HomeMy WebLinkAbout20200518 Ver 2_PreFiling Email 30-Day Clock Reached Email_20201205Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Saturday, December 5, 2020 12:01 AM
To: jeffrey.mcdermott@sunenergyl.com
Cc: Tankard, Robert
Subject: Pre -Filing Time Clock has been reached for Albemarle Beach Solar Site - 20200518
Ver 2
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Albemarle Beach
Solar Site that you submitted on 11 /4/2020. The I D number for that project is 20200518, Version 2.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored
ID#* 20200518 Version* 2
Regional Office* Washington Regional Office - (252) 946-6481
Reviewer List* Robert Tankard
Pre -Filing Meeting Request submitted 11/4/2020
Contact Name * Jeff McDermott
Contact Email Address* jeffrey.mcdermott@sunenergy1.com
Project Name* Albemarle Beach Solar Site
Project Owner* Albemarle Beach Solar, LLC
Project County* Washington
Owner Address: Street Address
192 Raceway Dr.
Address Line 2
aty
State / Frovince / Region
Mooresville
NC
Rbstal/Zip Code
Country
28117
us
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
r- 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit W Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
DWR Project # 20-0518, SAW-2018-
02357
Do you know the name of the staff member you would like to request a meeting with?
Chris Pullinger, Billy Standridge
Please give a brief project description below.*
Albemarle Beach Solar is a utility sized solar farm, consisting of
approximately 1,236 acres, located near Roper, NC. A preliminary
jurisdictional determination and PCN have already been approved by both
NCDWR and the USACOE. This modification involves a slight increase in
wetland impacts associated with main drive through the site. An application
for an approved jurisdictional determination has already been submitted
prior to the date of this modification, and should be consulted when the
modification is reviewed.
Please give a couple of dates you are available for a meeting.
11 /17/2020
11 /18/2020
11 /19/2020
11 /20/2020
12/1 /2020
Please attach the documentation you would like to have the meeting about.
Impacts Map 10282020.pdf 713.44KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 11/4/2020