Loading...
HomeMy WebLinkAbout20201296 Ver 1_20201030_DWR Pre-Filing Meeting Request Form_20201202DWR Pre-Fil ing Meeting Req u est Form ID#*Ve rsion * Re gional Office * Re v ie we r List * Contact Name * Contact Email Addre ss * Proje ct Name * Proje ct Owne r * Proje ct County * Owne r Addre ss: Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low.* 20201296 1 Mooresville Regional Office - (704) 663-1699 Donna Hood Pre-Filing Me eting Reque st submitte d 9/29/2020 Chris Tinklenberg Chris.Tinklenberg@kimley-horn.com Cross Charlotte Trail - Davidson to Matheson City of Charlotte Mecklenburg City Charlotte State / Province / Region NC Postal / Zip Code 28202 Country USA Street Address 600 East 4th Street Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No Bryan Roden-Reynolds (USACE), Alan Johnson (DWR) The project is located along an abandoned railroad right-of-way between E 24th Street and Jordan Pl in Charlotte, Mecklenburg County, NC. The proposed project includes the construction of a 12' wide and 16' wide greenway. The project also includes the replacement of an abandoned railway timber bridge structure with a 12' x 6' reinforced concrete box culvert. Please give a couple of dates you are available for a meeting. Ple ase attach the docume ntation you would like to hav e the me e ting about. Signature Submittal Date 10/7/2020 10/8/2020 10/9/2020 D2M Cover Sheet.pdf 610.52KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 9/29/2020