Loading...
HomeMy WebLinkAbout20201692 Ver 1_Pre-Filing Meeting Request_20201105ID#* 20201692 Version* 1 Regional Office* Wilmington Regional Office - (910) 796-7215 Reviewer List* Robb Mairs Pre -Filing Meeting Request submitted 11/5/2020 .................................................................................................................................................................................................................................................................................................................................................. Contact Name * Mike Kirby, P.E. Contact Email Address* mkirby200@comcast.net Project Name* Oyster Harbour Boat Ramp Replacement Permit Application Project Owner* Oyster Harbour Homeowners Association, Inc. Project County* Brunswick Owner Address: Street Address 2191 Oyster Harbour Parkway Address Line 2 aty State / Frovince / Region Supply NC Rbstal / Zip Code Country 28462 United States Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: r- 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express W Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Robb Mairs Please give a brief project description below. The property owner, Oyster Harbour Homeowner's Association, Inc. (OHHOA) intends to replace the existing private- community elevated boat ramp. The existing elevated boat ramp has deteriorated over the years to the point that replacement is needed in the near future in order to ensure that community residents can safely launch boats for access to navigable waters for fishing and other recreational purposes. i ne existing eievatea boat ramp consists or two portions. i ne rirst portion is constructed of timber support piling, timber pile caps, timber stringers, and timber decking. It begins at the bulkhead that runs along the edge of the upland and extends approximately 114 feet in length out towards the Atlantic Intracoastal Waterway (AIWW). The second portion is constructed of a cast -in -place concrete slab that is supported on timber piling. The existing elevated concrete boat ramp begins at the end of the timber boat ramp (Sta. 1+14) and extends approximately 107 feet; ending at Sta. 2+21. The entire elevated boat ramp, timber and concrete, is approximately 16- feet. in width. A 6" x 8" timber curb guard runs along both sides of the existing boat ramp for the full length. Also, timber guard rails run along both sides of the elevated boat ramp for approximately the first 143 feet. In order to construct the new replacement elevated boat ramp, the existing dilapidated elevated boat ramp will be demolished and disposed offsite. The new replacement elevated boat ramp will be constructed, in place, to the same dimensions (length and width), top elevations, and slopes as the existing structure. The top elevation at the beginning of the new elevated boat ramp will be at +12.3 feet Mean Low Water (MLW) and the top elevation at the lower end of the new elevated boat ramp is -5.5 feet MLW; existing and proposed. The first 114 