HomeMy WebLinkAbout20100696 Ver 1_401 Application_201008102 0 1 0 0 6 9 6
OF=?'?A?„F9
n ? -ffi -c
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification PCN Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps:
®Section 404 Permit ? Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number:
1 c. Has the N WP or GP number been verified by the Corps? ? Yes ® No
1 d. Type(s) of approval sought from the DWQ (check all that apply):
® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ? Riparian Buffer Authorization
1 e. Is this notification solely for the record
because written approval is not required? For the record only for DWQ 401
Certification:
? Yes ® No For the record only for Corps Permit:
? Yes ® No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes ® No
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below. ? Yes ® No
1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No
2. Project Information
2a. Name of project: Rogers Road Sidewalk Project
2b. County: Union
2c. Nearest municipality / town: Indian Trail
2d. Subdivision name:
2e. NCDOT only, T.I.P. or state
project no:
3. Owner Information
3a. Name(s) on Recorded Deed: Attached (two properties) 010
3b. Deed Book and Page No. DENR
=QUALITY
3c. Responsible Party (for LLC i f
applicable): 0490
3d. Street address:
3e. City, state, zip:
3f. Telephone no.:
3g. Fax no.:
3h. Email address:
Page 1 of 10
PCN Form - Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: ? Agent ® Other, specify: Town Engineer
4b. Name: Scott J. Kaufhold, P.E.
4c. Busines s name
(if applicable): Town of Indian Trail
4d. Street address: 100 Navajo Trail
4e. City, state, zip: Indian Trail, NC, 28079
4f. Telephone no.: 704-821-1314
4g. Fax no.: 704-821-1381
4h. Email address: sjk@engineering.indiantrail.org
5. Agent/Consultant Information (if applicable)
5a. Name: John D. Barnard, P.E.
5b. Business name
(if applicable): Eagle Engineering
5c. Street address: 2013 Van Buren Avenue
5d. City, state, zip: Indian Trail, NC, 28079
5e. Telephone no.: 704-882-4222
5f. Fax no.: 704-882-4232
5g. Email address: jbarnard@eagleonline.net
Page 2 of 10
PCN Form - Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): Attached (two properties)
1 b. Site coordinates (in decimal degrees): Latitude: Longitude: -
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to East Fork of Twelvemile Creek
proposed project:
2b. Water Quality Classification of nearest receiving water: C
2c. River basin: Catawba River Basin
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
The project limits are along a minor thoroughfare fronted by residential development.
3b. List the total estimated acreage of all existing wetlands on the property:
0 acrea
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
600 feet on property 1 and 106 feet on property 2
3d. Explain the purpose of the proposed project:
To construct sidewalk along the south side of the road. This project is a Congestion Mitigation and Air Quality Grant
(CMAQ).
3e. Describe the overall project in detail, including the type of equipment to be used:
The project will be the construction of sidewalk, generally on grade, with the installation of curb, gutter, and drainage
where it is needed.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
? Yes ®No ? Unknown
project (including all prior phases) in the past?
Comments:
4b. If the Corps made the jurisdictional determination, what type
? Preliminary ? Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (if known): Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for ? Yes ® No ? Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ? Yes ® No
6b. If yes, explain.
Page 3 of 10
PCN Form - Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
? Wetlands ® Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
W1 ? P ? T ? Yes ? Corps
? No ? DWQ
W2 ? P ? T ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P ? T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - PER or
(Corps - 404, 10
stream
length
Permanent
(P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
S1 ®P ? T
Pipe Trib to East Fork
of Twelvemille ® PER ? Corps
10
10
Creek
INT
?
®DWQ
S2 ? P ? T ? PER ? Corps
? INT ® DWQ
S3 ? P ? T ? PER ? Corps
? INT ? DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
? INT ? DWQ
S6 ? P ? T ? PER ? Corps
? INT ? DWQ
3h. Total stream and tributary impacts 10
3i. Comments: S1 - 36" RCP culvert with an end wall section
Page 4 of 10
PCN Form - Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number - (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Temporary T
01 ?P?T
02 ?P?T
03 ?P?T
04 ?P?T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If and or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
? Yes ? No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require mitigation, then you MUST fill out Section D of this form.
6a.
? Neuse
?Tar-Pamlico ? Other:
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number - Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Temporary T impact required?
