Loading...
HomeMy WebLinkAbout20100645 Ver 1_Approval Letter_20100812Al_ NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary August 12, 2010 Kapstone Kraft Paper Corporation Attn: Ms. MaryLee Ransmeier 100 Gaston Road Roanoke Rapids, NC 27870 Subject Property: Kapstone Natural Gas Line Roanoke River [030208, 23-(26), C] Approval of 401 Water Quality Certification with Additional Conditions Dear Ms. Ransmeier, Halifax County DWQ EXP#: 10-0645 You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise temporarily impact 40 linear feet of perennial stream and 12 linear feet of intermittent stream for the purpose of constructing the proposed natural gas line, as described within your Pre- construction Notification Application dated August 11, 2010 and received by DWQ on August 12, 2010. The impacts are covered by: General Water Quality Certification Number 3819 (GC3819) which allows you to use Nationwide Permit NW 12, when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 Permit. This approval is for the purpose and design that you described in your PCN application (dated August 11, 2010). If you change your project, you must notify us and you maybe required to send us anew application. If the property (or a lot on the property) is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h). This approval requires you to follow the conditions listed in the attached Water Quality Certifications (GC3819) and any additional conditions listed below. The Additional Conditions of the Certification are: Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification are met. No other impacts are approved including incidental impacts: Impact Type Amount Approved (Units) Plan Location or Reference Stream (perennial) 40 linear feet - temporary August 11, 2010 PCN page 6 of 13 Stream (intermittent) 12 linear feet - temporary August 11, 2010 PCN page 6 of 13 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX: 919-733-6893 Internet: http:llh2o.enr.state.nc.us/ncwetlands/ NonrthCarolina ?atura!!t? An Equal Opportunity l Affirmative Action Employer Kapstone Kraft Paper Corporation Page 2 of 3 August 12, 2010 Sediment and Erosion Control: 2. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 3. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the 404/401 Permit Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval from the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream and downstream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project. 5. Protective Fencing - The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15 NCAC 2H, Section .0500. 6. Notification of Construction The applicant and/or authorized agent shall contact the DWQ Express Review Program in writing at the letterhead address within ten (10) days of the commencement of construction. 7. Certificate of Completion Within thirty (30) days of the completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Please send photographs upstream and downstream of each crossing site to document correct installation along with the Certificate of Completion form. The applicant/permittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal Law. If the Division Kapstone Kraft Paper Corporation Page 3 of 3 August 12, 2010 determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, then the Division may reevaluate and modify this General Water Quality Certification. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you wish to contest any statement in the attached 401 Water Quality Certification you must file a petition for an administrative hearing. You may obtain the petition form from the Office of Administrative Hearings (OAH). You must file the petition with the office of Administrative Hearings within thirty (30) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The OAH accepts filings Monday through Friday between the hours of 8:00am and 5:00pm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919)-733-2698, Facsimile: (919)-733-3478 A copy of the petition must also be served on DENR as follows: Ms. Mary Penny Thompson, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Lia Myott Gilleski or Joseph Gyamfi at 919-733-1786. CHS/3m/lmg Enclosures: Certificate of Completion GC 3819 Si rely, Coleen H. Sullins cc: James Lastinger, USACE Raleigh Regulatory Field Office Lauren Witherspoon, DWQ Raleigh Regional Office File Copy DLQ Raleigh Regional Office File: 10-0645KapstoneNaturalGasLine(Halifax)401(NW 12).doc