Loading...
HomeMy WebLinkAboutNC0074268_Regional Office Historical File Pre 2018 ArfA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary • February 4, 2010 FEB - 5 2010 Mr. Rusty Bost, P.E., Assistant City Engineer City of Gastonia P.O. Box 1748 Gastonia, North Carolina 28053-1748 SUBJECT: City of Gastonia Crowders Creek WWTP—Additional Bar Screen A to C No. 074268A03 Transmittal of Approved Plans and Specifications Dear Mr. Bost: Enclosed is a copy of the plans and specifications, which were approved on February 3, 2010. The subject documents have been stamped "approved" for your records. A copy is also being forwarded to your engineer and to the Mooresville Regional Office. The Permittee should retain these documents for the life of the facility. Should you have questions regarding this matter, call me at (919) 715-6206. Sincerely, den pc:L.14.9 , Seth Robertson, P.E., Supervisor Design Management Unit kp:sr Enclosures cc: Steve Cavanaugh, P.E., Cavanaugh & Associates, P.A., Winston-Salem, NC DWQ Mooresville Regional Office Ken Pohlig, P.E. ATC File No. 074268A03 1633 Mail Service Center,Raleigh,North Carolina 27699-1633 one Location:2728 Capital Blvd.Raleigh,North Carolina 27604 NorthCarolina Phone:919-733.6900\FAX:919-715-6229\Customer Service:1-877-623-6748 // Internet:www.ncwaterquality.org �atural 'J An Equal Opportunity\Affirmative Action Employer '/ aiTtAt� K`.r: V ''J�6 . A NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary February 3, 2010 F E B - 4 2010 Mr. Rusty Bost, P.E., Assistant City Engineer City of Gastonia P.O. Box 1748 Gastonia, North Carolina 28053-1748 SUBJECT: Authorization to Construct A to C No. 074268A03 City of Gastonia Crowders Creek WWTP-Additional Bar Screen Gastonia County Dear Mr. Bost: A letter of request for an Authorization to Construct was received January 25, 2010, by the Division of Water Quality (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 6.0 MGD Wastewater Treatment Plant, with discharge of treated wastewater into Crowders Creek in the Catawba River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Installation of an additional mechanical bar screen (rated for 12 MGD peak flow) at the Crowders Creek WWTP headworks structure, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0074268 issued April 1, 2006, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0074268. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may 1617 Mail Service Center,Raleigh,North Carolina 27699-1617 One Location:512 N.Salisbury St.Raleigh,North Carolina 27604 North Carolina Phone:919-807-63001 FAX:919-807-6492\Customer Service:1-877-623-6748 // Internet:www.ncwaterquality.org Nature" An Equal Opportunity\Affirmative Action Employer ;/ Mr. Rusty Bost, P.E., Assistant City Engineer February 3, 2010 Page 2 be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Mooresville Regional Office, telephone number(704) 663-1699, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: Construction Grants & Loans, DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Mr. Rusty Bost, P.E., Assistant City Engineer February 3, 2010 Page 3 Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules,regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Seth Robertson, P.E. at telephone number(919) 715-6206. Sincerely, ija'4't:4--(114 (3 2 0,t-4--a--(2-.2--u-. 4,tf" Coleen H. Sullins kp:sr cc: Steve Cavanaugh, P.E., Cavanaugh & Associates, P.A., Winston-Salem, NC Gaston County Health Department Q Moore ,.' ::,. t , DWQ, Technical Assistance and Certification Unit DWQ, Point Source Branch, NPDES Program Ken Pohlig, P.E. ATC File No. 074268A03 City of Gastonia A To C No. 074268A03 Issued February 3, 2010 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Crowders Creek WWTP, located on U.S. Hwy 321 in Gaston County for the City of Gastonia, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of an additional mechanical bar screen (rated for 12 MGD peak flow) at the Crowders Creek WWTP headworks structure, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration No. Date Send to: Construction Grants & Loans DENR/DWQ 1633 Mail Service Center Raleigh, NC 27699-1633 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee._Freeman Governor Director Secretary' May 7, 2010 Mr. Rusty Bost, P.E., Assistant City Engineer MAY 1 3 2010 City of Gastonia P.O. Box 1748 Gastonia, North Carolina 28053-1748 • SUBJECT: Authorization to Construct A to C No. 074268A04 City of Gastonia Crowders Creek WWTP—Additional Bar Screens Gastonia County Dear Mr. Bost: A letter of request for an Authorization to Construct was received April 16, 2010, by the Division of Water Quality (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 6.0 MGD Wastewater Treatment Plant, with discharge of treated wastewater into Crowders Creek in the Catawba River Basin. • This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Installation of two (2) mechanical bar screens (each rated for 12 MGD peak flow) at the Crowders Creek WWTP headworks structure, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0074268 issued April 1, 2006, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0074268. