Loading...
HomeMy WebLinkAbout20200941 Ver 1_Request for Withdrawal_20201208Strickland, Bev From: Jim Mason <james.mason@threeoaksengineering.com> Sent: Monday, December 7, 2020 5:27 PM To: Roden Reynolds, Bryan K CIV (USA); Johnson, Alan Cc: Michael Wood Subject: [External] Albemarle Corporate Center (USACE Action ID No. SAW-2018-00566, NCDWR Project No. DWR 20-0941), Request to Withdraw Incomplete Section 404/401 Application Request Attachments: Albemarle Corporate Center -Request to Withdraw Current Application_12072020.pdf, COA_Agent Authorization -All Sig natures_UPDATED.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Bryan and Alan - Attached is the official request to withdraw the incomplete Section 404/401 Application Request for the Albemarle Corporate Center in Albemarle, North Carolina (USACE Action ID No. SAW-2018-00566, NCDWR Project No. DWR 20- 0941). This is being submitted per the request of both USACE and NCDWR and in advance of the re -submittal of an updated Pre -Construction Notification (PCN) package for the project. I have also attached a copy of the Agent Authorization form, which authorizes Three Oaks to submit this request on the City of Albemarle's behalf. We anticipate submitting the updated PCN package for the project to USACE no later than Friday, December 11, 2020. The updated PCN package will be submitted to NCDWR 30 days after submission of the required NCDEQ Pre -Notification Form, which will also be submitted no later than Friday December 11, 2020. The updated PCN package will be labeled Version 2.0 when submitted. Please let me know if you have any questions or require any additional information at this time. Thanks and have a great day, James Mason, MS, PWS Senior Environmental Scientist/Project Manager Three Oaks Engineering 324 Blackwell Street, Suite 1200 Durham, NC 27701 919-732-1300 (office) 704-604-8358 (mobile) james.mason@threeoaksengineering.com www.threeoaksen2ineerin2.com Three Oaks Engineering, Inc. 324 Blackwell Street, Suite 1200 Durham, NC 27701 (919) 732-1300 December 7, 2020 United States Army Corps of Engineers Charlotte Regulatory Field Office ATTN: Bryan Roden -Reynolds, PWS, Regulatory Project Manager 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 North Carolina Department of Environment & Natural Resources Division of Water Resources - Water Quality Regional Operations ATTN: Alan Johnson, Senior Environmental Specialist 610 East Center Ave., Suite 301 Mooresville, NC 28115 SUBJECT: Albemarle Corporate Center, Request to Withdraw Incomplete Section 404/401 Application Request in Anticipation of Re -Submittal of Application Request REFERENCE: Albemarle Corporate Center, Section 404/401 Pre -Construction Notification, Submitted July 21, 2020 (U.S. Army Corps of Engineers [USACE] Action ID No. SAW-2018-00566; N.C. Division of Water Resources [NCDWR] Project No. DWR 20-0941) Mr. Roden -Reynolds and Mr. Johnson: Three Oaks Engineering, Inc. (Three Oaks) is the authorized agent for the Albemarle Corporate Center, which is a proposed business center being developed by the City of Albemarle (City), North Carolina. Three Oaks submitted a Section 404/401 Pre -Construction Notification (PCN) to USACE and NCDWR on behalf of the City on July 21, 2020. Since that time, Three Oaks, Chambers Engineering, PA (the Prime consultant), and the City have been working to address agency comments, answer questions, and provide additional information related to the permit application request. On November 9, 2020, Mr. Roden -Reynolds requested via email that we re -submit a PCN with all of the additional/updated information included so that it could be reviewed all at once. Mr. Johnson followed via email on December 2, 2020 that he would like us to request a withdrawal of the original PCN request prior to submitting the updated PCN request (to which Mr. Roden -Reynolds also agreed to via email). Therefore, Three Oaks would like to formally request withdrawal of the original PCN submittal for the Albemarle Corporate Center, made on July 21, 2020, in anticipation of the re -submittal of an updated PCN request. Per the request of NCDWR, the updated PCN will be labeled Version 2.0. We anticipate submittal of the updated PCN to USACE by Friday, December 11, 2020. The submittal of the updated PCN to NCDWR will be 30 days after submittal of the NCDWR Pre -Notification Form, which is required prior to Three Oaks Engineering threeoaksengineering.com -------- - ------- - 0 the re -submittal of the PCN. The Pre -Notification Form will also be submitted no later than December 11, 2020.. If you have any questions or require additional information, please contact me at the number above or by cell (704-604-8358) or by email (james.masongthreeoaksen_ing eering com). Sincerely, James Digitally signed by James Mason Mason Date:2020.12.07 17:07:34-05'00' James Mason, PWS Senior Environmental Scientist/Project Manager Three Oaks Engineering, Inc. 324 Blackwell Street, Suite 1200 Durham, NC 27701 Cc: Keith Tunnell, Director of Economic Development, City of Albemarle Dylan Blalock, EI, Chambers Engineering, PA Three Oaks Engineering threeoaksengineering.com AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO. PLAN NO. PARCEL ID: 654702867363 STREET ADDRESS: 24524 South Business 52 S., Albemarle, NC 28001 Please print: Property Owner: City of Albemarle Property Owner: ATTN: Michael Ferris, City Manager The undersigned, registered property owners of the above noted property, do hereby authorize Nathan Howell of Three Oaks Engineering (Contractor/Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): Telephone: 704-984-9419 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Authorize Signature Authorized Signature Date: Z04 C Date: 02/05/2020