HomeMy WebLinkAbout090181_Plan of Action (POA)_20200616 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 9-181 County: Bladen
Facility Name: Farm 3092 "
Certified Operator Name: Johnny Cain Jr Operator Number: 987304
1. Current liquid level(s).in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways;and from the current liquid level
in the lagoon.to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: 30923
Spillway(Y or N): N
Level(inches): 19
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations,of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X . Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within"acceptable range.
Waste is to be pumped and hauled to off site.locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list.
of the proposed sites with,related facilitynumbers,number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transferof waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule With corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving.facility
3: Earliest possible date to begin land application of waste: as conditions-permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action,and to the best of my knowledge and ability,the information is
accurate and.correct.
Murphy Brown,LLC Phone: 910-293-3434
Facility Own 7.2a er(print'
Date: 6/16/2020
acuity Owner/Manager(signature).
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR.STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: 3092 line m= 1898.3 lb PAN
2. Structure ID: line m= lb PAN
3. Structure ID: line m= lb PAN
4. Structure ID: line m= lb PAN
5. Structure ID: line m= lb PAN
6. Structure ID: line m.= lb PAN
n..lines 1 +2+3+4+ 5+6= 1898.3 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o.tract# p.field# q.crop r.acres s.remaining IRR-t.TOTAL PAN u.application window'
2 PAN balance BALANCE FOR
(lb/acre) FIELD(lbs.)
column r x s
" 30923 3 Bermuda 2.87 178.98 513.7 March-Sept
30923 4 Bermuda 2.73 99.10 270.5 March-Sept
30923 5 Bermuda 1.99 240.47 478.5 March-Sept
30923 6 Bermuda 1.45 211.34 306.4 March-Sept
30923 7 Bermuda 5.31 154.75 821.7 March-Sept
30923 8 Bermuda 5.27 186.97 985.3 March-Sept
1State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v.Total PAN available for all fields(sum of column t)= 3376.2 lb.PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied(line n from section II)= 1898.3 lb.PAN
PoA(30 Day)2/21/00
x. Crop's remaining PAN balance(line v from section Ill)= 3376.2 lb.PAN
y. Overall PAN balance(w-x)= -1478 lb.PAN
Line y inustshow as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul,depopulation, herd reduction, etc. For pump&haUl and herd reduction options, recalculate new PAN
based on new information: If new fields are to be:included.as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels atthe
receiving facility.
NARRATIVE:.
Irrigation onto existing spray fields will continue as weather and field conditions permit.
•
PoA(30 Day)2/21/00
PLAN OF ACTION(PoA)FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I: TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE.
1. Structure Name/identifier(ID) 13092
2. Current liquid volume in 25 yr./24 hr.storm storage&structural freeboard
a, current liquid level according to marker ( 19.olinches
b. designed 25 yr./24 hr.storm&structural freeboard I 19:7linches
c. line b-line a (inches in red zone) = 0.7 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 228103
e. line c/12 x line d x 7.48 gallons/ft" 96685 gallons
3. Projected volume of waste liquid produced during:draw down period
f. temporary storage period according to structural design ( 180 days
g. volume of waste produced according to structural design I 2637431e
h. current herd#( 8000 certified herd# 8000
actual waste produced = current herd# x line g = 263743 ft°
certified herd#
I. volume of wash water according to structural design 0 ft3
j. excess rainfall over evaporation according to design 133060 ft3
k. (lines h+i+j)x 7.48 x 30 days/line f= 494681 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 6/1/20201 ( 3.21 Ibs/1000 gal.
m. ((lines e+k)/1000)x line I= 1898.3 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA(30 Day)2/21/00