Loading...
HomeMy WebLinkAboutNCC205588_NOI Application_20201208Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 12/3/2020 10:50:08 AM (NCG01 NOI Submission) Approve by Clark, Paul 12/3/2020 12:48:30 PM (Review- Construction NOI 38014) • The task was assigned to Clark, Paul by round robin distribution 12/3/2020 10:50 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: December 7, 2020 5:00 PM 12/3/2020 10:50 AM Submit by Selkane, Aziza 12/8/2020 11:11:32 AM (Payment Verification for NCC205588) * Bradley A Haertling • Selkane, Aziza assigned the task to Selkane, Aziza 12/8/2020 11:10 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: January 14, 2021 5:00 PM 12/3/2020 12:48 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting r No an NOI that was r Yes rejected before? Previous Rejected 37243 NOI No. Prior Reviewer Paul Clark Name 1a. Project Name * Birchwood Grove Subdivision Phase 1 & 2 1 b. Specific Lot This field may be used to list specifc lot numbers. Numbers 96 2. County* Harnett 3. Highway or Street U.S. 401 Address * Street narre only is acceptable if no address number assigned yet 4. City or Township* Hectors Creek Township 5. State * NC 6. Zip Code * 27526 7. Latitude * Enter the latitude in decimal degrees 35.4660 8. Longitude* Enter the longitude in decimal degrees (M. ST be negative) -78.8290 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 12/07/2020 Estimated Construction Project Start Cate 10. Date to End* 02/07/2022 Estimated Construction Project End Cute 11. SIC (Primary)* Residential, Single Family Houses (SFE) (1521) Standard Industrial Classification for Developrrent 12. Acres to be 34.80 disturbed* (including off -site borrow and waste areas) 13. Total site area 80.70 (acres) * 14. Post- 25.65 construction (Estimated) impervious area (acres) * NCC Project NCC-HARNE-2020-Birchwood Grove Subdivision Phase 1 & 2 Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Cape Fear River Wate rbody* %rre of waterbody into which stormwater runoff will discharge 15b. Waterbody 18-(10.5) Index No.* NCWaterbody Index Number Stormwater rJ No discharges will flow r- Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fbrnittee Inforrration - Legally Fa sponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Responsible Entity Name * KB Home It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Jonathan If Corporation, enter Registered Agent First %rre 3. Last Name* Hayward It Corporation, enter Registered Agent Last %rre 3b. Title Vice President of Land Acquisition 4. Permitee E-mail jhayward@kbhome.com Address* 5. Permittee (919) 768-7975 Telephone No.* 6. Permittee Mailing Street Address Address* 4506 South Miami Boulevard Address Line 2 Suite 100 City State / Frovince / Fegion Durham NC Fbstal / Zip Code Country 27703-8000 us Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 4506 South Miami Boulevard Address Line 2 Suite 100 City State / Frovince / Region Durham NC Fbstal / Zip Code Country 27703-8000 us 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Jonathan Contact - First Name * 2. Primary Site Hayward Contact - Last Name * 3. Title Vice President of Land Acquisition 4. Site Contact E- jhayward@kbhome.com mail Address* 5. Site Contact (919) 768-7975 Telephone No. 6. Organization KB Home Name 7. Site Contact Street Address Mailing Address* 4506 South Miami Boulevard Address Line 2 Suite 100 city Durham Fbstal / Zip Code 27703-8000 8. Consultant Name (Optional) Brad Haertling First and Last nacre 9. Consultant E-mail bhaertling@american-ea.com This person will be copied on all correspondence. 10. Consultant (919)-469-1101 Telephone No. State / Rovince / Region NC Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 05/01/2020 Approved * 2. E&SC Plan Project HARNE-2020-056 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Fayetteville (FRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan harne056apModRev.pdf Approval letter or Mast beRDFformat Grading Permit 6. Site Location Map Mist be RDFforrret (lint 20 NB) 00. CVR-Cover.pdf Rease do not upload entire set of E&SC plans. 96.94KB 511.35KB 7. Notes (Optional) Rovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification NOI _Signed.pdf 75.33KB Form Wst be RDFforrret This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Jonathan Hayward Title Vice President of Land Acquisition Organization Legally Responsible Entity KB Home Date * 12/03/2020 F. Tracking and COC Info NOI Tracking No. 38014 NC Reference No. NCG01-2020-5588 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC205588 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 5588 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC205588-2020 Invoice Due Date 1/2/2021 Initial Fee $ 100.00 Invoice Status OPEN