Loading...
HomeMy WebLinkAbout20201680 Ver 1_Pre-Filing Meeting Request_20201103ID#* 20201680 Version* 1 Regional Office* Raleigh Regional Office - (919) 791-4200 Reviewer List* Stephanie Goss Pre -Filing Meeting Request submitted 11/3/2020 .................................................................................................................................................................................................................................................................................... Contact Name * Philip May Contact Email Address* phil.may@carolinaeco.com Project Name* South State Street Sewer Improvements Project Owner* Project County* Owner Address: City of Raleigh Wake Street Address 3304 Lake Woodward Dr Address Line 2 aty Raleigh Fbstal / Zip Code 27604 Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No State / Province / Region NC Country USA Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below. * Sewer replacement project in Raleigh. Prelim JD and Buffer Determination requests have been submitted. Permit application preparation is underway and anticipated in approximately 30 days. No special or unusual circumstances on site requiring discussion ahead of time. Please give a couple of dates you are available for a meeting. 11 /9/2020 Please attach the documentation you would like to have the meeting about. StateStSewer_Fig3_FeaturesMap.pdf 21VIB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 11/3/2020 �!{ p y TL' * 4 � � r �� a' � �� P*=.. �' 1�� z� _,1i►:�. fig, is I f lit W�0 4,0 22 jo All va ix I j •$3; r:l d i ' rrPP i G T 5 .. .Ah Aim U r } Study Area South State OStreet � N CAROLINA Sewer Improvements Wetland ECOSYSTEMS Feet Wake County, NC 0 200 400 ON..# Intermittent Stream October 2020 ON-o Perennial Stream Figure 3: Aquatic Features 2017 NC Statewide Aerial Photography