Loading...
HomeMy WebLinkAbout20090544 Ver 1_More Info Letter_2010082421 A NCDEN R North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary August 24, 2010 DWQ # 09-0544 Mecklenburg County Ms. Lorin Stiefel DavidLand LLC 6707 Fairview Rd. Charlotte, NC 28210 Subject Property: Silver Landing Transportation Center REQUEST FOR INFORMATION- STORMWA TER MANAGEMENT PLAN Dear Ms. Stiefel, On June 29, 2009, the 401 Oversight/Express Review Permitting Unit of the Division of Water Quality (DWQ) issued a 401 Water Quality Certification to you and DavidLand LLC to place fill within or otherwise impact 0.294 of wetland and 873 linear feet of unnamed stream to Steele Creek in order to construct the proposed facility in Mecklenburg County. Condition #7 of the 401 Certification requires you to get a final written approval of the stormwater management plan (SMP) for the project from DWQ or a local delegated authority before the approved impacts can occur. When the SMP is approved by a local government, you are required to submit the following to the DWQ 401 Oversight office: • A copy of the approved SMP, including construction plans details, signed and notarized operation and maintenance (O & M) agreements(s), design calculations and other supporting information along with a valid "Approval Letter" from the local government or the listed documents stamped as "Approved" by the local government. On August 23, 2010, the DWQ received SMP sheets stamped as approved by the City of Charlotte from Brandon Plunkett, PE of John R. McAdams Company, Inc but without the design calculations and O & M agreements. Please submit the design calculations and operation and maintenance agreement(s) that were approved with the SMP plan sheets submitted to this office. Two copies of the requested information must be received by this office within thirty (30) days from the date of this letter. This letter only addresses the issues in question and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ until all conditions in the Certification are met including the SMP requirement. Thank you for your attention to this matter. If you have any questions or wish to discuss these matters further please do not hesitate to call Joseph Gyamfi, PE at 919-733-1786. 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX: 919-733-6893 Internet: http:l/h2o.enr.state.nc.us/ncwetlands/ One NorthCarohna aturallty An Equal Opportunity 1 Affirmative Action Employer Silver Landing Transportation Center - SMP Charlotte, Mecklenburg Co. Page 2 of 2 August 24, 2010 Sincerely, Ian McMillan, Acting Supervisor 401 Oversight/Express Review Program IJM/jg cc: USACE, Asheville Office File copy Alan Johnson, DWQ MRO Robert Zink, PE, City of Charlotte Brandon Plunkett, PE, John R. McAdams Co. Inc, 6701 Carmel Rd. Ste 205, Charlotte, NC 28226 ,ra