Loading...
HomeMy WebLinkAboutNCC192288_Email RE NOT Request Not Approved with Inspection Rpt_20201203Georgoulias, Bethany From: laserfiche@ncdenr.gov Sent: Thursday, December 3, 2020 9:00 AM To: swilkerson@wildlandseng.com Cc: Georgoulias, Bethany; McCoy, Suzanne; swilkerson@wildlandseng.com; eneuhaus@wildlandseng.com Subject: NOT Request Not Approved This email is to notify you that your request to rescind COC No. NCC192288 for the project Plantation Branch Mitigation Site was not approved for the following reason: Document uploaded does not appear to be the final close-out inspection. It noted "a section of the northwestern portion of Plantation Branch, beyond the culvert crossing was not observed to have permanent ground cover sufficient to restrain erosion. Continue efforts to establish permanent ground cover across all areas of the site." Please submit a new NOT request when close-out confirmation is available from the DEQ Winston-Salem Regional Office. If you have any questions, please contact The NC DEMLR Stormwater Program at (919) 707-3640. This email was automatically generated by Laserfzche. Please do not respond to this email address, as responses are not monitored. North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Surry Project: Plantation Branch Mitigation River basin: Yadkin-PeeDee Person financially responsible: Wildlands Holdings IV LLC - Eric Neuhaus Project #: SURRY-2020-002 Address: 1430 S Mint St., Suite 103, Charlotte, NC 28203 1. Project Location: Plantation Rd., Dobson Pictures: Yes - Digital 2. Weather and soil conditions: Cloudy w/t Rain, Wet Soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: Initial inspection: Yes If no, check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: June 30, 2020 10. Comments: On June 17, 2020 this site was inspected for compliance. At the time of the inspection, all site work appeared to be completed with permanent ground cover established across most areas of the site. However, a section of the northwestern portion of Plantation Branch, beyond the culvert crossing was not observed to have permanent ground cover sufficient to restrain erosion. Continue efforts to establish permanent ground cover across all areas of the site. Reported by: Tyler Pearson Others present: Date of inspection: June 17, 2020 Time arriving on site: 2:00 PM Time leaving site: 2:45 PM cc: