HomeMy WebLinkAbout090099_Plan of Action (POA)_20200602 Y44-
TV :cam ' v?A 01�c2Y9 S ev e,
PLAN OF ACTION ('oA) FO - IGH FREEBOARD AT:ANIMAL FACILITIES:
Facility:Number:: County:: '
Facility Name:_ S nI: kin •
:Certified Operator Name: I3(AJY11)jYJ1.�� S Operator:# - .179g3
1. Current liquid level(s) in inches as measured from the: current liquid level in the lagoon to the
lowest point:on the top of the'dam for lagoons without spillways; and_from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways:
Structure 1 Structure 2: Structure 3 Structure 4 :Structure:5 Structure 6
Lagoon Name/Identifier (ID) :.
Spillway (Yes or:No): .. .. .. . .
Level (inches): . : ..
2. Check all:applicable items :
.
Liquid level is within.the:designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges::
Liquid level is within the25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic'balance is within:acceptable range. .:
Waste is to be purriped and hauled to off site locations. Volume and:PAN: content of waste to
pumped and hauled is reflected in section III tables. Included within this:plan is a list of the
proposed=sites: with related facility number(s), number.: acres and receiving crop :information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
:Operation:will be partially.or:fully depopulated..
- attach a complete Schedule with:corresponding:animal units and dates for depopulation
• - if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard:levels and herd population for the receiving facility
3. Earliest possible dateto begin land application of waste: 5 31J/ 'Go?L►..
l
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
&117 / / cc S Phone: qi 8 sac'y t
� �
Facility Owner/Manage#(print): P
Date: (to fia 2D Z v
Facility Owner/Manager(signature) •
PoA Cover Page 2/21I00
II. TOTAL POUNDS OFF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR.STORM STORAGE ELEVATIONS.IN ALL WASTE STRUCTURES FOR FACILITY :
1: Structure ID:: Billup Finishing line m= - 230.0 lb PAN
2. Structure ID: •• line m :Ib PAN •
3: Structure ID: line m:= lb PAN •
4. Structure ID: :. line m= :. ::lb PAN
. 5. Structure ID:: line m= lb PAN
6. Structure ID: .. : : line m :lb PAN
•
n.:lines1 +2+3+4+:5+6= 230.0 PAN - .
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY-DRAW DOWN
PERIOD..DO NOT LIST•FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30:DAY PERIOD.
o. tract#: p. field# q. crop r. acres ,. s.remaining IRR-t.TOTAL PAN _u.application window :
2 PAN balance BALANCE FOR
(lb/acre) . = FIELD(Ibs:)
olumn r x s
1566 2 bermudagrass • 9:00 • 100.00 .: 900.0.March-Oct :
1566 . ... 3. bermudagrass . . " 3.00 100.00 •. . 300.0 March-Oct.
•
: 1565 2 bermudagrass • 1.70 100.00 :170.0 March-Oct
**guestimates on remaing PAN -only pumped a few times on:bermuda::
•'State.current crop ending application.date or next crop application beginning date for available
receiving crops during 30 day draw down period: • :-
v Total PAN available for all fields(sum of column t)= 1.370.0 lb. PAN
• N. FACILITY'S PoAOVERALL PAN BALANCE .
W. Total PAN to be land applied (line n from section Ell) 230.0 lb. PAN
:x. Crop's remaining PAN balance(linev from section:III)F 1370.0.lb.PAN. .:° :
: :y. Overall PAN balance(w=:x)= 1 , -1140 lb. PAN
Line y must show asp a deficit ilf line y does not show as a-deficit, list course of action here including pump and .
haul, depopulation; herd reduction, etc. 'For pump& haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to:be included as an option for lowering:lagoon level, add these
• fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels:at the
receiving facility:
NARRATIVE: . . . .
will begin pumping as soon as field conditions:allow. :
PoA(30 Day)2/21/00 • ..
•
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
• 30 DAY:DRAW DOWN PERIOD
I.: TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
• 1. Structure Name/Identifier.(ID): Billup Finishing
: 2..Current liquid volume:in 25:yr./24 hr. storm storage&structural freeboard;;
a. current liquid level according to marker 16.0 inches
b. designed 25 yr./24 hr. storm structural freeboard 19.0 inches
c. line b-line.a(inches in red zone) = • 3.0 inches .
::d. top of dike surface area according.to design ..
(area at below structural freeboard elevation) 47280 ft2
e. line c/12 x line d.x 7.48 gallons/ft3 88414 gallons
3. Projected volume of waste liquid produced during draw down period::
f. temporary storage period according to:structural design 180 days
g. volume of waste produced according to structural design 52748:7 ft3
- h. current herd# 1600 certified herd.# 1600
actual waste produced =:current herd# x line g = 52749 ft 3
certified herd#
volume of wash water according to structural design : 0 ft3
j. excess rainfall over evaporation according to design • , 27580 ft3.
k: (lines h+i+j)x 7,48 k 30. days/line:f= 100143 gallons:
4. Total PAN to be land applied during draw down enod.l. y 9/17/2019 1.22 lbs/1000 gal.• .currentwaste:anal sis dated:
m. ((lines e:+ k)/1000).x line I = : 230:0 lbs. PAN
. REPEAT SECTION I FOR EACH_WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below) • .
PoA(30 Day)2/21/00