Loading...
HomeMy WebLinkAbout20201859 Ver 1_Meeting Request Review_20201202ID#* 20201859 Version* 1 Regional Office* Asheville Regional Office - (828) 296-4500 Reviewer List* Kaylie Yankura Pre -Filing Meeting Request submitted 12/2/2020 ............................................................................................................................................................................................................................................................................................. Contact Name * Charles Drew Hauke Contact Email Address* Project Name* Project Owner* Project County* Owner Address: drew@draftlinetechnologies.com Buck Knob Island Lot 8 & 9 Tomahawk NC LLC Jackson Street Address 400 North New York Ave Address Line 2 Suite 208 aty Winter Park Rbstal / Zip Code 32789 Is this a transportation project? * r Yes r No State / Frovince / Region Florida Country United States Type(s) of approval sought from the DWR: r- 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit F- Modification W Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Kaylie Yankura Please give a brief project description below. We would like to install a seawall on Lots 8 & 9 on Buck Knob Island in Glenville, NC. The seawall will be approximately 400 ft in length and approximately 6 ft high. Please give a couple of dates you are available for a meeting. 12/3/2020 12/4/2020 Please attach the documentation you would like to have the meeting about State Permit Shoreline Stabilization NC 2 231.25KB pdf.pdf pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 12/2/2020 Reviewer Meeting Request Decision Has a meeting been scheduled?* r' Yes r No State of North Carolina Department of Environment and Natural Resources DWR Division of Water Resources Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 I. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: Tomahawk NC LLC Mailing Address: 400 North New York Ave Winter Park, FL 32789 Telephone Number: 407 927-3960 Fax Number: E-mail Address: drew@draftlinetechnologies.com 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www.saw.usace.armV.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTH ORIZATION FORM.pdf) must be attached if the Agent has signed this application form. Name: N/A Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Person to receive the Certification Approval: II. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 3 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Jackson Nearest Town: Glenville Subdivision name or site address (include phase/lot number): Buck Knob Island Lots 8 & 9 Directions to site - please include road names and numbers, landmarks, etc.: From Cashiers —Take HWY 107 North to Glenville School Rd. Turn left and follow Glenville Rd to the lake. Board caretakers boat for transit to the Island. Latitude (in decimal degrees) 35.1693 North Longitude (decimal degrees) 83.1331 West 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Undeveloped 6. Property size (acres): 1.534 acres 7. Lake/ river/ ocean adjacent to property Lake Glenville 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Install dry stack stone / rock seawall to stabilize the lakefront shoreline which is currently experiencing increasingly severe erosion. 9. Will work be conducted from land? x❑ From water? x❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: Footers 2 ft wide x 2 ft deep will be filled with rip rap rock along the entire length. Approximately 12,400 sq ft including the 20 ft x 200 ft temporary work area. Please see drawing 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in FORM: SSGP 10-2013 Page 2 of 4 square feet or acres: A 6 ft high retaining wall approximately 400 ft in length. Approximately 5,000 sq ft of area on the landside will be leveled. All trees that can be saved, will be saved. New native plants will also be installed. 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): Approximately 25 native rhododendrons and azaleas will be installed as needed for privacy and beautification. Owner/Agent's Signature* [15A NCAC 02H .0502(f)] Date 'Agent's signature is valid only if an authorization letter from the owner is provided. La ke (At Full Pond/ Normal Water Level) Full Pond/ Normal Water Level ����M SI FORM: SSGP 10-2013 Page 3 of 4 Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft) *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 4 of 4