lineal feet of the new replacement elevated boat ramp will be constructed with treated timber; same as the existing timber elevated boat ramp. The new replacement concrete elevated boat ramp (approximately 107 feet in length) will be constructed of reinforced concrete slabs supported on reinforced concrete pile caps and prestressed concrete piles. A temporary steel sheet piling cofferdam will be installed around the perimeter of the area where the concrete portion of the elevated boat ramp is located. This will allow water to be pumped out to provide dry working access to this below -water area during construction. Additionally, approximately 215 cubic yards of mud will need to be temporarily excavated from an area of approximately 2,120 square feet from within the cofferdam. This is necessary so that the lower portion of the new concrete elevated boat ramp structure can be constructed at the specified elevations to ensure proper functionality and access during all tide cycles and water levels. The excavated material will be temporarily stored on the floating work barge during construction and then will be replaced back in its original locations after construction of the new concrete elevated boat ramp is complete. The temporary cofferdam structure will be removed when construction is complete. Existing adjacent fixed access decks, gangway ramps, and portions of the floating dock will need to be temporarily removed to allow access to the work area during construction. These structures will be replaced back in their original locations once all boat ramp construction is completed. All demolition and new construction work will be conducted from the water using one or two floating barges and other small work floats. As noted above, the proposed new replacement elevated boat ramp structure will be constructed in the same location as the existing structure. The existing elevated boat ramp structure is located within the range of approximately 2-feet to 14-feet from the eastern riparian property line and within the range of approximately 69-feet to 80-feet from the western riparian property line. A riparian property owner waiver will be requested from the neighbor located on the eastern side of the elevated boat ramp property to give permission for the new replacement elevated boat ramp being constructed inside of the 15-feet riparian offset line. END Please give a couple of dates you are available for a meeting. 11 /20/2020 12/4/2020 Please attach the documentation you would like to have the meeting about. Oyster Harbour Boat Ramp P1 - P6.pdf 2.52MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Ake Zaf Submittal Date 11/5/2020 FOR PERMITTING PURPOSES ONLY; DO NOT USE FOR CONSTRUCTION r 4 S fC3LD S.tige�r}ijf 1�I} nip a r? GEC -• ,�w Vv Odell VAI&6sanVL �3 Muniripali4irpnr ;; �G '''' 5pr7m Ocean.lsle L:oline Bi-anch Y '' 6eacli d d Creek �'- J '�`r -._ - ` __.