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may 1617 Mail Service Center,Raleigh,North Carolina 27699-1617 One Location:512 N.Salisbury St.Raleigh,North Carolina 27604 NorthCarolina Phone:919.807-63001 FAX:919-807-6492\Customer Service:1-877-623-6748 Internet:www.ncwaterquality.org Naturally An Equal Opportunity 1 Affirmative Action Employer Mr. Rusty Bost, P.E., Assistant City Engineer May 7, 2010 Page 2 be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Mooresville Regional Office, telephone number(704) 663-1699, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: Construction Grants & Loans, DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Mr. Rusty Bost, P.E., Assistant City Engineer May 7, 2010 Page 3 Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Seth Robertson, P.E. at telephone number(919) 715-6206. Sincerely, e9a,•.:4—t.—#0 * ...d Av.....g.Q13-0k Coleen H. Sullins kp:sr cc: Steve Cavanaugh, P.E., Cavanaugh & Associates, P.A., Winston-Salem, NC Gaston County Health Department DWQ, Technical Assistance and Certification Unit DWQ, Point Source Branch, NPDES Program Ken Pohlig, P.E. ATC File No. 074268A04 City of Gastonia Crowders Creek WWTP—Additional Bar Screens A To C No. 074268A04 Issued May 7, 2010 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Crowders Creek WWTP, located on U.S. Hwy 321 in Gaston County for the City of Gastonia, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of two (2) mechanical bar screens (each rated for 12 MGD peak flow) at the Crowders Creek WWTP headworks structure, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration No. Date Send to: Construction Grants & Loans DENR/DWQ 1633 Mail Service Center Raleigh, NC 27699-1633 A •A 1r NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary February 3, 2010 2010 Mr. Rusty Bost, P.E., Assistant City Engineer City of Gastonia P.O. Box 1748 Gastonia, North Carolina 28053-1748 SUBJECT: Authorization to Construct A to C No. 074268A03 City of Gastonia Crowders Creek WWTP—Additional Bar Screen Gastonia County Dear Mr. Bost: A letter of request for an Authorization to Construct was received January 25, 2010, by the Division of Water Quality (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 6.0 MGD Wastewater Treatment Plant, with discharge of treated wastewater into Crowders Creek in the Catawba River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Installation of an additional mechanical bar screen (rated for 12 MGD peak flow) at the Crowders Creek WWTP headworks structure, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0074268 issued April 1, 2006, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0074268. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may 1617 Mail Service Center,Raleigh,North Carolina 27699-1617 One Location:512 N.Salisbury St.Raleigh,North Carolina 27604 NorthCarolina Phone:919-807-6300\FAX:919-807-6492\Customer Service:1-877-623-6748 Internet:www.ncwaterquality.org Naturally An Equal Opportunity 1 Affirmative Action Employer Mr. Rusty Bost, P.E., Assistant City Engineer February 3, 2010 Page 2 be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Mooresville Regional Office, telephone number(704) 663-1699, shall be notified at least forty-eight(48)hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: Construction Grants & Loans, DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Mr. Rusty Bost, P.E., Assistant City Engineer February 3, 2010 Page 3 Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Seth Robertson, P.E. at telephone number(919)715-6206. Sincerely, ,0 //44d k ' CoIeen H. Sullins kp:sr cc: Steve Cavanaugh, P.E., Cavanaugh & Associates, P.A., Winston-Salem, NC Gaston County Health Department DWQ Mooresville Regional Office, Surface Water Protection DWQ, Technical Assistance and Certification Unit DWQ, Point Source Branch, NPDES Program Ken Pohlig, P.E. ATC File No. 074268A03 City of Gastonia A To C No. 074268A03 Issued February 3, 2010 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Crowders Creek WWTP, located on U.S. Hwy 321 in Gaston County for the City of Gastonia, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of an additional mechanical bar screen (rated for 12 MGD peak flow) at the Crowders Creek WWTP headworks structure, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration No. Date Send to: Construction Grants & Loans DENR/DWQ 1633 Mail Service Center Raleigh, NC 27699-1633 0�0� WA7. 