Loading...
HomeMy WebLinkAbout20201706 Ver 1_PreFiling Email 30-Day Clock Reached Email_20201207Strickland, Bev From: laserfiche@ncdenr.gov Sent: Monday, December 7, 2020 12:01 AM To: drsaario@chirocabarrus.com Subject: Pre -Filing Time Clock has been reached for Saario Property Stream Crossing for Single Family Home Construction - 20201706 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Saario Property Stream Crossing for Single Family Home Construction that you submitted on 11/6/2020. The ID number for that project is 20201706, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses ore not monitored. ID#* 20201706 Version* 1 Regional Office* Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 11/6/2020 .................................................................................................................................................................................................................................................................................................... Contact Name * Robert Scott Saario Contact Email Address* Project Name* Project Owner* Project County* Owner Address: drsaario@chirocabarrus.com Saario Property Stream Crossing for Single Family Home Construction Robert and Melissa Saario Rowan Street Address 840 Campbell Rd Address Line 2 aty China Grove Rbstal / Zip Code 28023 Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - W 401 Water Quality Certification - Regular Express W Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No State / Frovince / Region NC Country United States Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below. * This project involves the construction of a 9-foot span by 12-foot wide aluminized steel arch culvert with exposed bottom across Irish Buffalo Creek at 840 Campbell Road, China Grove, NC. The stream bed is solid rock in the area and will involve the cutting back of the side slopes for the installation of the culvert. The ends will then have rip -rap placed to prevent erosion and a gravel roadbed will be placed for crossing. Please give a couple of dates you are available for a meeting. 11 /10/2020 11 /12/2020 11 /17/2020 11 /19/2020 11 /24/2020 Please attach the documentation you would like to have the meeting about. Saario Bridge Concept Drawing.pdf 205.33KB pdr only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 11/6/2020