HomeMy WebLinkAboutNCC205580_ESC Approval Submitted_20201208ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
McKee Homes, LLC
NORTH CAROLINA
Environmental Quality
September 4, 2019
LETTER OF APPROVAL
Express Option
ATTN: Melinda Chapman, Budget Coordinator
109 Hay Street, Suite 301
Fayetteville, NC 28301
RE: Project Name: Liberty Hill — Lots 253 & 258
Acres Approved: 0.5
Project ID: CUMBE-2020-037
County: Cumberland, City: Cross Creek, Address: Northgate Dr. & Liberty Ln.
River Basin: Cape Fear
Stream Classification: Other
Submitted By: Averette Engineering Co., P.A.
Date Received by LQS: September 3, 2019
Plan Type: Express
Dear Ms. Chapman:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be
posted at the job site. This plan shall expire three (3) years following the date of approval, if no land
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
(NOI] form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General
Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on
the above -named project. The NOI form may be accessed at deq.nc.gov/NCG01. the NOI form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul. clarkOncdenr.gov. After you submit a complete and correct NOl
Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage
under the NCGO1 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR
Stormwater Central Office staff in Raleigh.
D� North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources
Fayetteville Regional Office 1 225 Green Street. Suite 714 1 Fayetteville, North Carolina 28301
NCATH'ARQ INA !�
oana+aml0E imrinwntrl� /�� 910.433.3300
Letter of Approval
McKee Homes, LLC
September 4, 2019
Page 2 of 2
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the
job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic inspection to insure compliance
with the approved plan.
Title 15A NCAC 413.0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also,
this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic inspection to insure compliance with
the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, it is determined that the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution
Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the
information included on the form. This permit allows for a land -disturbance, as called for on the application plan,
not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting
date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Jodi Pace, El
Regional Engineering Associate
Land Quality Section
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
cc: Mike Averette, Averette Engineering Co., P.A. (electronic copy)
David Steinmetz, Building Inspector (electronic copy)
David Winstead, City of Fayetteville Permits (electronic copy)
Fayetteville Regional Office file