Loading...
HomeMy WebLinkAbout820013_Plan of Action (POA)_20200602 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-13 County: Sampson Facility Name: King Farm Finishing Certified Operator Name: Brandon Warren Operator Number: 19126- 1. Current liquid level(s) in inches as measured from the.current liquid'level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 2 3 4A Spillway(Y or N): N N N Level(inches): 15 16.5 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances,are. within acceptable ranges. - X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section Ill tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer,of waste to a site not covered in the facility's CAWMP. ✓ Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving.facility 3: Earliest possible date to begin land application of waste: 6/1/2020 • I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability,the information is accurate and correct. ' Warren Swine Farm Phone: 910-594-1701 . Facility Owner/Manager(print) ' Date: 6/2/2020 Facility Owner/Manager(signature) II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: •1 . line.I= 173862 gallons. 2. structure ID: , line I = gallons 3. structure ID: line I = gallons 4. structure ID: line I= " gallons 5. structure ID: line I= gallons 6. structure ID: • line I gallons n. lines 1 +2+3 +4+5+ 6= 173862 gallons o. line n/27154= 6.40 acre-inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD1'2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its.certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are • not considered available to receive waste. p: tract# q. field# r. soil type s. crop t..acres u. remaining v.maximum w.maximum - IRR-2 PAN ' application rate application balance (in/hr) amount(inches) (lb/acre) 3224 1S Foreston soybeans 4.36 120.00 0.5 1' - 3224 2S Foreston soybeans , - 3.21 120.00 0.5 1 3224 . 3S Foreston soybeans 3.21 120.00. 0.5 1 - 3224 • 4S Foreston - soybeans 3.21 120.00 .0.5 1 3224 5S Foreston soybeans 3.90 120.00 0.5 1 3224 - 10S Foreston soybeans • 2.98 120.00 0.5 . 1 3224 7 Norfolk coastal bermuda 2.98 - 148.00 . -0..5 • 1 3224 8 Norfolk coastal bermuda 2.41 155.00 0.5 1 3224 9 Norfolk coastal bermuda 0.98 240.00 0.5 1 . • x.total acres available during 5 day draw down (sum of column t)= 27.24 acres - IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE y line o = 0.24 inches per acre to be applied within 5 days PoA lc Day) 2/ci/00 line x If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump& haul and herd reduction options, recalculate new hydraulic load based on new information. Plan to land apply hydraulic load: 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar down in field; "trafficability"across soils; will soils absorb application without runoff, etc.) High moisture but have had 48 hrs of good drying conditions. 2. Date and amount of last rainfall event? DATE: 05/29/20 AMOUNT: 2.40 inches 3. Dates of last waste application event per field: Mid-May • 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in line"n"at appropriate seasonal (i.e. winter) application rates within 5 days? yes 5. Irrigation schedule for next 5 days-include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposed changes in application rates and amounts; and any other information for consideration. Irrigate daily beginning 6/1/2020. Run for short periods of time. An additional field is available. PoA(5 Day)2/21/00