- _ . �'r1�•. • � rah+ . SHALLOTTE `c' ZZ APPLICANT: OYSTER HARBOUR HOMEOWNER'S ASSOCIATION, INC. 2191 OYSTER HARBOUR PARKWAY SUPPLY, NC 28462 AGENT: MIKE KIRBY, P.E. 1158-1 VILLAGE CREEK LANE MOUNT PLEASANT, SC 29464 (864) 590-0256 email: mkirby@sigiellc.com 1,0 v f Skit Q7d--' �4ti f iJ, .Sr7flC [•�. _ ;edk -OCEAN ATLANTIC OCEAN (PLAN VIEW) LOCATION MAP PROJECT NAME: OYSTER HARBOUR BOAT RAMP REPLACEMENT PERMIT APPLICATION WATER BODY: ATLANTIC INTRACOASTAL WATERWAY (AIWW) CITY / TOWN: SUPPLY COUNTY: BRUNSWICK LAT.: 33' 54' 43.59" N STATE: N.C. LONG.: -78' 20' 54.94" W y0 C �1! h Nc; GRP- 4'�)3W Varnamtown l �— 4. ITT I Worerway a1 ulLl Cti �",I• 1 y ROJ ECT SITE 3483 BOONES NECK RD. SUPPLY, NC 28462 PROPOSED ACTIVITY: DEMOLISH THE EXISTING DILAPIDATED BOAT RAMP (TO BE DISPOSED OFFSITE) AND RE —CONSTRUCT A NEW BOAT RAMP IN THE SAME LOCATION IN ORDER TO PROVIDE RESIDENTS OF THE OYSTER HARBOUR HOMEOWNER'S ASSOCIATION WITH SAFE ACCESS TO NAVIGABLE WATERS FOR FISHING AND RECREATIONAL PURPOSES. 0 5, 000' GRAPHIC SCALE: 1" = 5,000' C A SEAL 049560 _ FILE: Oyster Harbour Boat Ramp P—base APPROVED BY: MWK SCALE: AS SHOWN ISSUE DATE: August 3, 2020 SHEET; P-1 of 6 FOR PERMITTING PURPOSES ONLY; DO NOT USE FOR CONSTRUCTION OYSTER HARBOUR HOMEOWNER'S I ASSOCIATION BOAT LANDING FACILITY APPROX. EDGE OF AIWW CDI 0 3 MARSH GRASS \ (TYPICAL) � o v I Io a W w J 6p REFER TO SHEET P-3 & o z I Io z P-4 FOR FOR ENLARGED ADJACENT PROPERTY OWNER: = I z _ �Fc/r NORTH CAROLINA DEPARTMENT I PLAN VIEWS OF PROJECT Ia ¢ OF TRANSPORTATION; AREA I z 300 DIVISION DRIVE I EXTENDED RIPARIAN cavil I AIWW WILMINGTON, NC; 28401 PROPERTY LINE I I o � � 0 I \ J o pRopFRT y ��NF ADJACENT PROPERTY OWNER: WILLIAM NEIL & HEATHER SENTER 3491 WINDY POINT RD. SW SUPPLY, NC, 28462 MLW = MEAN LOW WATER MHW = MEAN HIGH WATER d M N I ICI °FRTy I I I APPROX. 98 FT. FROM END OF �iNF N I EXISTING BOAT RAMP TO EDGE OF CORPS CHANNEL titleM ,,'' — —r.°i 290.48' (APPROX.) FROM ilylili IlilihKIP hjl''li'Ii�IIIIiUU AIWW CORPS CHANNEL i CENTERLINE TO APPROX. EDGE OF MARSH GRASS SURVEY REFERENCES 1. PLAT BY HOBBS SURVEYING COMPANY, INC. TITLED BELLAMY PLACE MINOR SUBDIVISION DATED 1-3-2000 RECORDED BOOK 22 PAGE 259; DATE 2-7-2000 2. TMS: 230-00-06-506 SURVEY NOTES 1. HORIZONTAL DATUM: NAD83 (2011) NORTH CAROLINA STATE PLANE SURVEY FEET. 2. THIS MAP IS AN PARTIAL AS -BUILT AND HYDROGRAPHIC SURVEY OF A RESIDENTIAL DOCK. NO LOT SURVEY HAS. BEEN PROVIDED AT THIS TIME. PROPERTY LINES & OTHER INFORMATION WERE TAKEN FROM THE REFERENCE PLAT. 3. CONTOURS SHOWN HEREON ARE REFERANCED TO MEAN LOW WATER (MLW) 4. CONTROL MONUMENT UTILIZED: BAILEY PID: AJ4929 NC/BRUNSWICK N: 85,841.37 E: 2,186,627.19 ELEV:41.5 NAVD 88 APPLICANT: OYSTER HARBOUR HOMEOWNER'S ASSOCIATION, INC. 2191 OYSTER HARBOUR PARKWAY SUPPLY, NC 28462 AGENT: MIKE KIRBY, P.E. 1158-1 VILLAGE CREEK LANE MOUNT PLEASANT, SC 29464 (864) 590-0256 email: mkirby@sigiellc.com '0� M I ICD �i� _ W Z _ I O I N I l M yCS�� i l I EXTENDED RIPARIAN Illi TIi CI APPROX. CHANNEL WIDTH = 72 FT PROPERTY LINE APPROX. EDGE OF o 3 z MARSH GRASS w � I M (TYPICAL)�� `' z I w I w I REFER TO SHEET P-3 a- a AIWW & P-4 FOR FOR a M: I a I I ENLARGED PLAN VIEWS AIWW OF PROJECT AREA