HomeMy WebLinkAboutNCG070089_SW Inspection_20201205ROY COOPER
Gm-ca nor
MICHAEL S. REGAN
5C( rerar p
BRIAN WRENN
-tcting Aircctor
General Shale Brick, Inc.
Attn: Warren Paschal
737 Colon Road
Sanford, NC 27330
NORTH CAROL.INA
Environmental Quality
December 04, 2020
Subject: COMPLIANCE EVALUATION INSPECTION
General Shale Brick, Inc.
Colon Road Facility, Certificate of Coverage-NCG070089
NPDES Stormwater General Permit-NCG080000
Lee County
Mr. Pachal:
On November 05, 2020 a site inspection was conducted for the General Shale Brick facility located at the
737 Colon Road, Lee County, North Carolina. A copy of the Compliance Inspection Report is enclosed for
your review. The site visit and file review revealed that the subject facility is covered by NPDES
Stormwater General Permit-NCG070000, Certificate of Coverage-NCG070089. Permit coverage
authorizes the discharge of stormwater from the facility to receiving waters designated as Little Buffalo
Creek, a Class C waterbody in the Cape Fear River Basin.
As a result of the inspection, the facility was found to be in compliance with the conditions of the
NCG070000 permit. Please refer to the enclosed Compliance Inspection Report for additional comments
and observations made during the inspection. The inspection was performed as a close out inspection
and the facility qualifies close the permit
Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil
penalty assessment of up to $25,000 per day for each violation. If you or your staff has any
questions, comments, or needs assistance with understanding any aspect of your permit, please contact
me at (919) 791-4200 or by e-mail at Thad.valentine@ncdenr.gov.
Sincerely,
j
L U4
Thad Valentine
Environmental Senior Specialist
North Carolina Department ni' Environrnental Quality Division of Eneryv. Mineral and Land Resourres
_�{I(� k.dci ,h 4lrgional ntiie<• 1i�28 htafl Ser v'r c Crnu�r 'i8n0 Elarrcl t D� .vc {ialcigh Nor th Caralrw 27Eillµ
Compliance Inspection Report
Permit: NCG070089 Effective: 06/01/18 Expiration: 05/31/23 Owner: General Shale Brick, Inc
SOC: Effective: Expiration: Facility: General Shale Brick, Inc
County: Lee 737 Colon Rd
Region: Raleigh
Sanford NC 27330
Contact Person: Kevin Ham Title: Phone: 423-282-4661
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 11/0512020 Entry Time 10:30AM
Primary Inspector: Thaddeus W Valentine
Secondary Inspector(s):
Certification:
Phone:
Exit Time: 11:30AM
Phone:
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Stone, Clay, Glass, and Concrete Products Stormwater Discharge COC
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG070089 Owner- Facility: General Shale Brick. Inc.
Inspection Date: 11/0512020 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Meet with Warren Paschal and all the paper work was in order. We walked the site and it was completely vegetated except
where the old building was located and it was completely gone except for the concrete floor. Looked at the outfall and there
were no problems there. The requested rescission is OK to approve
Page 2 of 3
" Permit: NCG070089 Owner - Facility: General Shale Brick, Inc.
Inspection Bate: 11/05/2020 Inspection Type: Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
0 ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
N ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
N ❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
0 ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
N ❑ ❑ ❑
# Does the Plan include a BMP summary?
0 ❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
N ❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
E ❑ ❑ ❑
# Does the facility provide and document Employee Training?
0 ❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
E ❑ ❑ ❑
# Is the Plan reviewed and updated annually?
0 ❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
0 ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
N ❑ ❑ ❑
Comment: Everrything is up to date
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? E ❑ ❑ ❑
Comment: Everything is up to date
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ❑ 0 ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑
Comment: NIA
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑
# Were all outfalls observed during the inspection? ■ ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑
# Has the facility evaluated all illicit (non stormwater) discharges? E ❑ ❑ ❑
Comment: All is in order
Page 3 of 3