9QG Michael F.Easley,Governor ' William G.Ross Jr.,Secretary • North Carolina Department of Environment and Natural Resources 1 Coleen H.Sullins,Nut Division of Water Quail December 17, 2008 Mr. Larry Cummings City of Gastonia P.O. Box 1748 Gastonia, North Carolina 28053-1748 .41107 SUBJECT: City of Gastonia Crowders Creek WWTP Improvements Permit No. NC0074268 Transmittal of Approved Plans and Specifications Dear Mr. Cummings: Enclosed is a copy of the plans and specifications, which were approved on September 19, 2008. The subject documents have been stamped "approved" for your records. A copy is also being forwarded to your engineer and to the Mooresville Regional Office. The Permittee should retain these documents for the life of the facility. Should you have questions regarding this matter, call me at(919) 715-6206. Sincerely, (4-11MtA44 Seth Robertson, P.E., §iiVerVisor Design Management Unit swc: Sr Enclosures cc: Charles A. Willis, P.E.,Willis Engineers, 10700 ' es. 'lases S *At , Charlotte, NC 28277 ooresvilleAt Ov, Daniel Blaisdell, P.E. Seth Robertson, P.E. DEC 1 9 2008 Steve Coffey, P.E. ATC File No. 074268A02 C`v'v l�i:l�a� I�lt f� Construction Grants and Loans Section 1+■'"' 5111far - 1633 Mail Service Center Raleigh NC 27699-1633 One Phone:919-733-6900/FAX:919-715-6229/Internet:www.nccgl.net North Carolina An Equal Opportunity/Affirmative Action Employer—50%Recycled/10%Post Consumer Paper Naturally rf ,,OF 'ATFRP Michael F.Easley,Governor $ William G.Ross Jr.,Secretary North Carolina Department of Environment and Natural Resources 'i Coleen H.Sullins,Director 5 Division of Water Quality September 19, 2008 RECEIVEE Mr. Larry Cummings SEP 29 2008 City of Gastonia P.O. Box 1748 Gastonia, North Carolina 28053 NC DENR MRO DWQ-Surface Water Protecti SUBJECT: Authorization to Construct A to C No. 074268A02 City of Gastonia Crowders Creek WWTP Gaston County Dear Mr. Cummings: A letter of request for an Authorization to Construct was received June 24, 2008,by the Division, and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 6.0 MGD Wastewater Treatment Plant, with discharge of treated wastewater into Crowders Creek in the Catawba River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: replacement of one 50 HP return activated sludge pump motor; replacement of one 50 HP return activated sludge pump and motor; installation a of precast scum box including two (2) 5 HP chopper recirculation pumps, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0074268 issued April 1, 2006, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0074268. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality. Nose ht Carolina ,Va ura!!a North Carolina Division of Water Quality 1617 Mail Service Center Raleigh,NC 27699-1617 Phone(919)733-7015 Customer Service Internet:www.ncwaterqualitv.orq 512 N.Salisbury St. Raleigh,NC 27604 FAX (919)733-2496 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer—50%Recycled/10%Post Consumer Paper Mr. Larry Cummings A To C No. 074268A02 Issued September 19, 2008 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe(periodically/weekly/full time) the construction of the modifications and improvements to the Crowders Creek WWTP, located on U.S. Hwy 321 in Gaston County for the City of Gastonia, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: replacement of one 50 HP return activated sludge pump motor; replacement of one 50 HP return activated sludge pump and motor; installation a of precast scum box including two(2) 5 HP chopper recirculation pumps, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration No. Date Mail this Certification to: Construction Grants and Loans DENR/DWQ 1633 Mail Service Center Raleigh,NC 27699-1633 a BLACK & VEATCH 8520 Cliff Cameron Drive Black&Veatch International Company Suite 210 Charlotte,North Carolina 28269 Tel:(704)548-8461 Fax:(704)548-8640 City of Gastonia, NC B&V Project 138736 Crowders Creek Wastewater Treatment Plant June 12, 2008 Mr. Alan Klimek Construction Grants & Loans DENR/DWQ 1633 Mail Service Center Raleigh,North Carolina 27699-1633 Subject: Engineer's Certification Crowders Creek WWTP A to C No 074268A01 Issued June 24, 2005 Dear Mr. Klimek: Please fine enclosed the Engineer's Certification for the City of Gastonia, Crowders Creek WWTP, Digester Rehabilitation Project. Please forward this notification to any other required recipient not on the cc list below. Contact me at(704) 