HYDROGRAPHIC SURVEY DATA, AIWW BOTTOM CONTOUR ELEVATIONS, AND ELEVATIONS OF EXISTING & PROPOSED BOAT RAMP STRUCTURE ARE REFENCED TO MEAN LOW WATER (MLW) VERTICAL DATUM; IN FEET. (PLAN VIEW) OVERALL PROJECT SITE & KEY SHEET PROJECT NAME: OYSTER HARBOUR BOAT RAMP REPLACEMENT PERMIT APPLICATION WATER BODY: ATLANTIC INTRACOASTAL WATERWAY (AIWW) CITY / TOWN: SUPPLY COUNTY: BRUNSWICK LAT.: 33' 54' 43.59" N STATE: N.C. LONG.: —78' 20' 54.94" W APPROX. EDGE OF MARSH GRASS (TYPICAL) 583 FT. I (APPROX.) WIDTH FROM EDGE OF MARSH GRASS TO EDGE OF MARSH GRASS 0 100' GRAPHIC SCALE: 1" = 100' PROPOSED ACTIVITY: DEMOLISH THE EXISTING DILAPIDATED BOAT RAMP (TO BE DISPOSED OFFSITE) AND RE —CONSTRUCT A NEW BOAT RAMP IN THE SAME LOCATION IN ORDER TO PROVIDE RESIDENTS OF THE OYSTER HARBOUR HOMEOWNER'S ASSOCIATION WITH SAFE ACCESS TO NAVIGABLE WATERS FOR FISHING AND RECREATIONAL PURPOSES. CA SEAL 049560 _ 6 — MHHW = +5.22' MLW 5 — MHW = +4.85' MLW 4 3 — NAVD88 = +2.85' MLW 2 0 — MLW = 0.0' — MLLW = -0.17' MLW TIDE SCALE FILE: Oyster Harbour Boat Ramp P—base APPROVED BY: MWK SCALE: AS SHOWN ISSUE DATE: August 3, 2020 SHEET; P-2 of 6 FOR PERMITTING PURPOSES ONLY; DO NOT USE FOR CONSTRUCTION EXISTING NRpOF NORTH CAROLINA DEPARTMENT EXISTING TIMBER BOAT RAMP (16' X 114'). EXISTING CONCRETE BOAT RAMP (16' X 107'). Rjy OF TRANSPORTATION; 04 BULKHEAD/�y 300 DIVISION DRIVE APPROX. EDGE OF PROPOSED: DEMOLISH/DISPOSE AND CONSTRUCT PROPOSED: DEMOLISH/DISPOSE AND CONSTRUCT i F WILMINGTON, NC; 28401 MARSH GRASS ��� NEW REPLACEMENT TIMBER BOAT RAMP IN THE NEW REPLACEMENT CONCRETE BOAT RAMP IN THE \ (TYPICAL) SAME FOOTPRINT. SAME FOOTPRINT. I M EXISTING `b LOCATION OF TRANSITION APPROX. 98 FT. FROM END PAVED rn I FROM TIMBER TO CONCRETE FEXISTING BOAT RAMP TO ACCESS / N BOAT RAMP EDGE OF CORPS CHANNEL I , ROAD T, _ _ _ _ (UPLAND) O+OQ I I � I � � -r- �_ �_ I — —' —' —' — — — — • — • — — . — . — •EXTENDED RIPARIAN PROPERTY LINE— — — - - — — — — — — — — — — — — — — �0.f20 I ITo1+1 i I� _ EXTENDED RIPARIAN PROPERTY LINE 4 I I I r — _ — . I I 0 0+60 I I 180" I I I-- _ T 16 FT. _ RIPARIAN T v -�I 00 CORRIDOR 15 FT. f •; r +40 Lo r rn� , _ LI I I I ;.•:.:l • : ,... r .. �. ' 2+O0 .` i'?. . 15 FT. OFFSET LINE 16 FT. ;,, • • i 2+60 EXISTING I _ II I I r :.•' — GAZEBO ° = II II II II II II II II II I I ——�.'�::. ,•• 2+40 (UPLAND) J _ IIIiI i i i i i i i i i i i — � I I II II I II I I III II II II II II II II III II II II III I I I I II � II ^� L I I I I I I I I I I I I I I I I II, I I l j j �I �I �I it i �I �I I IiI — — — J = IIIIIIII EXISTING EXISTING i I EXISTING FIXED I I11 FLOATING BULKHEAD I I ACCESS RAMP III Iil �5 DOCK AIWW APPROX. EDGE OF EXISTING 4' X 28' MARSH GRASS EXISTING FIXED GANGWAY / RAMP Ili III I I (TYPICAL) ACCESS DECK II 1i1 / � I EXISTING 3' X 15' IIiI EXISTING FIXED GANGWAY / RAMP Ilillil EXISTING I I FLOA N 65°5 '35" E I ACCESS WALKWAY I I II DOCK O � j 51.52' o IIIIIII 15 =FT. OFFSET LINE III Rpp wI __V_ .. �RTy4/�l�c o I g _.._.._._.._.._.._.._.._.._.._.._.._.._. I RIPARIAN _ 15 FT. WILLIAM NEIL & HEATHER SENTER