HomeMy WebLinkAbout310528_Compliance Evaluation Inspection_20201202Type of Visit: Compliance Inspection Operation Review O Structure Evaluation O Technical Assistance
Reason for Visit (D/Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: 1�/�Arrival Time: : j� Departure Time: County:
Farm Name: �V�nnH 8(J \sZ 1 Owner Email:
Owner Name: Phone:
Mailing Address:
Physical Address:
Facility Contact:
Onsite Representative: 11
Certified Operator: _ pO /rx 6iolle
Back-up Operator:
r ...firm of Farm -
Swine
Wean to F
Wean to F
Feederto
Farrow to
Farrow to
Farrow to
Gilts
Boars
Other
Title:
Latitude:
Phone:
Integrator:
Certification Number:
Certification Number:
Longitude:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
La er
Non -La er
Design Current
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)? _
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
evidence of a past discharge from any part of the operation?
any observable adverse impacts or potential adverse impacts to the waters
'her than from a discharge?
Region: W 41Z
Design Current
Cattle Capacity Pop.
Dai r Cow
Dai Calf
Dai Heifer
Dr Cow
Non-Dai
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes [X No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes
❑ No
❑ Yes
X No
❑ Yes
[ No
❑ NA ❑ NE
❑ NA ❑ NE
❑NA ❑NE
511212020 Continued
Facility Number: I - Date of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
No
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
❑ No
❑ NA
❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5
Structure
6
Identifier: I
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
V] No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
�] No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes
No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
No
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes
�Nj No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes
FN71 No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
�j Yes
❑ No
❑ NA
❑ NE
❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate
Manure/Sludge
into Bare Soil
Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application
Outside of Approved Area
12. Crop Type(s): &1n WAC Svc ya" h
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes]
No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
® No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
® No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
Z No
❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements
❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
❑ Yes
0 No
❑ NA
❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
❑ Weather
Code
❑ Rainfall ❑ Stocking [:]Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections
❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
❑ Yes
M No
❑ NA
❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes
® No
❑ NA
❑ NE
Page 2 of
511212020 Continued
Facility Number: jDate of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes rV) No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes � No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ®No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes
[$a No
❑ NA
❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes
�j No
❑ NA
❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
❑ No
❑ NA
® NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
[A No
❑ NA
❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
No
❑ NA
❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
No
❑ NA
❑ NE
(Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessarv).
SW SwVA) &�
(Jt t-grc"t-& A / 50,1 d,1e �0\- I -%:1 SP-Olt "n aQt%Ral
r
�(c pn Co(A —1/" frtc t - c r cl/a �a r- —a a2U Ok Gi.�(xn�- c�-Uz J �!
�Jc ki— sv� �-?� �rrr;n on s<ur C/- aTe
Reviewer/Inspector Name:
Phone: q(0-(Ar:2 C'
Reviewer/Inspector Signature:
Date: 1�
Page 3 of 3 (/ 511212020