B1 ?P?T ?Yes
? No
B2 ?P?T ?Yes
? No
B3 ?P?T ?Yes
? No
6h. Total buffer impacts
6i. Comments:
Page 5 of 10
PCN Form - Version 1.3 December 10, 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
The use of curb to minimize disturbance.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
The use of proper eriosion control.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? ? Yes ® No
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
2c. If yes, which mitigat ion option will be used for this
project? ? Mitigation bank
? Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form - Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation? ? Yes ® No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone 6c.
Reason for impact 6d.
Total impact
(square feet)
Multiplier 6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 7 of 10
PCN Form - Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
? Yes ? No
Comments:
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? 95%
2b. Does this project require a Stormwater Management Plan? ? Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: The Town is a Phase II Community and
meets all requirements through NPDES Permit. The Town is also a certified BMP reviewer.
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
? Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program
? DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project? Indian Trail
® Phase II
? NSW
3b. Which of the following locally-implemented stormwater management programs ? USMP
apply (check all that apply): ? Water Supply Watershed
? Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ® Yes ? No
attached?
4. DWQ Stormwater Program Review
? Coastal counties
? HQW
4a. Which of the following state-implemented stormwater management programs apply ? ORW
(check all that apply): ? Session Law 2006-246
? Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ? Yes ? No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No
5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No
Page 8 of 10
PCN Form - Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ? Yes ® No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
? Yes ? No
letter.)
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ? Yes ® No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Page 9 of 10
PCN Form -Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ? Yes ® No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes Z No
impacts?
? Raleigh
5c. If yes, ind icate the USFWS Field Office you have contacted.
? Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
U.S. Fish and Wildlife
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
U.S. Fish and Wildlife
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
National Historic Trust
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? 2008 NC FEMA FIRMS
Scott J. Kaufhold, P.E. / 8/2/2010
Applicant/Agent's Printed Name plican Agent's ' nature Date
(Agent's signature is valid only if an authorization letter from the applicant
is rovided.)
Page 10 of 10
PCN Form - Version 1.3 December 10, 2008 Version
Property One:
A. Applicant Information
Owner Information
3a. Name(s) on Recorded Deed: Starnes M H & Rebecca
3b. Deed Book and Page No.: 0361-921
3c. Responsible Party (for LLC if applicable): N/A
3d. Street address: 5303 Rogers Road
3e. City, state, zip: Monroe, NC, 28110
3f. Telephone no:
3g. Fax no:
3h. Email address:
B. Project Information and Prior Project History
Property Identification
1a. Property identification no.: 07093003D
1b. Site coordinates (in decimal degrees): 1505120.422 472812.662
2c. Property size: 3.181 Acres
Property Two:
A. Applicant Information
Owner Information
3a. Name(s) on Recorded Deed: Simpson Leslie B
3b. Deed Book and Page No.: 1177-869
3c. Responsible Party (for LLC if applic able): N/A
3d. Street address: 100 Sidney Ct.
3e. City, state, zip: Monroe, NC, 28110
3f. Telephone no:
3g. Fax no:
3h. Email address:
B. Project Information and Prior Project History
Property Identification
1a. Property identification no.: 07093261
1b. Site coordinates (in decimal degrees): 1505359.180 472698.538
2c. Property size: 0.384 Acres
U
O Z
Ji
0000000+ w U
DOM0000CD +Lno ? N
00 + + + + + +.I- z 0 Q1
} +tDmO -i N MCD ri W Z i
V- LD r- 00 (n -1
00000000000 p
w01-1-F-HHHH00 `-, is
C) 0 0 0 0 0 0 0 0 cu
wcnCD an0CD CD CD CD ++
= 0 + + + + + + +
tu- N J+ ,-? 01 0) O ,4 N M p ,?-i J J E
w > W Q CD M V- LD r*., 00 M --I
Q Q Q Q Q Q Q Q Q F- F Z Z
LL 0U>0Lo(niF- F- F- F- W W ?MLnnV)V)(?nV)Lo00 0 U o
O 0*iNMd' d
w O ,--i (N M V- U) to N 00 M
? U U U U U V U U U U U U U U U
W M
M
% 111"§0
Y
CY5 Z
Q U
Qotf z %
Q z ZQ ? "? ? 9?,? Q
D w
O ? z
U z LLI a z Z
14,
u
O :D LL
O z cn >
z O D g
!,? F Cj4Yp•
LL ~
W ? b? e x
z z ?n?
