Loading...
HomeMy WebLinkAboutNCC190048_Modification Review CONTACT CHANGES_20201208Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 12/8/2020 8:04:21 AM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany 12/8/2020 12:09:58 PM (Construction COC ADD TO FILE Review- NCC190048) • The task was assigned to Georgoulias, Bethany. The due date is: December 11, 2020 5:00 PM 12/8/2020 8:04 AM Y . Ta4M1 NORTH CAPOLINA EnYlrenmemf& Qualay Certificate of NCC190048 Coverage (COC) Enter the Certificate of Coverage Ninber (Use capital letters) No.* Information associated with this permit Project Name Cadence Mint Hill Phases 2 - 4 Address 8841 Fairview, Mint Hill, NC County Mecklenburg Latitude 38.1811 Longitude -80.6333 Permittee Listed Mattamy Carolina Corporation Legally Responsible Joe Walker Individual NC Reference No. NCG01-2019-0048 E&SC Plan ID 389911 Original NOI 10172 Tracking No.* Date COC Issued* 04/16/2019 Prior Rescission This field will populate only if COChas already been rescinded. Date Modification Information: Reason for r Closed -Out Lots/Outparcels in E&SC Plan Modification * a Additional Lots/Outparcels Approved - E&SC Revised r Other Revision(s) to E&SC Plan F Legally Responsible Individual and/or Site Contact Has Changed r Multiple Reasons (List) Addional Nbre information if needed (e.g., new Site Contact details can be included here) Explanation Brian Johnson VP 704-507-7547 BA.Johnson@mattamycorp.com You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Upload Supporting Lbcurrentation (%vised IRSCApproval, (lose -Out Doc, etc.) Documentation _Cadence at Mint Hill Phase 2-4 Site Development 83.22MB Set - 06-13-19 (CURRENT).pdf Mast be RYformat North Carolina General Statute 143-215.6B (i) provides that: Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto exceed ten thousand dollars ($10,000). rJ I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Specify if you are:* r The Legally Responsible Individual f Authorized Responsible Person* *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature f r'1& Kc Type Name* Brian Johnson Title * VP Organization* Mattamy Homes Date * 12/08/2020 Email Address* BA.johnson@mattamycorp.com En -ail for confirmation Telephone Number* 7045077547 Contact number if we need to reach you Note: Original permittee and site contact are copied on modification correspondence. Additional Email Additional email for conf irrration (Optional) Original Permittee joe.walker1974@gmail.com Email Original Site Contact joe.walker@mattamycorp.com Email Review Date 12/08/2020 Rescinded Since Submitted? Request Date 20201208 Formatted Review Date 20201208 Formatted