Loading...
HomeMy WebLinkAbout310141_30 day poa_20201208PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 12/8/2020 1. Structure Name/Identifier (ID): I B&P Farms, Inc. 31-141 1 Bobby Sholar Farm 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 19.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 0.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 97026 ft2 e. line c/12 x line d x 7.48 gallons/ft3 30240 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 121058.1 W h. current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 7/28/2020 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 121058 ft' OW 56598.5 W 221479 gallons 1.42 Ibs/1000 gal. 357.4 Ibs. PAN PoA (30 Day) 12/8/2020 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 12/8/2020 1. Structure Name/Identifier (ID): I B&P Farms, Inc. 31-141) (2) Bobby Sholar Farm 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 1.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 39950 ft2 e. line c/12 x line d x 7.48 gallons/ft3 37353 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 40352.7 ft3 h. current herd # 1224 certified herd # 1224 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 7/28/2020 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 40353 ft3 0 ft3 37916.7 ft3 23304 gallons 1.16 Ibs/1000 gal. 70.4 Ibs. PAN PoA (30 Day) 2/21 /00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: B&P Farms, Inc. (31-141) (1) line m = 357.4 lb PAN 2. Structure ID: B&P Farms, Inc.(31-141) (2) line m = 70.4 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines +2+3+4+5+6= 427.8lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 6793 cp1 Small Grain 13.70 30.00 411.0 3/1 - 9/30 6793 cp2 Small Grain 9.30 30.00 279.0 3/1 - 9/30 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 690.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 427.8 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 690.0 lb. PAN y. Overall PAN balance (w - x) = -262 lb. PAN PoA (30 Day) 12/8/2020 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. As soon as weather permits I will resume pumping operation to get lagoon level back in compliance. PoA (30 Day) 12/8/2020