Loading...
HomeMy WebLinkAbout090201_Plan of Action (POA)_20200603 /'.. : PLAN OF ACTIIO (P©A) FOR HIGH FREE=OAR© AT ANLiAL FACIILiTiES: Facility Number:: I 2 0 l. :. : Ci wily::: to e .. . Yet ,Facility Name: 51ly Sry Pam, Aiwa Certified. /Cf2�a' C .®peratcr Dame:.. G!J' e perratir# -1. Current liquid level(s)'in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and frond the:current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 . Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): I .. Spillway (Yes or No): • .. . Level (inches): I • 2. Check all applicable items Liquid level is within the designed:structural•freeboard elevations of one or more structures.: Five . and 30 day.Plans of Action are attached. Hydraulic and agronomic balances are within - acceptable ranges.; Liquid level is within the 25year a - .q 2 r hour storm elevations for one or more structures. A 30.day • Plan of Action is attached. Agronomic balance is within acceptable.range, Waste is to be pumped:and hauled to:off site locations. :Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a,list of the • : proposed::sites.with related,facility number(s), number.acres and receiving crop information. Contact and secure approval from the Division if Water Quality prior t•; transfer of waste to a site n et covered in the facility's certified animal waste management plan. Operation:will be partially or fully depopulated. . . - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted:facility, provide facility number, lagoon : freeboard levels and herd population for the receiving facility 3. Earliest possible date,to begin;land application of waste:: ( f2O- I hereby certify that I have reviewed the inf.rmation listed:ab;•ve and included within the attached Plan f Action; and t•, the best cf my,knowledge and ability, the inf•rmation is accurate and c srrect. P iChard Sh hone: 910-S? • Facilit Owner/M nager(print) . - ' : Date: 6 .-3- 0 59 Facilitywner/Manager(signature) PIA Cover Page 2121/00 II. TOTAL POUNDS OF PAN STORED ' ITHIN STRUCTURAL FREEBSARD AND/OR 25 YR./24 'SIR.STORM STO;RAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1: Structure ID: Sling Shaw Nursery line:m = 104.6 lb PAN 2. Structure ID: line m= • lb PAN 3.. Structure:ID: linem lb PAN 4; Structure ID: line m = lb PAN 5. Structure ID: . line m lb PAN 6: Structure ID: line m= lb PAN n. 11ines1 +2 3+4 +5+6e 104.6IbPAN. III. T._.TAL PAN BALANCE REMAINING FOR AVAILA=.LE CROPS IURlNO 30 DAY DRAW I PERIOD. DO N•T LIST FIELDS TO WHPH-PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract#- p. field# q. crop f": acres s.remaining IRR-t.TOTAL PAN u.application window1 2 PAN balance BALANCE FOR (lb/acre) FIELD(Ibs.): .. . . .. .. columnrxs Odorri- 1 bermuda 3:73 175.00 : 652.8 Sept-April *guestimate on:PAN remaining - 'State current crop ending application date or next crop application beginning•date for available= :'receiving crops during 30 day draw down:period. v.:Total PAN available for all fields (sum of©•-lumm t)m 652.8 lb.PAN IV, FACILITY'S eo r, OVE 'ALL PAN BALANCE . . Total PAN to be land applied (line n frolirraectiOn II)= 104.6 lb PAN xa Cr•pp°s remaining PAN balance(line v from section III)a 652:8 lb. PAN y. Overall PAN balance(w e x)o -648 lb. PAN Line y must show.as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump&:haul end'herd reduction options, recalculate new.PAN based on new.information::If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate:the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. N ,RRATIVE: will apply_as soon as:field conditions allow. PoA(30 Day)2/21/00:: . .. PLAN OF ACT!.N (P•A)FOR HIGH FREEBOARD AT.ANIMAL FACILI>I IES 30 DAY DRAW. DOWN PERIOD : l:' TOTAL PAN T.: BE LAND APPLIED PER WASTE:STRUCTURE : 1. Structure Name/Identifier,(ID): ISling Shaw Nursery 2. Current liquid volume;in 25 yr./24- hr. storm storage&:structural freeboard a. current liquid level according to marker : 18.0 inches b. designed 25 yr./24 hr. storm,&structural freeboard 19.0 inches { c. line b-line a(inches in:red zone)_= 1:0 inches d. top of dike surface area according to design 1 (area at below structural freeboard elevation) 22201 ft2 e. line c/12 x line d x:7.48 gallons/ft3 13839 gallons 3. Projected volume of waste liquid produced during draw down period :f. temporary storage:period according to:structural design 180 days g., volume of waste produced according to structural design 1 .. 19048 Ift3 :h. current herd#. . :.2600 . certified herd#1 2600 actual waste produced = current herd# x line-g = 19048 ft3 certified herd# . i. volume of wash water according to structural design _ ft3 j. excess rainfall over evaporation according to design 14015 ft3 k..(lines h i j)x.7.48 x 30 days/line f= 41219 gallons ; 4. Total PAN to.be land applied during draw down period I:-current waste analysis dated 2/5/20201 1..90 Ibs/1000 gal. hi., ((lines e k)/1000)x line'I= 704.6 Ibs;-PAN-. REPEAT SECTION FOR EACH WASTE STRUCTURE ON SITE. (Cli�l� rn the next Structurre:tab eh.wii below) • • PoA(30 Day)2/21/00