510-8424 if you have any questions. Very truly yours, BLACK& VEATCH INTERNATIONAL COMPANY Mary P. Knosby, P.E. Enclosure cc: "Plibeitesisilleiliegiestal4WW,INWeeeriiikeigirograrais Larry Cummings, City of Gastonia Stephanie Scheringer, City of Gastonia Jason Wallace, P.E., City of Gastonia City of Gastonia A To C No. 074268A0 I Issued June 24, 2005 Engineer's Certification 1, InaOf P. Koosby , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically!weekly/full time) the construction of the modifications and improvements to the Crowders Creek W WTP, located off US Highway 321 south of Gastonia in Gaston County for the City of Gastonia, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Rehabilitation of one exisiting digester with new fixed cover, installation of a sludge mixer, associated piping and appurtenances; and piping modifications to the second digester in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature MkL4.A$IL3._ Registration No. O3O gig 14 Date (o 113 1Dag �� N •A G�//,% •FEss; Send to: Construction Grants & Loans 2•• 0 'L'.9=_ DENR/DWQ - . AL �: 1633 Mail Service Center Raleigh, NC 27699-1633 % '. 'vG • <///r P. 110� \\\� (—IOZ—O�I00 Oc.W ATFRO Michael F.Easley,Governor William G.Ross Jr.,Secretary rNorth Carolina Department of Environment and Natural Resources -t'et H Alan W.Klimek,P.E.Director Division of Water Quality June 24, 2005 • Larry Cummings, Division Manager Wastewater Treatment JUN 2005 • City of Gastonia P. O. Box 1748 Gastonia,NC 28053-1748 i��+t� r '"C TIN AuthorizatioA�$Jk Is'l tel—s I I �E�+TIC} A to C No. 074268A01 City of Gastonia Crowders Creek WWTP Gaston County Project No. 074268A01 Dear Mr. Cummings: A letter of request for Authorization to Construct was received April 29, 2005, by the Division, and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 6.0 MGD Crowders Creek Wastewater Treatment Plant, with discharge of treated wastewater into the Crowders Creek in the Catawba River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Rehabilitation of one exisiting digester with new fixed cover, installation of a sludge mixer, associated piping and appurtenances; and piping modifications to the second digester, in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0074268 issued September 9, 2003, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0074268. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. One N Carolina ,Natura!!y North Carolina Division of Water Quality 1617 Mail Service Center Raleigh,NC 27699-1617 Phone(919)733-7015 Customer Service Internet: h2o.enr.state.nc.us 512 N.Salisbury St. Raleigh,NC 27604 FAX (919)733-2496 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer—50%Recycled/10%Post Consumer Paper Larry Cummings, Division Manager June 24, 2005 Page 2 The Mooresville Regional Office, telephone number(704) 663-1699, shall be notified at least forty-eight(48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to Cecil G. Madden, Jr., P.E., Construction Grants & Loans, DWQ / DENR, 1633 Mail Service Center, Raleigh, NC 27699- 1633. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T 15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. Larry Cummings, Division Manager June 24, 2005 Page 3 One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Cecil G. Madden,Jr., P.E. at telephone number(919) 715-6203. Sincerely, lan W. Klimek, E. , ICD:cgm cc: David M. Parker, P.E. (Black& Veatch International Company) Gaston County Health Department aommenimmommemow Technical Assistance and Certifi Unit acation Daniel Blaisdell, P.E. Point Source Branch, NPDES Program Cecil G. Madden, Jr., P.E. Review Engineer A to C File _('��' d Ufa--:br.a4�,4�..X. .a.. ,,i; `�' �• g>.' 'j. City of Gastonia A To C No. 074268A01 Issued June 24, 2005 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Crowders Creek WWTP, located off US Highway 321 south of Gastonia in Gaston County for the City of Gastonia, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Rehabilitation of one exisiting digester with new fixed cover, installation of a sludge mixer, associated piping and appurtenances; and piping modifications to the second digester in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration No. Date Send to: Construction Grants & Loans DENR/DWQ 1633 Mail Service Center Raleigh, NC 27699-1633 Michael F.Easley,Governor RQ William G.Ross Jr..Secretary y North Carolina Department of Environment and Natural Resources CO r • • > (DWG. _{ Alan W.Klimek,P.E.,Director Division of Water Quality 6LL& • June 17, 2002 Mr. Matthew W. Jordan Director of Public Works and Utilities City of Gastonia Post Office Box 1748 • Gastonia,North Carolina 28053-1748 Subject: