Loading...
HomeMy WebLinkAbout20010087 Ver 1_Certification of Completion_20030924 (2)DWQ Project No.: QI-0O57 County: aldwel l Applicant: Caldwell Commmiity College and "Technical Institute Project Name: Career Center Expansion Facility Date of Issuance of 401 Water Quality Certification: June 1:3, 2002 Certificate of Completion Upon completion of all work. approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 40l/Wet1ands Unit, North C.:aolina Division of )Mawr Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621 -This form may be returned to DWQ by the applicant, the appliemit's authorized agent. or dic project enginc;er. It is not necessary to send certificates from all of these. Appl'icant's Certification hereby state that, to the best of my aWlitiec, due care and diligence was used in the observation of the construction such that the constru ction was Observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and slx:cifications, and other supporting materials. Signature: _ Date: Agent's Certification ,. 1, - ` , '???ereby state that, to the best of my abilities, due care and diligence was used in the observe ion of the construction such that Elie construction was observed to be built within subgantial compliance and ' en f the 401: W4ter try Certification and Buffer Rules, the approved plans and specifications, and other SUUDO irti C rials. J Signature: /- Date: - Z_ q- -© If this project was designed by a Certified Professional 1, _, as a duly registered Professional (i.e., Engineer. Landscape Architect, Surveyor, etc) in the State of North Carolina, having been authorized to observe (periodically. weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities. due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. Date TiT:rl CSCR???R??R:ni S'rAq C"'J9Ta CnKo_4-ii7M_mmn!i.invj on-an seat,')?-aT-WIr