Loading...
HomeMy WebLinkAbout820038_Plan of Action (POA)_20200214 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-38 County: Sampson Facility Name: HD3 Bull Run Certified Operator Name: Brandon Norris Operator Number: 1004381 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 Spillway(Y or N): N Level(inches): 17 2. Check all applicable items X Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 2/10/2020 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability,the information is accurate and correct. HD 3 Farms David Mixon Manager Phone: 910-385-5196 Facility Owner/Manager(print) Date: 2/14/2020 Facility Owner/Manager(signature) PLAN OF ACTION(POA)-FOR.HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL.PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID): Lagoon 2 2. Current liquid volume in 25 yr./24 hr.storm storage&structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr.storm&structural freeboard 20.4 inches c. line b-line a(inches in red,zone)= 2.4 inches d. top of dike surface area according,to design (area at below structural freeboard elevation) 73500 ft2 e, line c/12 x lined x 7.48 gallons/ft3 109956 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 96925.7 ft3 h. current herd# 2940 certified herd# 2940 actual waste produced = current herd# x line g = 96926 ft3 certified herd# i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design 42875 ft3. k. (lines h+i.+j)x 7.48'x 30 days/line-f= 174285 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated ' 2/3/2020 2.53 lbs/1000 gal. m. ((lines e+ k)/1000)x line = 719.1 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA(30 Day)2/21/00 II. TOTAL POUNDS.OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25.YR./24. HR.STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon#1 line m = 958.4 lb PAN 2. Structure ID: • line m = ' lb PAN 3. Structure ID: line m = _ lb.PAN 4. Structure ID: line m = - lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 958.4 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract# p. field# q: crop r. acres s.remaining IRR t.TOTAL PAN u.application window 2 PAN balance BALANCE FOR (lb/acre) FIELD(lbs.) column r x s 13A Corn 5.71 123.82 707.0 March-July 13B Corn 3.18 126.05 400.8 March-July 12 Corn 4.19 130.68 547.5 March-July 11 Corn 5.37 130.73 - 702.0 March-July • • • 'State current crop ending application date or next crop application beginning date for available receiving crops during-30 day draw down period. v.Total PAN available for all fields (sum of column t) = 2357.4 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II)= 958.4 lb. PAN x. Crop's remaining PAN balance(line v from section III) = 2357.4 lb. PAN y. Overall PAN balance(w-x)= -1399 lb. PAN • PoA(30 Day)2/21/00 • Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump& haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: H&C Farms recieved 9.5 inches of rain during a 12 hour period which resulted in a higher level on the lagoon. Irrigation onto existing spray fields will continue as weather and field conditions permit. PoA(30 Day)2/21/00 •