Loading...
HomeMy WebLinkAboutNCC205569_ESC Approval Submitted_20201208Matt Raab To: Matt Williams Subject: RE: Review Completed - Aspen Pointe From: City of Winston-Salem [mailto:noreply@idtplans.com] Sent: Friday, October 30, 2020 2:17 PM To: mwilliams(cDborum-wade.com Subject: Review Completed - Aspen Pointe Application Type: 04.02) Grading/Erosion Control Permit Workflow: 04.02) Grading & Erosion Control Project: Aspen Pointe A/P #: EN2000142 Acreage to be Disturbed: 6.72 https:Hwinston-salem.idtplans.com/secure/project/?prof ectid=428809 Hello Matt Williams, Thank you for submitting your project to City of Winston-Salem. Review of the plans for this project have been completed. The design is adequate to meet the ordinance standards and the plans have been approved. If you have not already done so, please provide an original signed and notarized Financial Responsibility/Ownership form. This document is required prior to the issuance of the Grading/Erosion Control Permit. If this has already been provided, then please disregard this statement. If this project will disturb more than 1 acre the Grading/Erosion Control Permit cannot be issued until documentation is provided that coverage under the NCGOI Construction Stormwater Permit (NPDES) has been obtained. Please obtain coverage under the permit at the following website (https:Hedocs.deci.nc.gov/Forms/NCGOI-NOI). Once coverage is obtained please upload a copy to the project documents in the electronic plan review system. The Grading/Erosion Control Permit will not be issued until proof of coverage under NCGO 1 is provided. Should you have any questions as you move forward please feel free to contact our offices. We will be happy to assist you.