HomeMy WebLinkAbout20201296 Ver 1_20201030_DWR Pre-Filing Meeting Request Form_20201202DWR Pre-Fil ing Meeting Req u est Form
ID#*Ve rsion *
Re gional Office *
Re v ie we r List *
Contact Name *
Contact Email Addre ss *
Proje ct Name *
Proje ct Owne r *
Proje ct County *
Owne r Addre ss:
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low.*
20201296 1
Mooresville Regional Office - (704) 663-1699
Donna Hood
Pre-Filing Me eting Reque st submitte d 9/29/2020
Chris Tinklenberg
Chris.Tinklenberg@kimley-horn.com
Cross Charlotte Trail - Davidson to Matheson
City of Charlotte
Mecklenburg
City
Charlotte
State / Province / Region
NC
Postal / Zip Code
28202
Country
USA
Street Address
600 East 4th Street
Address Line 2
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
Bryan Roden-Reynolds (USACE), Alan Johnson (DWR)
The project is located along an abandoned railroad right-of-way between E
24th Street and Jordan Pl in Charlotte, Mecklenburg County, NC. The
proposed project includes the construction of a 12' wide and 16' wide
greenway. The project also includes the replacement of an abandoned
railway timber bridge structure with a 12' x 6' reinforced concrete box
culvert.
Please give a couple of dates you are available for a meeting.
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature
Submittal Date
10/7/2020
10/8/2020
10/9/2020
D2M Cover Sheet.pdf 610.52KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
9/29/2020