Draft Special Order by Consent City of Gastonia • Crowders Creek WWTP NPDES Permit No. NC0074268 Gaston County,NC • Dear Mr. Jordan: • Enclosed is a draft of the Special Order by Consent (SOC) that has been prepared in response to your request for a SOC and Application Form dated May 28, 2002. Please review • the draft and submit your comments regarding the Order by July 5, 2002. In responding please address your comments to the attention of Mr. John Lesley of this Office at the address located at the bottom of this letter. • If you have any questions concerning the draft SOC,please do not hesitate to.contact Mr. Lesley or me. • Sincerely, • • D. Rex Gleason, P.E. Water Quality Regional Supervisor • Enclosure • Cc: Bob Sledge,DWQ Compliance Unit JL 1 NCDENR N.C.Division of Water Quality 919 North Main Street,Mooresville NC 28115 Phone(704)663-1699 FAX (704)663-6040 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION COUNTY OF GASTON IN THE MA 1'1'hR OF ) 2 T NORTH CAROLINA SPECIAL ORDER BY CONSENT NPDES PERMIT ) EMC WQ NO. NO.NC0074268 ) HELD BY THE ) CITY OF GASTONIA ) Pursuant to provisions of North Carolina General Statutes (G.S.) 143-215.2, this Special Order by Consent is entered into by the City of Gastonia,hereinafter referred to as the City, and the North Carolina Environmental Management Commission, an agency of the State of North Carolina created by G.S. 143B-282, and hereinafter referred to as the Commission: 1. The City and the Commission hereby stipulate the following: (a) That the City holds North Carolina NPDES Permit No.NC0074268 for operation of an existing wastewater treatment works and for making an outlet therefrom for treated wastewater to Crowders Creek, Class C waters of this State in the Catawba River Basin,but is unable to comply with the final effluent limitations for total nitrogen set forth in the Permit. Compliance will not require preparation of plans and specifications for and construction and operation of additional treatment works. (b) That noncompliance with final effluent limitations constitutes causing and contributing to pollution of the waters of this State named above,and the City is within the jurisdiction of the Commission as set forth in G.S. Chapter 143,Article 21. (c) Since this Special Order is by Consent,neither party will file a petition for a contested case or for judicial review concerning its terms. • 2. The City, desiring to comply with the permit identified in paragraph 1(a) above,hereby agrees to do the following: (a) Comply with all terms and conditions of the permit except those effluent limitations identified in paragraph 1(a)above. See Attachment A for all monitoring requirements and effluent limitations. The permittee may also be required to monitor for other parameters as deemed necessary by the Director in future permits or administrative letters. (b) Undertake the following activities in accordance with the indicated time schedule: 1) Develop and implement technically based Industrial User Permit limitations for the significant industrial users of concern for organic nitrogen by no later than September 1, 2002. MET 2) Progress reports shall be submitted by no later than September 15,2002, January 15, 2003,and March 15,2003 that detail actions the City has taken through the Pretreatment Program to ensure a reduction of organic nitrogen to the facility and any process changes within the WWTP to enhance treatment. 3) Achieve compliance with the NPDES Permit limitation by April 1, 2003. (c) During the time in which this Special Order by Consent is effective,comply with the interim effluent limitations contained in Attachment A. The following reflects only the limitations that have been modified from NPDES requirements by this Order: Permit Limits (April—October) Modified Limits(SOC) (April-October) Parameters Unit Monthly Avg. Monthly Average Total mg/1 6.0 mg/I 10.0 mg/I • Nitrogen (d) No later than 14 calendar days after any date identified for accomplishment of any activity • listed in 2(b) above,submit to the Director of DWO written notice of compliance or noncompliance therewith. In the case of noncompliance,the notice shall include a statement of the reason(s) for noncompliance,remedial action(s)taken,and a statement identifying the extent to which subsequent dates or times for accomplishment of listed activities may be affected. 