O?
U ~?"' Ww
"IN
C
g Q 5°9ld mod' 3 ? ?
°Y ? ,y? ? ?f? erWaN
"o 46t
N
w O If
I s °
O ?? °' ? ?'? ? o Z o W
?/ cct P W CO J
L.L W? °¢ M M Q V f? U p„a
c4l "W",
W Q a w? MQolg W0.algoocOcc
°
W
?' rn
Z ?nN N 44
b°NM3 Wce? c!?
Q N N N 3 r.aN Pow
oa
?zao ° wQH WAw
44 UD
WW ? q?Q (a?.?Fpz
P4 E.
0
z ?
,
91-61[(809 ", ZCi 698 IM)LI
Vp e,WmgdlV 6LOK )N'NmT 11?10u1
sobs nlp,,gw,,) 1901 oinia.,d 1-N tltlA ?OZ
03 N ub ON EMODN3 Mm ao/st/ol <
I'm'] AVI ?1,'O SIN
£s£T# *H'S??-? avow SHA90x
SINX11/?lHAO Mill
mrlvm:4QIS Q:4SodoHd
Mir 6wz/2o/ro ooz - .i
tl lxivilN H.??
sae Axa?tl.,.???., 29H .mN.h,-tla ?x ,x?,;?N•,?„??
lflOAV'I
:411S 'I'IVH:4AO
Ems- ?
:Uy - I
rays
5 __? PediW
elpzrk ?
&
Mi%J Iuey/? ?
i VV11-
t
I?
Y
Peoy
ua/? M Pea v
4
III
a?„o?o?ao II /3
rl?
00,
a.
gb
LI
LA
c
r.
••
/
U LQ?
U
a
?e°M"n uw z
i
I III,. • ? •
\ I o?
z
V
01
d
yA ?.
A
to
?o
' Gr0
?a
^ I I
GROW
/
woo IV_&
aw'..oa 01oz/cz/c
•9O-bEC fgL91 ?'? ZiZt-[881bOLl
uulpul
VD In-01V 6CO8Z )N '11-i
.hS.,Jp q Ij I901 -1 IV uaanp -eA I IOZ
91 3 N
,nvmmN No 3'0'6 a300V
61N3 mo 0 &UMI0N3 -m
1301 ova/to
60/aa/01 a
1
7s" AU ll". o,
I ? ?sss?
I ? os+s ,as sm ?M
zsir sooz/eo/ro .oz - .?
,10, 'UN
00+II OW 00+0 Wis
oy` ..............
?d
CSI
:
l?
?Uy
c
.
y?3 hqe
Jim m
a" w so Pat"
I I'
i i IL
1
1
I ?I
1 I
I
c?j I f I
? U I
c?v a i
? I
II
a I
I
I
1 I
I'
I
1 I
I
T>??? II
1 I
I
II
II
I
II
11
I
I
.I
l
II
II
II
.I
I'
?I
11
:? II
a
I :{ I
I I, 1
yl
I ;
I !.
'b I
I
I
I
r?.
I?.
I '
I ?.
I ,
'.I
1.
I•
I
I
I.
b
I
I
ql
?I
I .
a i a•'' rr I
LLS6# -?v"S
PH s?nodS-lade4? ,??
I
I
/
c
.I
-1
-I
rl
tl
I
1 ?.
I `
I >
I?.
I
?z
f?i1 W
K
I.
I ?
I
I
SIN:4W.1AO (1dYELI
N IVIAMIS QaSOdoad
rw ass ae \ \ :_ I
C
rY lei oil
AO - oo.u pus m mum
0 a ~
Y"
I I
; I
I ?
J I I ?,,
I I ?
I _
1,
• t
I
I I I
I _
.
j 'ffi?g I ? I ?s:
? R R
R
13
Ik,
?" a I
?1mnYrYYYYYrI I+
_g
g_
1 I I.
?..J I s
am us sn mmvR I h ??
Sidney
Court
6:0 i
s? m
I U ??W=ff
PI
i PT flit
I ?
---- 2
I ?ZZ?
I ? U
I
I\
\ A8 sm
VTT