CORRIDOR- 3491 WINDY POINT RD. SW — — — — — • — . — • EXTENDED RIPARIAN PROPERTY LINE — SUPPLY, NC; 28462 I — ' — ' — — — — — • — . — . — . — . — • — — — EXTENDED RIPARIAN PROPERTY LINE _ _ II —. —. HYDROGRAPHIC SURVEY DATA, AIWW BOTTOM CONTOUR ELEVATIONS, MLW = MEAN LOW WATER AND ELEVATIONS OF EXISTING & PROPOSED BOAT RAMP STRUCTURE (PLAN VIEW) ARE REFENCED TO MEAN LOW WATER (MLW) VERTICAL DATUM; IN FEET. EXISTING CONDITIONS MHW =MEAN HIGH WATER 0 20' GRAPHIC SCALE: 1" = 20' APPLICANT: OYSTER HARBOUR HOMEOWNER'S ASSOCIATION, INC. 2191 OYSTER HARBOUR PARKWAY SUPPLY, NC 28462 AGENT: MIKE KIRBY, P.E. 1158-1 VILLAGE CREEK LANE MOUNT PLEASANT, SC 29464 (864) 590-0256 email: mkirby@sigiellc.com PROJECT NAME: OYSTER HARBOUR BOAT RAMP REPLACEMENT PERMIT APPLICATION WATER BODY: ATLANTIC INTRACOASTAL WATERWAY (AIWW) CITY / TOWN: SUPPLY COUNTY: BRUNSWICK LAT.: 33' 54' 43.59" N STATE: N.C. LONG.: -78' 20' 54.94" W PROPOSED ACTIVITY: DEMOLISH THE EXISTING DILAPIDATED BOAT RAMP (TO BE DISPOSED OFFSITE) AND RE -CONSTRUCT A NEW BOAT RAMP IN THE SAME LOCATION IN ORDER TO PROVIDE RESIDENTS OF THE OYSTER HARBOUR HOMEOWNER'S ASSOCIATION WITH SAFE ACCESS TO NAVIGABLE WATERS FOR FISHING AND RECREATIONAL PURPOSES. C A SEAL 049560 _ diF8 31 b S D ,Q FILE: Oyster Harbour Boat Ramp P-base APPROVED BY: MWK SCALE: AS SHOWN ISSUE DATE: August 3, 2020 SHEET; P-3 of 6 FOR PERMITTING PURPOSES ONLY; DO NOT USE FOR CONSTRUCTION EXISTING BULKHEAD EXISTING PAVED ACCESS ROAD (UPLAND) NORTH CAROLINA DEPARTMENT I PROPOSED: CONSTRUCT NEW 16' X 114' REPLACEMENT OF TRANSPORTATION; 300 DIVISION DRIVE TIMBER BOAT RAMP IN THE SAME FOOTPRINT AS EXISTING. ., pQOp�RT WILMINGTON, NC; 28401 LOCATION OF TRANSITION FROM y�/iyF CO / TIMBER TO CONCRETE BOAT RAMP 0 ^ `O = I SEE SHEET 16 FT. N A CROSS-SEC-TION ° 00 I 1o+20I I ,I 1� — — — — —- \ I I I I 0+40 I II I I L EXISTING - GAZEBO (UPLAND) I -J EXISTING BULKHEAD rn 00 WILLIAM NEIL & HEATHER SENTER 3491 WINDY POINT RD. SW SUPPLY, NC; 28462 0+60 0+80I 1+00 I 1\ I I I I I - ,� ry 1 I SEE SHEET P-6 FOR / CROSS-SECTION A -A i PROPOSED: TEMPORARY EXCAVATION WITHIN THE LIMITS OF 1 THE TEMPORARY COFFERDAM IN ORDER TO CONSTRUCT THE 0' CONCRETE PORTION OF THE NEW BOAT RAMP. APPROX. 215 I CY OF MATERIAL WILL BE EXCAVATED FROM AN AREA OF APPROX. 2,120 SF IS ESTIMATED. THE EXCAVATED MATERIAL 1 WILL BE TEMPORARILY STORED ON THE FLOATING BARGE AND APPR SXj 98 FT. FROM END THEN REPLACED BACK IN THE SAME ORIGINAL LOCATIONS OF EXISTING BOAT RAMP TO AFTER PILING AND PILE CAPS ARE INSTALLED AND AFTER EDGE OF CORPS CHANNEL - - - - -INSTALLING THE NEW CONCRETE BOAT RAMP SLAB. - - - �• - . - . - . - . - • - EXTENDED RIPARIAN PROPERTY LINE �-- _ N I _%- - - - - - - -'- ' iu r i. - 1+60Y^' 20 20.2 I I I II II II III; III Ill�llllllllllil it I i ,i / : ,�'•:. '�',' ;.., ..: III IIIIIIII�I I I I I I 15 FT. RIPARIAN CORRIDOR 15-FT. OFF -SET - LIN -E-f -- 2+40 2+601 ^ 1 1 1i1 11 . I 1 1 1 1 1 1 RAMP 1 1 1 1 1 1 11 ifl I i it it I III Jill (EXISTING /PROPOSED) I I I I EXISTING PROPOSED: EXISTING GANGWAYS / RAMPS, II FIXED FLOATING