Loading...
HomeMy WebLinkAbout20061804 Ver 36_Stormwater Supplement Form_20201204SUPPLEMENT=EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Whitley Corner 2 Project Area ac 47.05 3 Coastal Weiland Area ac 0 4 Surface Water Area ac 0 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4 7 Width of vegetated setbacks provided feet 6 8 Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in .1003 4 c-d out of the setback? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 2 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 113ayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Mike Stocks, P.E. 28 Organization: Stocks Engineering 29 Street address: 801 E Washington St. 30 City, State, Zip: Nashville, NC 27856 31 Phone number(s): 252459-8196 32 Email: astocks@stocksengineering.com Certification Statement: I cert'rfy, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. /lllf • . •FEss/'••.'z 0 0op ti ."I .y . a SEAL z 19t343 �j �/ ••••••N• G `� •''•iCyAEL S%�.%`• t `�fitct Signature of Designer l ��/9/2oZo Date DRAINAGE AREAS high density project? Yes umber of drainage areas/SCMs 2 t of this project subject to previous rule ff,,eirsi.ns? No FORMS LOADED DRAINAGE AREA INFORMATION A Entire Site 1 2 4 Type of SCM Wet Pond Wet Pond 5 Total BUA in project (sq ft) 897988 sf 372733 sf 525255 sf 6 New BUA on subdivided lots (subject to permitting) (sq ft) 620040 sf 213825 sf 406215 sf 7 New BUA outside of subdivided lots (subject to permitting) (sf) 277948 sf 158908 sf 119040 sf 8 Offsite - total area (sq ft) None 9 Offsite BUA (sq ft) None 10 Breakdown of new BUA outside subdivided lots: Parking (sq ft) 20520 sf 6300 sf 14220 sf Sidewalk (sq ft) 38340 sf 20870 sf 17470 sf Roof (sq ft) Roadway (sq ft) 219088 sf 131738 sf 87350 sf Future (sq ft) Other, please specify in the comment box below (sq ft) 11 New infiltrating permeable pavement on subdivided lots (sq ft) None 12 New infiltrating permeable pavement outside of subdivided lots (sq ft) None 13 Exisitng BUA that will remain (not subject to permitting) (sq ft) None 14 Existing BUA that is already permitted (sq ft) None 15 Existing BUA that will be removed (sq ft) None 16 Percent BUA 44% 56% 68% 17 Design storm (inches) 1 in 1 in 18 Design volume of SCM (cu ft) 30750 cf 42598 cf 19 Calculation method for design volume SIMPLE SIMPLE ADDITIONAL INFORMATION 20 Please use this space to provide any additional information about the drainage area(s): WET POND 11 Drainage area number 21 Design volume of SCM (cu ft) GENERAL MDC FROM 02H .1050 = 31 Is the SCM sized to treat the SW from all surfaces at build -out? 1 2 30750 cf 42598 cf Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM (H:V)? 2:1 2:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes Yes 81 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? Yes Yes 141 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM designed by an NC licensed professional? WET POND MDC FROM 02H .1053 181 Method used Yes SA/DA Yes SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 256.00 229.00 21 Elevation of the main pool bottom -(top of sediment removal) (fmsl) 257.00 232.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 261.00 237.00 23 Elevation of the permanent pool (fmsl) 262.00 238.00 241 Elevation of the top of the vegetated shelf (fmsl) 262.00 238.00 251 Elevation of the temporary pool (fmsl) 265.02 241.05 26 Surface area of the main permanent pool (square feet) 14734 sf 14970 sf 27 Volume of the main permanent pool (cubic feet) 48547 cf 57208 cf 28 Average depth of the main pool (feet) 3.23 ft 3.46 ft 29 Average depth equation used Equation 2 Equation 2 30 If using equation 3, main pool perimeter (feet) 31 If using equation 3, width of submerged veg. shelf (feet) 32 Volume of the forebay (cubic feet) 11055 cf 11320 cf 33 Is this 15-20% of the volume in the main pool? Yes Yes 34 Clean -out depth for forebay (inches) 35 Design volume of SCM (cu ft) 30750 cf 42598 cf 36 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice, orifice diameter (inches) 3.0 in 4.0 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 2.6 2.0 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes Yes 42 Are berms or baffles provided to improve the flow path? No No 43 Depth of forebay at entrance (inches) 60 in 48 in 44 Depth of forebay at exit (inches) 60 in 48 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes 46 Width of the vegetated shelf (feet) 6 ft 6 ft 47 Slope of vegetated shelf (H:V) 6:1 6:1 48 Does the orifice drawdown from below the top surface of the permanent pool? Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1- yr, 24-hr storm? Yes Yes 501 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.) No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes 53 Species of turf that will be used on the dam and embankment Centipede I Centipede 54 Has a planting plan been provided for the vegetated shelf? Yes Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 1 2:53 PM 11/19/2020