PLAN OF ACTION (PoAy FOR HIGH FREEBOARD AT:ANIMAL FACILITIES -
Facility-Number:: ! I County:. ..,— - (1
Facility Name: Be n r+e P I Me-
[�a d 2 nnl :
Certified.operator Name: 3 . (� �(1. Operator PeAl 0k 3 ,
.
'1. Current liquid level(s), in inches as measured from the:current liquid level in .the lagoon ,to the
lowest point :on the top of the dam for lagoons without spillways;-and:from the, current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways..::
Structure 1 Structure 2, Structure 3 Structure 4 Structure.5 Structure 6
Lagoon Name/Identifier (ID): ::
•
: Spillway (Yes or:No): : .. . . . .. .. . .
Level (inches): ..
2. Check all.a licable items
pp _ _ - -
V Liquid level is within the:designed:structural freeboard elevations of:one:or more structures Five
and 30 day Plans of Action are attached. .Hydraulic and agronomic-balances,are within
acceptable ranges:: ' -
Liquid level is within the 25 year 24 hour storm elevations for:one or more structures. A 30 day
Plan of Action is attached. Agronomic:balance is within.acceptable-range. . . `
: :y3od
Waste is to be pumped and hauled to: off site locations. : Volume :and:PAN:content of waste to
umped .
p p and hauled is reflected in section III tables. Included within this:plan is a list of the
proposed.;sites: with related:facility riumber(s),: number.:acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste :
i.
to a site not covered in the facility's certified animal waste management plan.
Operation:will be partially or fully depopulated.. ..
--attach a complete schedule with corresponding:animal units and dates for depopulation
- if animals are to be moved to another,permitted facility, provide facility number, lagoon
' freeboard levels and herd population for the:receiving'facility -
3. Earliest possible date to begin land:application:of waste:: 41I1016a0
I hereby certify that I:have reviewed:the information listed above and included within the:attached Plan
of Action, and to the best of my knowledge and ability, the:information:is accurate and correct.
• GI V1U OtIOCCIen : Phone: ��0:-�75/-.�,1�9U
: Facility Owner/Manager(print):::
•
, Date: 6 !-•1 -...--°.
. Facility Owner/Manager(signature) ... .
PoA Cover Page 2/21/00
Place'
' II. TOTAL VOLUIVIE OF WASTE.STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS:
FOR ALL WASTE STRUCTURES FOR FACILITY... •
•
1. structure ID:
line I:_ 44961'gallons
• : 2. structure.ID: : : 0.: : : line I= gallons
• 3. structure ID line l= :gallons •
4: structure ID: line I= gallons
• 5. structure ID: • •: : • line I gallons :
6..structure ID: ineI = gallons
n. Tines 1 +2+3+4'+5+6 m. 44961'gallons
•
: = o. line n/27154= : : :1..66:'acre-inches
III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD1'?
1While this section deals with:hydraulic loading capacities, applications cannot exceed._ • :
• agronomic rate for receivingcro :accordin to its certified waste plan.
crop:according
2Fields.with no remaining PAN balance, no receiving crop, and/or completely saturated are:: :.
: not considered available to receive waste.
• p. tract# q. field# r. soil type s..crop t.acres. : u.remaining v.maximum W.maximum
: IRR2 PAN application rate application.:
balance (in/hr) amount(inches)
(Ib/acre)
: 1747 1 GbA bermuda graze 2.48 1:75 • 0.5 1
1747 , .' :2 GbA : . . ' bermuda graze_ . .: . .:'3.20 175 . : 0.5 : 1
1747 :: 3 GbA bermuda graze 3.16 175 . 0.5 1
4 GbA • bermuda graze :2.53 175 0.5 1
. 5 ExA. :. bermuda graze .. .1.02 .. .175 .. ::0.35 .. . :: 1 •
6 ExA bermuda_graze 13.78 175 0.35 1
,x.total acres available during 5 day draw down (sum of column:t)= 1:6.17 acres
IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE
y. line o = • 0:10 inches per acre to be applied within 5 days
line x
If uffklactE(IcD10c211131ffif hydraulic load listed in line y, list course of action here:including pump :
:and haul,depopulation, herd reduction, etc. For pump&haul and herd reduction options,
recalculate new hydraulic load based on new information.
Plan to.land apply:hydraulic load: .
'I. Describe moisture conditions of fields? (e..g. Is there.water standing in field; does irrigation_
equipment mar down infield; "trafficability"across soils;will soils absorb application.without runoff:etc.) .. .
•
some areas are still wet and some areas can be pumped on. Will select the dryest loactionsto pump. .no rain
in forecast until the weekend and 50-60%chance then. : - .
:2. .Date and amount of last rainfall event'?
DATE:. 05/29/20 :AMOUNT: :2.70 inches
3. Dates of last waste application event per field:
: May 25, 2020.:`
4. Given optimum soil and weather conditions;.is irrigation equipment capable:of applying the volume in: -
line"n"at appropriate seasonal (i.e. winter)application rates within 5 days'?
Yes:equipment and conditions are favorable Fields:are drying out:;
•
• :•5. Irrigation schedule for next:5 days-include daily schedule;;proposed application:rates:and:amounts •
per irrigation event;:changes,made in gun sizes, nozzles, "o" rings, operating time;:travel speed, etc. to::
:meet proposed changes in application rates and amounts; and:any:other information for..consideration. . . •
No changes to:equipment. Hopes to apply-Wed pm.based on-regular appication rates/amounts:Plans on
aerwaying on Thursday if:needed and field conditions allow.:
•
•
PoA(5 Day)2/21/00
•
PLAN OF ACTION (P®A) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
5 DAY DRAW_DOWN PERIOD
: I. TOTAL PAN TO BE LAND APPLIED:PER WASTE STRUCTURE • : : .
1: Structure Name/Identifier(ID): Bennett°Place
2. Current:liquid volume in 25 yr:./24 hr. storm storage&structural freeboard
• a current liquid level according to marker: 9:0 inches:
•
b.Idetigned 25 yr./24 hr, storm &structural freeboard 19.0 inches
c. line b-line a(inches in red zone) = .. 10:0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 42076 ft2
e. line c/12 x lined x 7.48 gallons/ft : :262274 gallons
3. Projected volume of waste liquid produced during draw;down period _
f temporary storage period according:to structural design - . .. 180 days
g volume of waste produced according to structural d"esign 44543 ft3
h.:current herd# 6080 • certified herd# 6080
actual waste produced = current herd# x g = : :44543 ft' :
certified herd#
is volume of wash.water according to structural design 0 ft3
j._excess rainfall over evaporation according to design.: 26133 ft3
- • k: (lines h +'i+j)x 7.48 x 5 days/line f=: 14685 gallons
: 4. Total PAN to:be land applied during draw down period : :
I. current waste analysis dated 2/4/2020 1.51. lbs/1000 gal.
m::((lines.e+ k)/1000)x line I:= 418.2 lbs. PAN
5 Total volume of waste to be land applied during 5.day draw down :
I.::total volume to be land applied line e+:line k= 44961 gallons