Loading...
HomeMy WebLinkAbout820044_Plan of Action (POA)_20209617 s PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-44 County: Sampson Facility Name: Baggett&Sons , Certified Operator Name: Gary Baggett Operator Number: -AWA18344 , 1. Current liquid level(s)in inches as measured from the:currentliquid level lathe lagoon to the lOWeat pointon the top of the°dam,for lagoons without spillways;and_from the current:liquid level. in the lagoon to the bottom of the spillway for lagoons With spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: Spillway(Y or N): Level(inches): '18 16 ' 2. Check all applicable items ` Liquid level is within the designed structural freeboard elevations of one or more structures. . Five.and 30 day Plans of Action are attached. Hydraulic and agronomic balances are . within acceptable ranges. X Liquid level-is within the 25 year 24.hour storm elevations.for one or more structures..'A 30 day Plan of Action is attached: 'Agronomic balance is within acceptable range. - - Waste is to be pumped and hauled to off site locations. Bolume,and PAN content'of waste - to,Wbe pumped and hauled is reflected in section III tables. Included within this plan is a list - • of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the-DWQ prior to transfer of waste to a site not covered in thefacility's CAWMP. - Operation will be partially or fully depopulated_ *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be-moved to another permitted facility, provide facility number, lagoon freeboard-levels and.herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that!.have reviewed the information listed above.and included within the attached Plan of Action,and to the-best Of my knowledge and ability,the information is accurate and correct. ' - Gary Baggett - Phone: 910=385-5923 - Facility Owne 6 r/Manager(print) —au- p NA.. ��\r-- Date: 6/17/2020 Facili Owner/Mar(dger(signature) II. TOTAL POUNDS OF`PAN STORED WITHIN.STRUCTURAL FREEBOARD,ANDIOR 25 YRJ24. HR.STORM STORAGE ELEVATIONS INALL WASTE STRUCTURES:FOR FACILITY 1. Structure ID: Lagoon 1 linen= 841.4 lb PAN .2. Structure ID: Lagoon 2 line rel.= •1108.8 k PAN 3. Structure ID: line,rn= lb PAN 4. Structure ID: line m= lb PAN 5. Structure ID: line m lb PAN, 6. Structure ID: .lina m= lb PAN lines1 +2+3t4+5+6= 10$0.2 lb PAN III. ,TOTAL.PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30'DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED:DURING THIS 30 DAYPERIOD. . o.tract#- p.field# q.crop • r.acres s.remaining t.TOTAL PAN u.application windows 2 PAN balance BALANCE FOR (lb/acre) FIELD(100 Column r x s 5 Bermuda Hay 0.40 - 296.00 118.4 March-Sept 4 Bermuda Hay 1.40 29600 414.4 March-Sept 3 Bermuda Hay 4.70 260.60 . 1224.8 March-Sept 1 Bermuda Hay 4.60 260.40 1197.8 March,Sept 2A Bermuda Hay 0.70- 282.00 197.4 March-Sept 9 Bermuda Hay 2,60 296.00 769.6. March-Sept 1State current crop ending,application date or next crop application beginning date for available 'receiving crops during 30 day draw down period. v.Total PAN available for all fields(sum of column-t)•= 3922.5 lb. PAN IV.FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied(line n from.section II)= 1950.2 lb.PAN PoA(30:Day)2/21/00 x. Crop's.remaining PAN balance(line v from section III)= 3922.5 lb. PAN y. Overall PAN balance(w=x)= -1972 lb.PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and °- haul, depopulation, herd reduction,etc. ,For pump&haul and herd reduction options;recalculate.new PAN based On new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. 'If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: . Irrigation onto existing spray fields will continue as weather and field conditions permit.Additional land is available for pumping if needed. Remaining PAN is an estimate. PoA(30 Day).2/21/00 PLAN OF ACTION(PoA)FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID); (Lagoon 1 2. Current liquid volume in 25 yr:/24 hr. storm storage&structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr'/24 hr. storm&structural freeboard 20.4 inches c. line b-line a(inches in red zone)= 2.4 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 73500 ft2 e. line c/12 x lined x-7.48 gallons/ft3 109956 gallons 3. Projected volume of waste liquid produced during draw.down-period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 96925.7 ft3 h. current herd#: 2940 certified herd# 2940 actual waste'produced = current herd# x line g = 96926 ft3 certified herd# i. volume of wash water according to structural design 0 ft3 j. excess rainfall;over evaporation according to design 42875 ft3 k. (lines h+i+j):x 7.48 x 30 days/line f= 174285 gallons 4. Total PAN to be land applied,during draw down period I. current waste analysis dated 6/15/2020 2.96 Ibs/1.000 gal. m. ((lines e+k)/1000)x line I= 841:4 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA(30 Day)2/21/00 PLAN OF ACTION (PoA)FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID): Lagoon 2 2. Current liquid volume in 25 yr./24 hr.storm storage&structural freeboard a. current liquid level according to marker 16.0 inches b. designed 25 yr./24 hr.storm&structural freeboard 20.41inches _ c. line b-line a(inchesin red zone)= 4.4 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 73500 ft2 e. line c/12 x lined x.7.48 gallons/ft3 201586 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 96925.7 ft3 h. current herd# 2940 certified herd# 2940 actual waste produced = current herd# x line g = 96926 ft3 certified herd# i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design 42875 ft3 k. (lines h+i+j)x 7.48,x 30 days/line f= 174285 gallons 4. Total PAN to be land,applied during draw down period I. current waste analysis dated 6/15/2020 2.95 lbs/1000 gal. m. ((lines e+k)/1000)xline I= 1108.8 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA(30 Day)2/21/00