Loading...
HomeMy WebLinkAboutNCC205490_ESC Approval Submitted_20201203ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality, September 4, 2020 LETTER OF APPROVAL WITH MODIFICATIONS AND PERFORMANCE RESERVATIONS Wildlands Engineering, Inc. ATTN: Mr. Shawn Wilkerson 167-B Haywood Rd. Asheville, NC 28806 RE: Project Name: LITTLE TENNESSEE EAST BUFFALO MITIGATION SITE Acres Approved: 22.00 Project ID: GRAHA-2021-001 County: Graham City: Santeetlah Address: East Buffalo Road River Basin: Little Tennessee Stream Classification: East Buffalo Creek - Class C Submitted By: Stantec, Mr. Jake McLean, P.E. Date Received by LQS: August 6, 2020 Plan Type: Stream Mitigation Dear Mr. Wilkerson, This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications and Performance Reservations. A list of the modifications and performance reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at �'Q North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 NORfk CAPOLJNA � Upaftental Environmental OuaiRy 828.296A500 Letter of Approval with Modifications and Performance Reservations Wildlands Engineering, Inc. ATTN: Mr. Shawn Wilkerson September 4, 2020 Page 2 of 4 deq.nc.gov/NCG01. PIease direct questions about the eNOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B .0118 (a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, ed Walker, E. Express Engineer Land Quality Section Letter of Approval with Modifications and Performance Reservations Wildlands Engineering, Inc. ATTN: Mr. Shawn Wilkerson September 4, 2020 Page 3 of 4 Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Modifications and Performance Reservations ec: Mr. Jake McLean, P.E. (imcleanPwildlandseng.com) cc: Regional Office file Letter of Approval with Modifications and Performance Reservations Wildlands Engineering, Inc. ATTN: Mr. Shawn Wilkerson September 4, 2020 Page 4 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: LITTLE TENNESSEE EAST BUFFALO MITIGATION SITE Project ID: GRAHA-2021-001 County: Graham For final plan approval please provide to this office the requested documents listed below. 1. Install water bars with adequate outlet protection along access roads where road runs perpendicular to slope and before temporary stream crossings if the timber mat is at or below approach grade. {G.S. 113A-57.(3)1 2. Please add that no stream or riparian work shall take place during wet weather, provide more detailed narrative in construction sequence as to which reaches/stations will require bypass pumping, and provide more narrative as to which order the UT's should be completed in. 115A NCAC 04B .0106 (a) (3)} 3. Obtain 404/401 approvals from USACE and NCDEQ Water Quality Division before commencing construction activities associated with this project. 4. Confirm that NCDOT has granted encroachment access for the proposed project. PERFORMANCE RESERVATIONS Additional measures may be required - The developer is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site. Each sediment storage device must be inspected after each storm event. Maintenance and/or clean out, is necessary anytime the device is at 50% capacity. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities pot'. o r � o o � C ~ CD arm. CD• CD� CD CD CD �. CD CD O rA CD J p' o• �-, r M w o' Imo• w � �• � IrD �. A9 CD