3. The City agrees that unless excused under paragraph 4,the City will pay the Director of the DWQ,by check payable to the North Carolina Department of Environment and Natural Resources, stipulated penalties according to the following schedule for failure to meet the deadlines set out in paragraphs 2(b)and 2(d), or failure to attain compliance with the effluent limitations/monitoring requirements contained in Attachment A. Failure to meet a schedule date $100/day for the first 7days; $500/day thereafter Failure to maintain compliance with $1000/violation any modified limit contained in the SOC. Failure to achieve compliance with effluent limits at final compliance deadline. $7,000 • Monitoring frequency violations $100 per omitted value per parameter Monitoring frequency violation—toxicity $1,000 per omitted value Failure to submit progress reports $50/day for the first 7 days; $250/day thereafter 4. The City and the Commission agree that the stipulated penalties are not due if the City satisfies the DWQ that noncompliance was caused solely by: a. An act of God; b. An act of war; c.An intentional act or omission of a third party but this defense shall not be available if the act or omission is that of an employee or agent of the defendant or if the act or omission occurs in connection with a contractual relationship with the permittee; d. An extraordinary event beyond the permittee's control. Contractor delays or failure to obtain funding will not be considered as events beyond the permittee's control; or e. Any combination of the above causes. • Failure within 30 days of receipt of written DWQ and to pay the penalties, or challenge them by a contested case petition pursuant to G.S. 150B-23,will be grounds for a collection action , which the Attorney General is hereby authorized to initiate. The only issue in such an action will be whether the 30 days has elapsed. 5. This Special Order by Consent and any terms, conditions and interim effluent limitations contained herein, hereby supersede any and all previous Special Orders and Enforcement Compliance Schedule Letters, and terms, conditions, and limitations contained therein issued in connection with NPDES Permit No. NC0074268. 6. Noncompliance with the terms of this Special Order by Consent is subject to enforcement action in addition to the above-stipulated penalties, including injunctive relief pursuant to G.S. 143-215.6. 7. The permittee,upon signature of the Special Order by Consent,will be expected to comply with all schedule dates,terms, and conditions of this document. 8. This Special Order by Consent shall expire July 1,2003. For the City of Gastonia: � Zi Date (Title) For the North Carolina Environmental Management Commission Date Chair of the Commission ATTACHMENT A Effluent LIMITS MONITORING REQUIREMENTS Characteristics Monthly Weekly Daily Measurement Sample Type Sample Average Average Maximum Frequency Flow 6.0 MGD .. Location Continuous Recording I or E BOD,5-day,20°C2 13.0 mg/1 19.5 mg/1 Dail TSS2 30.0 mg/1 45 mg/1 Dailyy Composite E, I NH3-N 2.0 mg/I Composite E, I • (April 1 —October 31) Daily Composite E NH3-N 10.0 mg/1 • (November 1-March 1) Daily Composite E • Dissolved Oxygen 3 Daily Grab Fecal Coliform 200/100m1 400/100 ml E,U.D (geometric mean) Daily Grab E Temperature • Total Residual Chlorine Daily Grab E, U,D 28.0 ug/I Daily Grab E Conductivity 3/week Grab E,U,D Total Nitrogen(SOC)4 10.0 m po (NO2+NO3+TKN) Weekly Composite E (April 1 —October 31) Total Nitrogen Weekl (NO2+NO3+TKN) Y Composite E November I-March 31) Total Phosphorus 1.0 mg/1 Weekly Composite E • Chronic Toxicity' Quarterly Composite E Cyanide° 12.2 ug/I 53.5 ug/I Weekly Grab Selenium 12.2 ug/I 48.7 ug/I Weekl E • Cadmium Y Composite E • 2/month Composite E Chromium 2/month - Lead Composite E • 2/month Composite E Mercury Toluene 2/month Composite E pHue7 2/month Composite • • E Daily Grab E rotes: • . Sample locations:E—effluent,I—Influent,U—Upstream at NCSR 1108,D—Downstream at a)NCSR 2424 and b)NCSR 564. Instream monitoring shall be grab samples taken 3/week(June—September)and 1/week(October—May). The monthly average effluent BODS and Total Suspended Solids concentrations shall not exceed 15%of the respective influent value (85%removal). • The daily average dissolved oxygen effluent concentration shall not be less than 6.0 mg/l. The Total Nitrogen limit is a SOC interim effluent limit. Chronic Toxicity(Ceriodaphnia dubia),P/F,41%;March,June,September,and December. See Supplement to Effluent Limitations and Monitoring Requirements Page—Special Conditions for flow of 6.0 MGD. • The detection limit for cyanide is 10.0 ugh'. If the measured levels of cyanide are below the detection limit,then the measurement is considered to be zero for compliance evaluation and should be reported on the DMR as< 10 ug/l. The pH shall not be less than 6.0 standard units nor greater than 9.0 standard units. :ere shall be no discharge of floating solids or visible foam in other than trace amounts.