Loading...
HomeMy WebLinkAbout20100687 Ver 1_401 Application_20100810 August 18, 2010 NC DWQ 401 Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 RE: Lake Norman Dear Cyndi, 2010p687 Our firm is processing this application on behalf of Darian Grubb to stabilize approximately 125 linear feet of shoreline by installing Keystone Block at 182 Malibu Rd., Mooresville, NC 28117 on Lake Norman, Iredell County, North Carolina. A copy of the Duke Power Company application, pertinent drawings and a location map are enclosed for your use. To access the project: From I-77 south take exit 33. At the end of the ramp proceed straight onto Alcove Rd. Turn right off of Alcove Rd. onto Catalina Dr. Turn Right onto Malibu Rd. House will be located on your right. We look forward to hearing from you at the earliest time possible. Sincerely, THE ROW OAT COMPANY, INC. Michael Degner Senior Designer ROWBOAT Dock & Dredge 858 Williamson Road Mooresville, NC 28117 (704) 663-3478 (866) 647-8679 (FAX) www.rowboatcompany.com v, Ls V lU? irl t J A iJG 2G;J DENR - WATF: QUALITY WETLANDS AND c T0R.,,, 1FF.R ERANICH Enclosed: Five (5) Copies Check #783, $240.00 W A TFh O 'C Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PC Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: NWP-13 &33 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ? Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ® Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ? No For the record only for Corps Permit: ® Yes ? No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Darian Grubb 2b. County: Iredell 2c. Nearest municipality / town: Mooresville 2d. Subdivision name: The Back Forty 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Darian & Yolanda Grubb 3b. Deed Book and Page No. db 1925 pg 2204 3c. Responsible Party (for LLC if applicable): 3d. Street address: 182 Malibu Rd 3e. City, state, zip: Mooresville, NC 28117 3f. Telephone no.: 704-200-0005 3g. Fax no.: 3h. Email address: 4 Page I of 10 PCN Form - Version 1.3 December 10, 2008 Version ,,.r,,..a ..- . 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 4646127565 1 b. Site coordinates (in decimal degrees): Latitude: 35.55654930559741 Longitude: - -80.876981 0 1 997375 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 0.711 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Lake Norman 2b. Water Quality Classification of nearest receiving water: WS-IV,B 2c. River basin: Catawba 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Single family residential medium density 3b. List the total estimated acreage of all existing wetlands on the property: none 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: none 3d. Explain the purpose of the proposed project: shoreline stabilizxation 3e. Describe the overall project in detail, including the type of equipment to be used: construct a block seawall on the 760 contour using small track equipment to stabilize 125' of shoreline 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: ? Yes ? No ® Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? ? Preliminary ? Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ? Yes ® No ? Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ? Streams - tributaries ® Buffers ® Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Tem ora (T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? No ? Corps ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ? P ? T ? PER ? Corps ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number - Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 ®P ? T Lake Norman fill lake 0.008 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 0.008 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. Pond ID 5b. Proposed use or purpose of 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) number pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 K Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No if yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) i If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ® Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason for Buffer Zone 1 impact Zone 2 impact Permanent (P) impact Stream name mitigation (square feet) (square feet) or Temporary required? T B1 ? P ®T access/wall LaWe Norman El Yes 1450sgft 300sgft B2 ? P ? T I ? Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 1450sgft 300sgft 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Small track equipment will be used ti construct the wall, construction of the wall will be done when lake level is below full pool 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. small track equipment will be used to construct the wall,any disturbed areas will be revegatated when construction is complete 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ? Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps ? Mitigation bank 2c. If yes, which mitigation option will be used for this project? ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version j 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a . Does the project include or is it adjacent to protected riparian buffers identified ® Yes ? No within one of the NC Riparian Buffer Protection Rules? 1 b . If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ®No Comments: project does not include storm water 2. Stormwater Management Plan 2a . What is the overall percent imperviousness of this project? % 2b . Does this project require a Stormwater Management Plan? ? Yes ® No 2c . If this project DOES NOT require a Stormwater Management Plan, explain why: total area of disturbamce is 0.043acres 2d . If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government 2e . Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Iredell county ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ? HQW ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) I 5a. Will this project occur in or near an area with federally protected species or habitat? ? Yes F-1 No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? F-1 Yes ®No 5c. If yes, indicate the USFWS Field Office you have contacted. ? Raleigh ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? - ? Yes ? No T - 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? -T - ? Yes ? No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Darian Grubb Applicant/Agent's Printed Name Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) Date Page 10 of 10 PCN Form - Version 1.3 December 10, 2008 Version _ FINISHED GRADE CAP _ BLOCK RIP- RAP 3' MAX TIE-BACK GEO-TEXTILE FABRIC UNDERNEATH #57 STONE TYPICAL WALL SECTION NTS i E 0 ( \ y U O m a E > Q? v n y x C) -?:D O m a Cm C', co co i O Q1 0 n < 0Z W)C04 ) E t I ; a n n 3 Q o co 40 co to w O . ,. -- o W a rr? o? C m '00 0co?vv 3 20' O O O ?-- ;4' - -? 12' .? .? .? } s' ` Z ? ° ! w D cry w w 0 0 0 W Q Q z? oW <O L W 4' ? 0 } m ar Om ¢ m a cn T_ 6' 3x20 RAMP ISSUED FOR: DATE: 90 52'0 1 "W GRUB B JOI 1 19.90' O-1 nt?yv 5? 104.05' 25' PROPOSED o WALL `? TYPICAL SECTION) BUFFER ZONE 1 t- 0 LOT UB o WIDE 1 l BUFFER ZONE-2 REF: MAP BY w CrAIG L. LONG DATED 316108 SCALE 0 10' 20' 40' 80' Lake Norman North Carolina PROPOSED SEAWALL for Approval INITIAL ISSUE 10-0104 SHEET 1 OF 1 [Ki 1010401 DUKE ENERGY LAKE EC12-Q P 0 BOX 1006 CHARLOTTE, NC 28241-1006 704-382-1567 or TOLL FREE 1-804-443-5193 APPLICATION FOR PERAHT TO STABILIZE THE SHORELINE IN NORTH CAROLINA. Please type or print and fill in all blanks. If information is not applicable, so indicate by placing a N/A in blank. PLEASE SUBMIT APPLICATION AND APPROPRIATE DUKE ENERGY FILING FEE, PAYABLE TO DUKE ENERGY; TO ABOVE ADDRESS. 1. Applicant Information A. Name YV,b,b B. Mailing Address / g Z h? a/ .h w 12 oa c/ ./1'?oo/le.tv.'Ile, wc. 7- 9? 117 C. Telephone 702' Z. 00 - OOO.S II. Location of Proposed Project A. Lake /Va rn-, a.v B. Street Address cc 40"' c-/ C. County _,_ D. City/ToNNm/Community or Landmark ?1-ioo? eSV%//e E. Section Lot # Subdivision merleh ?v r .v? F. Directions to property by roadZ-77 mafri 41 e-c iZl9-4 r v n. C a 1-GC L , _Ac4 0! ?Z4 :t o G. Latitude and Longitude for the project site SEE ATTACHED MAP Please submit a map showing the coordinates or a detailed map (USGS quad map, city map, etc.) showing the exact location of the project site. (NOTE: Latitude/Longitude coordinates can be found on internet site, mov.mapblast.com ) III. Description of Project A. Length of tall / 2,S Fe e 7- B. Material ?.v•/1 nic Qr eej I3 /oGk- we !/ C Kc yS?o.?e C. Distance from p or?perty line/shoreline .C? Share/.:ve IV. Intended Use of Project Area A. Private X B. Commerciar,- Date p?3/D V. Applicant's Signature 121 PLEASE NOTE THE FOLLOWING: • A COPY OF THE COMPLETED APPLICATION WITH A ROAD MAP SHOWING LOCATION OF THE PROPERTY MUST BE SUBMITTED TO: US ARMY CORPS OF ENGINEERS, 151 PATTON AVE. - ROOM 208, ASHEVILLE, NC 28801-5006 • A COPY OF THE "DUKE ENERGY APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE IN NORTH CAROLINA" AND SEVEN (7) COPIES OF THE COMPLETED "NC DIVISION OF WATER QUALITY PRE-CONSTRUCTION NOTIFICATION APPLICATION" MUST BE SUBMITTED WITH THE DIVISION OF WATER QUALITY APPLICATION FEE TO: NC DIVISION OF WATER QUALITY ATTENTION: CYNDI KAROLY PARKVIEW BLDG, 2321 CRABTREE ROAD RALEIGH, NC 27604-2260 (919) 733-1786 11/10/OOssb L• atitude and Longitude of a Point iTouchMap.com f Mabiie and D..ktap M.P. Home » Latitude and Longitude of a Point Page 1 of 1 Maps i Country - State I Places i Google Earth Cities I Earthquakes i I Ain Here I Lat - Long o find the latitude and longitude of a point Click on the map, Drag the marker, or enter the... + Address: 182 malibu rd. mooresville,nc Go „ Map Center: Get Address - Land Plat Size - Street View - Google Earth 3D - Area Photographs Try out the Google Earth Plug-in. Google Earth gives you a 3D look of the area around the center of the map, which is usually your last click point, and includes latitude, longitude and elevation information. from ATL To HNL Just found... $675° from Atlanta to Honolulu More Deals from Atlanta: $277" to Las Vegas $277" to Los Angeles $329" to San Francisco $284" to Seattle $188" to Boston $167" to New York $334" to Denver $167" to New York $207" to Miami $675" to Honolulu $235" to Cancun I $85" to Fort Lauderdale $220" to San Juan $159" to Philadelphia $327" to San Diego ^ Fares found recently. Click Note: Right click on a blue marker to remove it. I Show Point from Latitude and Longitude Clear/Reset All Markers I Center Red Marker I Use this if you know the latitude and longitude coordinates of .____.a point and want to see where on the map the point is. Use: + for N Lat or E Long - for S Lat or W Long. Get the Latitude and Longitude of a Point Example: +40.689060 -74.044636 Note: Your entry should not have any embedded spaces. When you click on the map, move the marker or enter an address the latitude and longitude coordinates of the point are inserted in the boxes below. Latitude: 35.55654930559741 Longitude: -80.87698101997375 Degrees Minutes Seconds Latitude: 35 33 23.5758 Longitude: -80 52 37.1316 Decimal Deg. Latitude: Decimal Deg. Longitude: Show Point Example: +34 40 50.12 for 34N 40'50.12" Degrees Minutes Seconds Latitude: F- Longitude: F_ F_ Show Point © iTouchMap.com 2007-2010 httn-//itcnichrnan.corndatlong.html 7/12/2010 Latitude and Longitude of a Point Q5/28/2010 SJ. ..ter" � f "' -'" �_' •* �' ".T`\ 05/2.8/20~1. !