DOCK, FIXED ACCESS RAMP, & FIXED I it ACCESS DECK TO BE TEMPORARILY REMOVED DURING BOAT WALKWAY RAMP DEMOLITION / CONSTRUCTION ACTIVITIES I ANRE-INSTALLED SAMEEXISTING LOCATION li lil AFTER THENEW BOATRAMPREP REPLACEMENT APPROX. EDGE OF PROJECT IS COMPLETE PROPOSED: CONSTRUCT NEW 16' X 107' MARSH GRASS REPLACEMENT CONCRETE BOAT RAMP IN (TYPICAL) THE SAME FOOTPRINT AS EXISTING. i 11111111 �1 PROPOSED: APPROX. LOCATION/LAYOUT LIMITS OF v AIWW J TEMPORARY SHEET PILE COFFERDAM FOR NEW BOAT ° RAMP CONSTRUCTION (APPROX. 120' X 28' = 3,360 SF). _.. _.. _.. _ 15.-FT. OFFSET LINE _ TO BE REMOVED UPON PROJECT COMPLETION. 15 FT. � RIPARIAN CORRIDOR - ,EXTENDED RIPARIAN PROPERTY LINE-� - - ' - - • - . - . - . - . - , - - EXTENDED RIPARIAN PROPERTY LINE HYDROGRAPHIC SURVEY DATA, AIWW BOTTOM CONTOUR ELEVATIONS, AND ELEVATIONS OF EXISTING & PROPOSED BOAT RAMP STRUCTURE ARE REFENCED TO MEAN LOW WATER (MLW) VERTICAL DATUM; IN FEET. APPLICANT: OYSTER HARBOUR HOMEOWNER'S ASSOCIATION, INC. 2191 OYSTER HARBOUR PARKWAY SUPPLY, NC 28462 AGENT: MIKE KIRBY, P.E. 1158-1 VILLAGE CREEK LANE MOUNT PLEASANT, SC 29464 (864) 590-0256 email: mkirby@sigiellc.com (PLAN VIEW) MLW = MEAN LOW WATER PROPOSED NEW BOAT RAMP MHW = MEAN HIGH WATER PROJECT NAME: OYSTER HARBOUR BOAT RAMP REPLACEMENT PERMIT APPLICATION WATER BODY: ATLANTIC INTRACOASTAL WATERWAY (AIWW) CITY / TOWN: SUPPLY COUNTY: BRUNSWICK LAT.: 33' 54' 43.59" N STATE: N.C. LONG.: -78' 20' 54.94" W PROPOSED ACTIVITY: DEMOLISH THE EXISTING DILAPIDATED BOAT RAMP (TO BE DISPOSED OFFSITE) AND RE —CONSTRUCT A NEW BOAT RAMP IN THE SAME LOCATION IN ORDER TO PROVIDE RESIDENTS OF THE OYSTER HARBOUR HOMEOWNER'S ASSOCIATION WITH SAFE ACCESS TO NAVIGABLE WATERS FOR FISHING AND RECREATIONAL PURPOSES. 0 20' GRAPHIC SCALE: 1" = 20' CA SEAL 049560 _ (iv v S' D ,Q FILE: Oyster Harbour Boat Ramp P—base APPROVED BY: MWK SCALE: AS SHOWN ISSUE DATE: August 3, 2020 SHEET; P-4 of 6 FOR PERMITTING PURPOSES ONLY; DO NOT USE FOR CONSTRUCTION PROPOSED: CONSTRUCT NEW 16' X 114' REPLACEMENT TIMBER BOAT RAMP IN THE SAME FOOTPRINT AS EXISTING. (VARYING ELEVATION / SLOPE THROUGHOUT). TOP ELEVATION OF THE EXISTING / PROPOSED REPLACEMENT TIMBER BOAT RAMP RANGES FROM APPROX. +12.3' MLW DOWN TO APPROX. +8.4' MLW; AS SHOWN BELOW. EXISTING: TIMBER GUARDRAIL PROPOSED: INSTALL NEW GUARDRAIL TO MATCH THE EXISTING WHEN THE NEW REPLACEMENT BOAT RAMP IS CONSTRUCTED (TYPICAL) +20 - TOP OF BOAT RAMP ELEV. = +12.3' MLW - (MHW) = +4.85' MLW (MLW) 0 -10 - 0+00 EXISTING BOTTOM (TYPICAL) I 1 1 0+20 0+40 0+60 PROPOSED: EXISTING TIMBER PILING AND BOAT RAMP TO BE REMOVED AND REPLACED WITH NEW TIMBER PILING AND BOAT RAMP (TYPICAL) EXISTING: TIMBER CURB PROPOSED: INSTALL NEW TIMBER CURB TO MATCH THE EXISTING WHEN THE NEW REPLACEMENT BOAT RAMP IS CONSTRUCTED (TYPICAL) PROPOSED: CONSTRUCT NEW 16' X 107' REPLACEMENT CONCRETE BOAT RAMP IN THE SAME FOOTPRINT AS EXISTING. TOP ELEVATION OF THE EXISTING / PROPOSED REPLACEMENT CONCRETE BOAT RAMP RANGES FROM APPROX. +8.4' MLW DOWN TO APPROX. -5.5' MLW; AS SHOWN BELOW. LOCATION OF TRANSITION