 Bermuda Hay 2:60 296.00 ' 769.6 March-Sept
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v.Total PAN available for all fields(sum of column t)=- 4145.8 lb.PAN
IV.FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied(line n from section II)= :1805.0 lb.PAN
PoA(30 Day)2/21/00
x. Crop's remaining PAN balance(line v from section III)= :4145.8 lb..PAN
y. Overall PAN balance(w-:x)_ -2341 lb.PAN
Line:y must show as a.deficit.. If line y does not show as a deficit, list course of action here including pump and
haul,depopulation, herd reduction,etc. For pump&'haul and herd reduction options, recalculate new PAN based
on new information. If new fields are to be included as an option,for lowering lagoon level, add these fields to the
PAN balance table and recalculate the,overall PAN balance. If animal waste is to be hauled to another permitted
facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility.
NARRATIVE;
Irrigation onto existing spray fields will continue as weather and field conditions permit:Additional Land is available
for pumping if needed.
Remaining PAN is an estimate.
PoA(30 Day)2/21/00
PLAN OF ACTION(PoA)FOR HIGH FREEBOARD AT ANIMAL,FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE'
1. Structure.Name/Identifier(ID): Lagoon 1
2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard
a. current liquid level according to marker 17.0 inches
b. designed 25 yr./24 hr.storm&structural freeboard 20.4 inches
c. line b-line a.(inches in red zone)= 3.4 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 73500 ft2
e, line c/12 x lined x 7.48 gallons/ft3 155771 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 96925.7 ft3
h. current herd# 2940 certified herd.# 2940
actual waste produced = current herd# x tine g = 96926 ft:3
certified herd#
i. volume of wash water according to structural design , 0 ft3
j. excess rainfall over evaporation according to design 42875 ft3
k. (lines h+i+j)x 7.48 x 30 'days/line f= 174285 gallons
4. Total PAN to be-land applied during draw down period
I. current waste analysis dated ' 2/3/2020 3.29 Ibs/1000 gal.
m. ((lines e+k)/1000)x line I = 1085.9.lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA(30 Day)2/21/00