Loading...
HomeMy WebLinkAbout090183_Plan of Action (POA)_20200615 S- ve_ PLAN OF ACTION (PoA) FOR [{DGH FREEBOARD AT ANIMAL AL FACLUTDE Facility Number: County: Nader) Facility Name: Si! J&'I i 71 42 Certified Operator Name: SOIaC, cr-1 v ICXIwcul Operator# /631/ 1.. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure•3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): I Spillway (Yes or No): Level (inches): 1 I(0 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. V/ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. • - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: /2ORO I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. l�Saac Slna)d ari Phone: Facility Owner/Managelr'(print) 2 ✓.� ,, o .�,.. � � Date: (� 115) aDa FacilityOwner/M ger(signature) I g PoA Cover Page 2/21/00 f , II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREE;OARD AND/OR 25 YR./24 HR.STORNI STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Singletary Finishing 9-183 line m = 2447.3 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m= lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines1 +2+3+4+5+6= 2447.3lbPAN • III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract# p. field# q. crop r. acres s.remaining IRR-t.TOTAL PAN u.application window 2 PAN balance BALANCE FOR (lb/acre) FIELD(lbs.) column r x s 1068 1 fescue _ 13.60 148.00 2012.8 Aug-July 1068 2 fescue 16.20 148.00 2397.6 Aug-July 1068 3 fescue 7:30 148.00 1080.4 Aug-July 1068 9 bermuda 7.30 100.00 730.0 Mar-Sept 1068 10 bermuda = 7.30 100.00 730.0 Mar-Sept 1068 11 bermuda 15.50 100.00 1550.0 Mar-Sept ***PAN are estimates*** 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v.Total PAN available for all fields(sum of column t)= 8500.8 lb. PAN IV.FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II)= 2447.3 lb. PAN x. Crop's remaining PAN balance(line v from section III)= 8500.8 lb. PAN y. Overall PAN balance(w-x)= -6054 lb. PAN NARRATIVE: Will begin pumping as soon as field conditions permit. PoA(30 Day)2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEEOAr.D AT ANIGN,'L FACILITIES 30 DAY DN AW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID): Singletary Finishing 9-183 2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard a. current liquid level according to marker 16.0 inches b. designed 25 yr./24 hr. storm &structural freeboard 19.0 inches c. line b-line a(inches in red zone) = 3.0 inches d.'top of dike surface area according to design (area at below structural freeboard elevation) 188760 ft2 e. line c/12 x line d x 7.48 gallons/ft3 352981 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 261105.9 ft3 h. current herd# 7920 certified herd# 7920 actual waste produced = current herd# x line g = 261106 ft3 certified herd# i. volume of wash water according to structural design. 0 ft3 j. excess rainfall over evaporation according to design . 110110 ft3 k. (lines h + i+j)x 7.48 x 30 days/line f= 462782 gallons 4. Total PAN to be land applied during draw down period • I. current waste analysis dated\ 3/6/2020 3.00 lbs/1000 gal. m. ((lines e+ k)/1000)x line I,= • 2447.3 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. ' , (Click on the next Structure tab shown below) PoA(30 Day)2/21/00