HomeMy WebLinkAbout090208_Plan of Action (POA)_20200807 PLAN OF ACTION(Poa)'FOR HIGH FREEBOARD•AT ANIMAL FACILITIES
•
Facility Number. 9-208 County:: Bladen
Facility Name: 2601-2
•
Certified Operator Name: 'Danny Tyner Operator Number: 28715
1. Current liquid level(s)in inches as,measured from the.current liquid level in the lagoon to the.
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in-the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1- Lagoon 2 Lagoon 3 Lagoon'4 Lagoon 5
Lagoon Name/ID: 2601
Spillway(Y or N): N '
Level(inches): - 19
2. Check all applicable-items
Liquid1evel is within the designed.structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year-24 hour.stomi elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within.acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume-and PAN content of waste
to be pumped and hauled is reflected•in.section Ilitables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of-waste to a site.
not covered in the facility's•CAW.MP.
Operation will be partially or fully.depopulated. •
*Attach a complete schedule with corresponding animal units and dates fro depopulation'
*if animals are to be moved to another permitted facility; provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: as conditions permit •
I'hereby certify that I"have reviewed the information listed above and included within the
attached Plan of Action,and to the best of my'knowiedge and ability,the information is
accurate and correct.
Murphy Brown, LLC , Phone: 910-293-3434,
Facility Owner/Manager(print)
Date: 8/712020
Facility Owner/Manager'(signature)
•
•
•
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 Y
HR.STORM,STORAGE ELEVATIONS,IN ALL WASTE STRUCTURES'FOR FACILITY
1. Structure ID: 2601 line M= 503.0
2. Structure ID: line m=
3. Structure ID: line m=
4. Structure ID: line m=
5. Structure ID: line m=
6. Structure ID: line m=
n. linesI +2+3+4.+5+6= 503.0
III. TOTAL PAN,BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAY
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30
o.tract.# p.field# q. crop r:acres S.remaining RR-t TOTAL PAN
2 PAN balance BALANCE FOR
(lb/acre) FIELD(Ibs.),
column r z s
T2108 H1C Bermuda 5.97 250.24 1493.9
T2108 HID Bermuda 6.93 . 141.73 982.2
T2108 H1E Bermuda 1.56 . 209.65 327.1
•
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v.Total PAN available for all fields(sum of column.t)= 2803.2
IV.FACILITY'S PoA.OVERALL PAN BALANCE
w. Total PAN to be land applied:(line n from section II)= 503.0
PoA(30 Day)2/21/00
•
x. Crop's remaining PAN balance(line v from section III)= 2803.2
y. Overall PAN balance(w-x)= " -2300
Line y must show as a.deficit. If line y:does not show as a deficit, list course of action here incl
haul,depopulation, herd reduction,etc.- For pump&haul and:herd reduction options, recalcuIE
on newinformation. If new fields are to be included as-an option for lowering lagoon level, add
PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
facility, provide information regarding the herd population and lagoon freeboard levels at the re
NARRATIVE:
Irrigation onto existing spray fields will continue as weather and field conditions permit.Additior
for pumping if needed.
PoA(30 Day)-2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier(ID): 2601
2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard
a. current liquid level according to marker 19.0
b. designed 25 yr./24 hr. storm&structural freeboard 19.6
c. line b-line a(inches in red zone)= 0.6
d. top of dike surface area according to design
(area at below structural freeboard elevation) 75000
e. line c/12 x lined x 7.48-gallons/ft3 26180
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180
g. volume of waste produced according to structural design 520045.3
h. current herd# 7104 certified herd# 7104
actual waste produced = current herd# x line g = 520045
certified herd#
i. volume of wash water according to structural design 0
j. excess rainfall over evaporation according to design 43750
k. (lines h+i+j)x 7.48 x 30 days/line f= 702865
4. Total PAN to be land applied during draw down.period
I. current waste analysis dated 7/16/2020. 0.69
m. ((lines e+k)/1000)x line I= 503.0
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA(30 Day)2/21/00