Loading...
HomeMy WebLinkAbout090150_Structure Evaluation Inspection_20181002 1- 6.-/ 7- 9 • Structure Evaluation Inspection Facility Number: 4'a -- ./1/45—D Date: / o —p-— / S Time in: ( 1 4 '30 Time-out:• /� ! Farm Name: ,4,75K .1 Farm 911 address: Owner Name: uch S (;�_ 3 _ �.. Phone Facility Contact: Onsite Representative: Integrator: Certified Operator: Cert. Number • Is storage capacity less than adequate? Yes -No �. If yes is waste level into the structural freeboard? Yes No Was non-compliant level reported to DWR 'e5 POA received ye-3 Structure: 1 2 3 4 5 6 Identifier: • Spillway? '. Designed Freeboard.(in.): .: . . • Observed Freeboard (in.): Are there anyirrirnediate threats to the integrity of any of the structures observed? Yes .No Do any structures lack adequate markers as required by the permit? Yes No • Does any part of the.waste•management system need repair Yes No Condition of field's . Condition of receiving crop. 74 )0(.c , Comments: •