HomeMy WebLinkAbout20100548 Ver 1_DCM Permit_20100812Permit Class ty;r/.t._'A ` ?- Permit Number
NEW (EXPRESS PERMIT PROGRAM) 88-10
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and 0- C) 18
Coastal Resources Commission
ermtt
for #Ift&d?q
X Major Development in an Area of Environmental Conc* 1 n
pursuant to NCGS 113A-118 JJ?O - 2n!n
Kf?,?NR-W%RQU
Excavation and/or filling pursuant to NCGS 113-229 MOSroR;V PY ftcH
Issued to William Martinez, 101 Fairchild Downs Place, Cary, NC 27518
Authorizing development in
Carteret
County at adj. Harlowe Creek, along Settlement Lane,
Newport , as requested in the permittee's application dated 5/6/10. including attached
workplan drawings (6), dated 1-6 of 6 all dated 3/29/10
This permit, issued on August 10, 2010 is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be rtull and void.
Docking Facility
1) This permit authorizes only the docks, piers, and other structures and uses located in or over the
water that are expressly and specifically set forth in the permit application. No other structure,
whether floating or stationary, shall become a permanent part of this docking facility without permit
modification. No non-water dependent uses of structures shall be conducted on, in or over public
trust waters without permit modification.
2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the
docking facility. Any sewage discharge at the docking facility shall be considered a violation of this
permit for which the permittee is responsible. This prohibition shall be applied and enforced
throughout the entire existence of the permitted structure.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
May 23, 2015
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
James H. Gre son, Director
'bivision of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
William Martinez
ADDITIONAL CONDITIONS
Permit #88-10
Page 2 of 3
3) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts
of the structure and the adjacent property owner's riparian access corridor, which is determined by
drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that
intersects with the shore at the point where the upland property line meets the water's edge.
4) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
5) The authorized structure and associated activity shall not cause an unacceptable interference with
navigation.
6) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee shall not be relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
7) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest.
8) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
9) No portion of the authorized docking facility, including tie piles, shall extend more than one quarter of
the width of the water body. Measurements to determine width of the water body shall be made from
the waterward edge of any coastal wetland vegetation which borders the water body.
10) Any portion of the permitted access pier and docking facilities built over coastal wetlands shall not
exceed six feet in width and shall be elevated a minimum of three feet over the wetland substrate as
measured from the bottom of the decking.
11) This permit authorizes two formalized boat slips
General
12) The permittee understands and agrees that, if future operations by the United States requires the
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required,
upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or
obstructions caused thereby, without expense to the United States or the state of North Carolina. No
claim shall be made against the United States or the state of North Carolina on account of any such
removal or alteration.
William Martinez Permit #88-10
Page 3 of 3
ADDITIONAL CONDITIONS
13) No vegetated wetlands or open water areas shall be excavated or filled, even temporarily.
14) The authorized project is located within a primary nursery area (PNA). Therefore, in accordance with
T15A:07H.0208 of the Rules of the Coastal Resources Commission, no new dredging or excavation
within the PNA shall be permitted. Dredging in any manner, including "kicking" with boat propellers, is
not authorized. This prohibition shall be applied and enforced throughout the entire existence of the
permitted structure.
15) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 808-2808 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non-water
dependent activities are not authorized within 30 feet of the normal high water level.
NOTE: The permittee and/or his contractor is urged to meet with a representative of the Division prior to
project initiation.
NOTE: The U.S. Army Corps of Engineers authorized the proposed project under General Permit No.
197800056 (COE Action Id. No. SAW-2010-01204) which was issued on 7/29/10.