FROM TIMBER TO CONCRETE BOAT RAMP (APPROX. STA. 1+114) I / I I 0+80 1+00 1+20 PROPOSED: NEW TIMBER PILING FOR NEW TIMBER BOAT RAMP (TYPICAL) TIMBER BOAT RAMP BEGINS AT STA. 0+00 AND CONTINUES TO APPROX. STA. 1+14 (EXISTING & PROPOSED REPLACEMENT) HYDROGRAPHIC SURVEY DATA, AIWW BOTTOM CONTOUR ELEVATIONS, AND ELEVATIONS OF EXISTING & PROPOSED BOAT RAMP STRUCTURE ARE REFENCED TO MEAN LOW WATER (MLW) VERTICAL DATUM; IN FEET. APPLICANT: OYSTER HARBOUR HOMEOWNER'S ASSOCIATION, INC. 2191 OYSTER HARBOUR PARKWAY SUPPLY, NC 28462 AGENT: MIKE KIRBY, P.E. 1158-1 VILLAGE CREEK LANE MOUNT PLEASANT, SC 29464 (864) 590-0256 email: mkirby@sigiellc.com MLW = MEAN LOW WATER MHW = MEAN HIGH WATER APPROX. EXTENTS OF PROPOSED TEMPORARY SHEET PILE COFFERDAM. ACTUAL LOCATION MAY VARY DURING CONSTRUCTION DEPENDING ON CONTRACTOR'S EQUIPMENT ACCESS REQUIREMENTS. Owrt OF BOA T (EXISTING & PROPOSED) �X* 13.51% 1+40% 1+60 1+80 PROPOSED: EXISTING TIMBER PILING AND CONCRETE BOAT RAMP TO BE REMOVED AND REPLACED WITH NEW CONCRETE PILING AND CONCRETE BOAT RAMP (TYPICAL) PROPOSED: NEW CONCRETE PILING FOR NEW CONCRETE BOAT RAMP (TYPICAL) CONCRETE BOAT RAMP BEGINS AT APPROX. STA. 1+14 AND CONTINUES TO THE END AT APPROX. STA. 2+21 (EXISTING & PROPOSED REPLACEMENT) (SIDE VIEW) PROPOSED NEW BOAT RAMP PROJECT NAME: OYSTER HARBOUR BOAT RAMP REPLACEMENT PERMIT APPLICATION WATER BODY: ATLANTIC INTRACOASTAL WATERWAY (AIWW) CITY / TOWN: SUPPLY COUNTY: BRUNSWICK LAT.: 33' 54' 43.59" N STATE: N.C. LONG.: —78' 20' 54.94" W APPROX. 98 FT. FROM END OF EXISTING BOAT RAMP TO EDGE OF CORPS CHANNEL EXISTING BOTTOM (TYPICAL) 2+00 2+20 - +20 - +10 (MHW) _ +4.85' MLW - 0 (MLW) BOTTOM OF BOAT RAMP ELEV. = -5.5' MLW 1 —10 2+40 2+60 APPROX. LIMIT/LOCATION OF LOWER END OF SHEET PILE COFFERDAM. ACTUAL LOCATION MAY VARY DURING CONSTRUCTION DEPENDING ON THE CONTRACTOR'S EQUIPMENT ACCESS REQUIREMENTS. APPROX. LIMIT OF PROPOSED TEMPORARY EXCAVATION TO ALLOW ADEQUATE DEPTH FOR DEMOLITION OF EXISTING CONCRETE BOAT RAMP AND CONSTRUCTION OF THE NEW REPLACEMENT BOAT RAMP. APPROX. 215 CY OF MATERIAL TO BE EXCAVATED FROM AN AREA OF APPROX. 2,120 SF. THE EXCAVATED MATERIAL WILL BE TEMPORARILY STORED ON THE FLOATING BARGE AND THEN REPLACED BACK IN THE SAME ORIGINAL LOCATIONS AFTER SUPPORT PILING AND PILE CAPS ARE INSTALLED AND AFTER INSTALLING THE NEW CONCRETE BOAT RAMP SLAB. NOTE: PROPOSED NEW REPLACEMENT BOAT RAMP TO BE CONSTRUCTED TO 0 20' APPROXIMATELY THE SAME TOP ELEVATIONS, SLOPES, AND PLAN -VIEW GRAPHIC SCALE: 1" = 20' FOOTPRINT AS THE EXISTING BOAT RAMP. PROPOSED ACTIVITY: DEMOLISH THE EXISTING DILAPIDATED BOAT RAMP (TO BE DISPOSED OFFSITE) AND RE —CONSTRUCT A NEW BOAT RAMP IN THE SAME LOCATION IN ORDER TO PROVIDE RESIDENTS OF THE OYSTER HARBOUR HOMEOWNER'S ASSOCIATION WITH SAFE ACCESS TO NAVIGABLE WATERS FOR FISHING AND RECREATIONAL PURPOSES. CA SEAL 049560 _ FILE: Oyster Harbour Boat Ramp P—base APPROVED BY: MWK SCALE: AS SHOWN ISSUE DATE: August 3, 2020 SHEET; P-5 of 6 NOTE: PROPOSED NEW REPLACEMENT BOAT RAMP TO BE CONSTRUCTED TO APPROXIMATELY THE SAME TOP