Loading...
HomeMy WebLinkAbout820011_Structure Evaluation Inspection_20180925 Structure Evaluation Inspection Facility Number: tr� -- // Date: Time in: //fl - Time out: 77 Farm Name: Farm 911 address: Owner Name: Phone Facility Contact: ,�T � � � -- Onsite Representative: Integrator: Certified Operator: Cert. Number Is storage capacity less than adequate? Yes No - If yes is waste level into the structural freeboard? Yes �o Was non-compliant level reported to.DWR POA receivety Structure: 1 2 3 4 5 6 Identifier: /52- ,%/-- /53- Spillway? ' /2 ' '• . _3() 7 /D Designed Freeboard (in.): . Observed Freeboard (in.): Are there any immediate threats to the integrity of any of to structures • observed? Yes No Do any structures lack adequate markers as required by the permit? Yes_ No Does any part of the waste.management system need repair Yes No Condition of field's 1u1 Condition of receiving crop d.. • Comments: b U s GL-- rev s -