HomeMy WebLinkAbout20201680 Ver 1_Pre-Filing Meeting Request_20201103ID#* 20201680 Version* 1
Regional Office* Raleigh Regional Office - (919) 791-4200
Reviewer List* Stephanie Goss
Pre -Filing Meeting Request submitted 11/3/2020
....................................................................................................................................................................................................................................................................................
Contact Name * Philip May
Contact Email Address* phil.may@carolinaeco.com
Project Name* South State Street Sewer Improvements
Project Owner*
Project County*
Owner Address:
City of Raleigh
Wake
Street Address
3304 Lake Woodward Dr
Address Line 2
aty
Raleigh
Fbstal / Zip Code
27604
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
State / Province / Region
NC
Country
USA
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below. *
Sewer replacement project in Raleigh. Prelim JD and Buffer Determination
requests have been submitted. Permit application preparation is underway
and anticipated in approximately 30 days. No special or unusual
circumstances on site requiring discussion ahead of time.
Please give a couple of dates you are available for a meeting.
11 /9/2020
Please attach the documentation you would like to have the meeting about.
StateStSewer_Fig3_FeaturesMap.pdf 21VIB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 11/3/2020
�!{ p
y TL'
* 4 � � r �� a' � �� P*=.. �' 1�� z� _,1i►:�. fig,
is I f
lit W�0
4,0
22
jo
All
va
ix I
j •$3;
r:l d
i
' rrPP
i G T 5
..
.Ah
Aim
U
r }
Study Area
South State
OStreet
� N CAROLINA Sewer Improvements
Wetland
ECOSYSTEMS Feet Wake County, NC
0 200 400 ON..# Intermittent Stream
October 2020 ON-o Perennial Stream Figure 3: Aquatic Features
2017 NC Statewide Aerial Photography