ELEVATIONS, SLOPES, AND PLAN —VIEW FOOTPRINT AS THE EXISTING BOAT RAMP. TOP HEIGHT OF THE EXISTING TIMBER BOAT RAMP RANGES FROM APPROX. +12.3' MLW TO +8.4' MLW. PROPOSED NEW REPLACEMENT TIMBER BOAT RAMP TO BE CONSTRUCTED TO MATCH WITH SAME ELEVATIONS. PROPOSED: EXISTING TIMBER PILING AND BOAT RAMP TO BE REMOVED AND REPLACED WITH NEW TIMBER PILING AND BOAT RAMP (TYPICAL) EXISTING BOTTOM; ELEVATION VARIES WITH LOCATION (TYPICAL) PR( EX FOR PERMITTING PURPOSES ONLY; DO NOT USE FOR CONSTRUCTION TIMBER BOAT RAMP; APPROX. 16—FT. WIDTH (EXISTING & PROPOSED REPLACEMENT) no EXISTING: TIMBER GUARDRAIL (POSED: INSTALL NEW GUARDRAIL TO MATCH THE STING WHEN THE NEW REPLACEMENT BOAT RAMP IS CONSTRUCTED (TYPICAL) EXISTING & PROPOSED TIMBER STRINGERS / BOAT RAMP FRAMING (TYPICAL) Lj " Lill vV" L0 SFCTTnN A -A APPLICANT: OYSTER HARBOUR HOMEOWNER'S ASSOCIATION, INC. 2191 OYSTER HARBOUR PARKWAY SUPPLY, NC 28462 AGENT: MIKE KIRBY, P.E. 1158-1 VILLAGE CREEK LANE MOUNT PLEASANT, SC 29464 (864) 590-0256 email: mkirby@sigiellc.com (TYPICAL CROSS—SECTION) TIMBER BOAT RAMP (EXISTING & PROPOSED) EXISTING TIMBER PILING (TYPICAL) RPOPOSED NEW CONCRETE PILING (TYPICAL) EXISTING BOTTOM; ELEVATION VARIES WITH LOCATION (TYPICAL) CONCRETE BOAT RAMP; APPROX. 16—FT. WIDTH (EXISTING & PROPOSED REPLACEMENT) EXISTING: TIMBER GUARDRAIL PROPOSED: INSTALL NEW GUARDRAIL TO MATCH THE EXISTING WHEN THE NEW REPLACEMENT BOAT RAMP IS CONSTRUCTED (TYPICAL) EXISTING: 6" X 8" TIMBER CURB PROPOSED: INSTALL NEW TIMBER CURB TO MATCH THE EXISTING WHEN THE NEW REPLACEMENT BOAT RAMP IS CONSTRUCTED (TYPICAL) EXISTING / PROPOSED CONCRETE BOAT RAMP ' PROPOSED CONCRETE• PILE CAP FOR NEW CONCRETE BOAT RAMP'• .; S'i` r• a I., r ,•..,� � \//\/ vw HYDROGRAPHIC SURVEY DATA, AIWW BOTTOM CONTOUR ELEVATIONS, AND ELEVATIONS OF EXISTING & PROPOSED BOAT RAMP STRUCTURE ARE REFENCED TO MEAN LOW WATER (MLW) VERTICAL DATUM; IN FEET. (COSS-SECTION VIEWS) PROPOSED NEW BOAT RAMP PROJECT NAME: OYSTER HARBOUR BOAT RAMP REPLACEMENT PERMIT APPLICATION WATER BODY: ATLANTIC INTRACOASTAL WATERWAY (AIWW) CITY / TOWN: SUPPLY COUNTY: BRUNSWICK LAT.: 33' 54' 43.59" N STATE: N.C. LONG.: -78' 20' 54.94" W SECTION B-B (TYPICAL CROSS—SECTION) CONCRETE BOAT RAMP (EXISTING & PROPOSED) PROPOSED ACTIVITY: DEMOLISH THE EXISTING DILAPIDATED BOAT RAMP (TO BE DISPOSED OFFSITE) AND RE —CONSTRUCT A NEW BOAT RAMP IN THE SAME LOCATION IN ORDER TO PROVIDE RESIDENTS OF THE OYSTER HARBOUR HOMEOWNER'S ASSOCIATION WITH SAFE ACCESS TO NAVIGABLE WATERS FOR FISHING AND RECREATIONAL PURPOSES. CA SEAL 049560 _ MLW = MEAN LOW WATER MHW = MEAN HIGH WATER TOP HEIGHT OF THE EXISTING CONCRETE BOAT RAMP RANGES FROM APPROX. +8.4' MLW DOWN TO -5.5' MLW. PROPOSED NEW REPLACEMENT CONCRETE BOAT RAMP TO BE CONSTRUCTED TO MATCH WITH SAME ELEVATIONS. PROPOSED: EXISTING TIMBER PILING AND CONCRETE BOAT RAMP TO BE REMOVED AND REPLACED WITH NEW CONCRETE PILING AND CONCRETE BOAT RAMP (TYPICAL) 0 4' GRAPHIC SCALE: 1" = 4' FILE: Oyster Harbour Boat Ramp P—base APPROVED BY: MWK SCALE: AS SHOWN ISSUE DATE: August 3, 2020 SHEET; P-6 of 6