Loading...
HomeMy WebLinkAbout090209_Plan of Action (POA)_20200602 PLAN OF ACTION (PoA): R HIGH FREEBOARD AT ANIMAL FACILITIES Facility:Number: 9 20 Of County: I (aIdei 1 Facility Narhe: r 1 O S • Near Certified Operator Name: . BCkYX(J • UI�S Operator.#. . 47914.3 1. Current liquid level(s)' in inches as measured from the: current liquid level in the lagoon:to the lowest point on the top of the:dam for lagoons without spillways;1 and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways:;: Structure 1 Structure 2 -Structure 3 Structure 4 ::Structure 5 Structure 6 Lagoon Name/Identifier (ID) I ._ Spillway (Yes or No):... .. . . 2. Level (inches): : . :. 3 _ .2. Check all.applicable items Liquid level is within the:designed structural freeboard elevations of one or more structures. Five and-30 day Plans of.Action are attached. Hydraulic:and agronomic balances are within acceptable ranges. : Liquid level is:within the 25 year 24 hour storm elevations for one or more structures. A 3. 0 day Plan of Action is attached. Agronomic-balance is within acceptable range. Waste is to be pumped and:hauled to off site locations.: Volume and: PAN content of waste to pumped and hauled is reflected in section III tables. Included within this: plan is a list of the proposed: sites with related: facility number(s); number.: acres and receiving crop information. Contact and secure approval from the Division of Water Quality.prior to transfer of waste to a:site not covered in the facility's certified animal waste management plan. :Operation will be partially or:fully depopulated_ -:attach a complete schedule:with,corresponding animal units and dates for depopulation. -if animals are to be moved to another permitted facility, provide facility number; lagoon ji freeboard levels and herd population for the receiving facility :3. Earliest possible date:to begin land application:of waste: Z07.0 I hereby certify that I:have reviewed the information listed above and included within the.attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct, pEyop -7 �:t ... . l`i 1 Lj��1.. Phone: -G,t(0) C1 t(0 -2/ 4 acility Owner/Manager(print): Date: � /20Z0:. Facility Owner/Manager(signature) PoA Cover Page 2/21/00 • II. TOTAL POUNDS.OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR.STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1.: Structure ID: : Billups Nursery line m 4:43.7 lb PAN : : : 2. Structure ID: line m lb PAN • 3. Structure ID:.: : line'm= lb PAN 4. Structure ID: line m = :lb PAN 5: Structure ID line m lb PAN • 6. Structure ID: :: . .. line m .. . :lb PAN n.1inee1 +2-+3+4+5+6= 443.7ibPAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. . • o. tract#.: p. field:# q. crop • r. acreS s.remaining IRR-t.TOTAL PAN u.application window 2 PAN balance BALANCE FOR (lb/acre) : . : FIELD(Ibs.) • . • column r X s . lUn -1 bermudagrass: :12.60 : 100.00 1260.0 March-Oct **guestimates on remaing PAN -only pumped a few times on bermuda : 'State current crop,ending application date or next.crop application,beginning date for available receiving crops during 30 day:draw down period.. ve Total PAN available for all fields(sum of column t)= 1260.0 ib. PAN IV,FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II)= • 443.7 lb. PAN : x. Crop s:remaining PAN balance line v from section III - 1260.0 lb. PAN . . y. Overall PAN balance(w x)= -816:lb. PAN : Line y.must show asa deficit: If line y does not show as a deficit, list course of action here including:pump and haul,depopulation, herd reduction, etc. For pump&haul and:herd reduction options, recalculate new PAN based on new information: If new fields are to be included as an option for lowering.lagoon level, add these fields to the PAN balance table and'recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the: ;receiving.facility.. • NARRATIVE: .: will begin_pumping as soon as field conditions allow. PoA(30 Day)2/21/00 :: • PLAN OF ACTION (PoA):FOR HIGH FREEBOARD AT-ANIMAL FACILITIES :. 30 DAY:DRAW DOWN PERIOD I; TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/.Identifier(ID): Billups Nursery : 2. Current liquid volumein 25:yr./24 hr. storm storage&structural freeboard a. current liquid level according to marker 23:0 inches b. designed 25 yr./24 hr. storm &structural freeboard 26.0 inches c. line b-line:a(inches in red zone)= 3.0 inches id. top of dike surface area according to design .. - (area at:below structural freeboard elevation) 56376 ft3 e, line c/12 x line d x 7.48 gallons/ft3 105423 gallons 3. Projected volume of waste:liquid produced during draw down period:: f. temporary storage period according to:structural`design 180 days.: g. volume of waste produced according to:structural design 46887 ft3 h. current herd# • 6400 certified herd.# 6400 • actual waste produced =:current herd# x line g = 46887 ft3. certified.herd# • i. volume of wash water:according to structural design 30976 ft3 j. excess rainfall over evaporation according to:design 37521 ft3. - k: (lines h + i +j)x 7.48 x 30 days/line f= `143845 gallons 4. Total PAN to be land applied during draw down period I: current waste analysis dated 9/17/2019 : 1.78 lbs/1000 gal.. m. ((lines e+ k)/1000):x lined= 443.7 lbs. PAN. REPEAT SECTION I FOR EACH WASTE::STRUCTURE ON SITE. (Click on the next Structure tab shown below) : PoA(30 Day)2/21/00 .