Loading...
HomeMy WebLinkAbout820006_Sludge Survey (Testing Dates)_20191018 • ROY COOPER ' `�` y Governor `� J a,r 0 � t �9f MICHAEL S.REGAN ` 1F f W Secretary c+ '" LINDA CULPEPPER NORTH CAROLINA: OCT 2 .3. 2019 Director -• Environmental Quality October 18, 2019 FAYET7'EVILLE}RE, �ONALOFFIC. Greenwood Livestock LLC Colonel Lamb Farm PO Box 21.07 Elizabethtown,NC 28337 _ : Subject: Sludge Survey Testing Dates. Certificate of Coverage No: AWS820006 Colonel Lamb Farm Animal Waste Management System • Sampson County Dear Greenwood Livestock LLC: The Division of Water Resources (Division)received your sludge survey information on September,20,2019.. With the survey results,:you requested an extension of the sludge survey requirement for lagoon structure"3" at the Colonel Lamb Farm facility. Due to the:amount of treatment volume available, and the rate of sludge accumulation for the lagoon, the Division agrees that a sludge survey is not needed until December 31, 2024. The next sludge survey for lagoon structure"3".at Colonel Lamb.Farm should be performed before December 31, 2024. Please retain this letter and keep it with your farm records for reference. • Please call me at(919) 707-3705 if you have any questions. ' : Sincerely; .. Heath C. Robinson Animal Feeding Operations Program Cc: Fay_etteville_Regional O ce; Water Quality Regional Operations Section Permit.File AWS820006 • North Carolina Department of Environmental Quality I Division of Water Resources Q) 512 North Salisbury Street 11636 Mail Service Center I Raleigh;North 6rolin027699-1636 NOaTH D pIstelnomal D� ./� 919.707.9000 . Sludge.Survey Evaluation Form. Today'sDate 10/18/2019 Facility.# :. - 820006 Owner: Greenwood Livestock LLC Lagoon ID 3 Sludge Survey Received:. 9/20/2019 Sludge Survey Performed: . - 11/2/2018 Sludge.Depth(Row O):(ft) -- : 2.3 Existing Treatment Depth(Row P): (ft) 5.40 Start-Date: 1/1/1992 Facility age at time of survey:(yr) 27 Average Sludge Accumulation.(ft/yr): 0.09 _.. . Requested Extension: (yr) 5 5 Requested Due.Date. -. • - 2024 . . . Sludge.Accuniulation during extension period: (ft) 0.43 Treatment Depth Available after Extension: (ft) 4.97 . -. . : Sludge level.OK?. Ratio Estimates Based on Depth EXISTING. EXEMPTION Ratio of Sludge layer to total trmt depth 0.30 0.35. : . " ' Ratio of.Sludge depth OK? EXISTING: EXEMPTION. Average Sludge layer thickness(T) : 2.3 2.73 Depth of the lagoon from top of bank to bottom soil surface(D) 9.5 9.5 . Slope=Horizontal/vertical side slope(S) 3 3 Length at the top of inside bank(L) 477 477 Width at the top inside slope(W) 130 130 Thickness of existing liquid treatment zone( 5.40 - 4.97 Length at midpoint of sludge layer(Lm)=L-2S(D-(T/2)) 426.90 428.18 Width at midpoint of sludge layer(Wm)=W-2S(D-(T/2)) : . 79.90 81.18 Volume of sludge(Vs)=Lm*Wm*T 78451.41 94838.80 Volume in gallons(Vsg)=Vs*7.481 586895.02 709394:24 Thickness of total treatment zone(Z)=T+Y . • . 7.70 7.70. Length at midpoint of total treatment zone(Lz)=L-2(S)(D-(Z/2)) 443:10 443.10 Width at midpoint of total treatment zone(Wz)=W-2(S)(D-(Z/2)) 96.10 . 96.10 Volume of total treatment zone(Vz)=Lz*Wz*Z 327880.71 327880.71 Ratio(R)of sludge layer volume to total trmt volume ,0.239 0.289 .. Sludge Volume Ratio:OK? : `YES =' • Maximum extension until end of permit cycle Next survey to be done: (calendar yr).. . . , 12/31/2024 Notification letter mailed:. 10/18/2019