HomeMy WebLinkAbout820019_Plan of Action (POA)_20191224 S UB :.1-1 - 6-W-rr— avitof, "c /
•
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES ,
Facility Number: 82-19 County: Sampson
Facility Name: Kennedy Site
Certified Operator Name: Brandon Warren Operator Number: 19126
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: 1
Spillway(Y or N): N
Level(inches): 17
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population forthe receiving facility
3. Earliest possible date to begin land application of waste: 12/24/2019
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability,the information is
accurate and correct.
Warren Swine Farms Phone: '910-594-1701
Facility Owner/Manager(print).
Date: 12/24/2019
Facility Owner/Manager(signature)
.e
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25'YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: 1 • line m = 745.0 lb PAN
2. Structure ID: line m = lb PAN ,
•
3. Structure ID: line m = lb PAN
4. Structure ID: line m = lb PAN
5. Structure ID: line m = lb PAN
6. Structure ID: line m = lb PAN '
n. lines1 +2+3 +4+5+6= 745.0IbPAN
III. TOTAL PAN BALANCE REMAINING,FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract# p. field# - q. crop, r. acres s.remaining IRR-t.TOTAL PAN u.application window'
2 PAN balance BALANCE FOR
•
(lb/acre) FIELD(lbs.)
column r x s
5681 1A small grain overseed 3.68 75.00 276.0 Oct-Mar
5681 1 B small grain overseed 2.43 75.00 182.3 Oct-Mar
5681 1C small grain overseed 4.72 75.00 354.0 Oct-Mar
- 5681 1 D small grain overseed 4.76 75.00 357.0 Oct-Mar _
5681 1 E small grain overseed 5.83 75.00 437.3 Oct-Mar
5681 2A small grain overseed 1.64 75.00 123.0 Oct-Mar
5681 3A small grain overseed 5.16 62.00 319.9 Oct-Mar
5681 3B small grain overseed 1.31 75.00 ' 98.3 Oct-Mar
5681 4A small grain overseed 2.93 75.00 219.8 Oct-Mar
5681 4B small grain overseed 0.96 75.00 ,; 72.0 Oct-Mar _
5681 -5A small grain overseed 3.79 75.00 284.3 Oct-Mar
5681 5B small grain overseed 5.19 24.00 124.6 Oct-Mar
5681 5C small grain overseed • ' 5.19 75.00 389.3 Oct-Mar
5681 5D small grain overseed 4.01 75.00 300.8 Oct-Mar
i ,
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields/(sum of column t)= 3538.2 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE/
•
w. Total PAN to be land applied (line n from section II)= • 745.0 lb. PAN
PoA(30 Day)2/21/00
r•
1 •
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED.PER WASTE STRUCTURE
1. Structure Name/Identifier(ID): 11
2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard
a. current liquid level according to marker 1 17.0linches
b. designed 25 yr./24 hr. storm &structural freeboard 1 19.01inches
c. line b- line a (inches in red zone) = 2.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 1 148836Ift2
e. line c/12 x line d x 7.48 gallons/ft3 185549 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 1 180ldays
g. volume of waste produced according to structural design I 2320941ft3
h. current herd# 1. 70401 certified herd#1 70401
actual waste produced = current herd# x line g = 232094 ft3
certified herd#
i. volume of wash water according to structural design 1 0I ft3
j. excess rainfall over evaporation according to design l 896001ft3
k. (lines h + i +j)x 7.48 x 30 days/line f= gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 11/8/20201 I 1.27Ilbs/1000gal.
m. ((lines e+ k)/1000)x line I = 745.0 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA(30 Day)2/21/00
•
x. Crop's remaining PAN balance (line v from section III) = 3538.2 lb. PAN
y. Overall PAN balance(w-x) = -2793 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based
on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the
PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility.
NARRATIVE:
Irrigation onto existing spray fields will continue as weather and field conditions permit.
PoA(30 Day)2/21/00