Loading...
HomeMy WebLinkAbout20191006 Ver 2_Modification Request Attachment_20201202 .=nEsinrFoF`•• ,�y' '°gym^'o•` PT2+ iF p+Q} 1 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J.ERIC BOYETTE GOVERNOR SECRETARY November 24, 2020 U.S. Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest,NC 27587-4346 ATTN: Mr. Monte Matthews NCDOT Coordinator Subject: Request for Modification to Section 404 Individual Permit and Section 401 Water Quality Certification for the I-40/I-77 interchange improvements including I-40 from west of SR 2003 (Radio Road) to SR 2158 (Old Mocksville Road) and I-77 from south of SR 2321 (East Broad Street) to south of SR 2171 (Jane Sowers Road) in Iredell County. Division 12, TIP No. I-3819B. Debit $570.00 from WBS 34192.3.2. References: 1) Section 404 Individual Permit, Action ID No. SAW-2018-01504, issued January 21, 2020; 2) Section 401 Water Quality Certification No. WQC004203, NCDWR Project No. 20191006, issued November 19, 2019 and revised January 30,2020. Dear Sir: The purpose of this letter is to request a modification to the United States Army Corps of Engineers (USACE) Section 404 Individual Permit and associated North Carolina Division of Water Resources (NCDWR) Section 401 Water Quality Certification for the above referenced project. This request letter includes a variance request for specific cross-pipes that will not be embedded, revisions to the drainage design, and modifications to permitted impacts. A variance is requested for cross-pipes which will not be set below the elevation of the streambed. This relates directly to General Condition 1/Project Specific Condition 8 of the 401 Water Quality Certification. A list of the applicable locations, and justification for the variance request at each location is provided on the following page(Table 1). Mailing Address: Telephone:(919)707-6000 Location: NC DEPARTMENT OF TRANSPORTATION Fax:(919)250-4224 1000 BIRCH DRIVE ENVIRONMENTAL ANALYSIS UNIT Customer Service: 1-877-368-4968 RALEIGH,NC 27610 1598 MAIL SERVICE CENTER RALEIGH,NC 27699-1598 Website:ncdot.gov Table 1.Description of cross-pipe locations for the variance request. Location Permit Size Type Reason for Variance Request Site 54" Reinforced Supplement The existing cross pipe is not embedded below the and Extend stream elevation. Due to this existing configuration, Y S Concrete 37 39 16, 17 pipe and 42" existing the pipe will be lined,but not embedded. The existing Welded (US and pipe will be supplemented with a 42"welded steel pipe Steel Pipe DS) via bore and jack set 1 foot higher than existing pipe. The existing cross pipe will be extended and the 54" replacement pipe will connect to a closed drainage si Y_S 18 19 Reinforced Extsodn network. As such, there will be no jurisdictional 46+51 Concrete DS features upstream of this pipe, and it cannot be set Pipe ) below the streambed due to the configuration as a closed network. 3 @ The existing culvert is not embedded below the stream Y S 9'X 11' Extension bed elevation. Due to this existing configuration, and —71+00 21, 22 Reinforced (US and the need to satisfy FEMA floodplain requirements, it is Concrete DS) not feasible to embed the proposed extension. Box Culvert 66" The existing cross pipe is not embedded below the Y_S Reinforced Extension stream elevation. Due to this existing configuration, 94+06 24, 25 Concrete (US and and the installation of junction boxes to tie in adjacent Pipe DS) drainage networks, it is not feasible to embed the proposed extension. 60" The existing cross pipe is not embedded below the Y_N Reinforced Extension stream elevation. Due to this existing configuration, 211+51 27 Concrete (DS only) and the proposed extension on only the downstream Pipe end, it is not feasible to embed the proposed extension. Revisions resulting in changes to permitted impacts have been made to nine impact sites (Sites 2, 5, 16, 17, 19, 21, 22, 23, and 25) and are discussed in detail below. Three new impact sites are also discussed below(Sites 9A,28, and U-4). In addition, permitted impact Sites 9 (Permit Drawing Sheet 10 through 13) and 27 (Permit Drawing Sheets 62 through 65) are included in the revised permit drawings to highlight the changes to the drainage design from previously approved permit drawings. At Utility Site U-2, the replacement transmission tower in this location, which was originally proposed to be a metal lattice structure with four 4'x4'concrete footings, was altered to instead be a single steel 56"diameter pole (Utility Permit Drawing Sheets 4 through 7). The design changes at Sites 9, 27, and Utility Site U-2 will not result in any additional changes to the amount, type, or location of previously permitted impacts and are not discussed further. Previously permitted stream impacts included 3,194 linear feet of permanent stream impacts (which includes 1,019 linear feet of stream bank stabilization) and 394 linear feet (0.07 acre) of temporary stream impacts. Previously permitted wetland impacts for roadway construction included 1.39 acres of permanent wetland impacts (1.06 acres of permanent fill and 0.33 acre of mechanized clearing) and 2.56 acres of hand clearing in wetlands. Previously permitted impacts associated with utilities included 0.02 acre of mechanized clearing and 0.27 acre of temporary wetland fill impacts (permanent fill in wetlands and hand clearing impacts were <0.01 acre). The total permanent wetland impacts previously permitted for roadway construction and utilities was 1.41 acres. Page 2 of 9 The revised stream impacts for the project total 3,213 linear feet of permanent stream impacts (which includes 1,047 linear feet of stream bank stabilization impacts) and 471 linear feet (0.10 acre) of temporary stream impacts. The revised wetland impacts for roadway construction include 1.39 acres of permanent wetland impacts (1.06 acres of permanent fill and 0.33 acre of mechanized clearing), and 2.66 acre of temporary fill in wetlands impacts. The revised utilities impacts included 0.16 acre of mechanized clearing and 0.27 acre of temporary wetland fill impacts (permanent fill in wetlands and hand clearing impacts were<0.01 acre). The revised total permanent wetland impacts proposed for roadway construction and utilities is 1.55 acres. This modification will result in 0.14 acre of additional mechanized clearing impacts, 2.66 acres of additional temporary wetland fill impacts, 28 linear feet of additional stream bank stabilization impacts, and 77 linear feet (0.02 acre) of additional temporary stream impacts. There will be 2.56 acres less hand clearing impacts and 9 linear feet less permanent channel impacts than previously permitted. A summary of the changes is shown in Table 2 below. Table 2—Summary of changes to impacts* Impact Type Original Proposed Permit Difference Permitted Impacts I Modification Roadway Impacts Permanent Stream Impacts' 3,194 3,213 +19 Bank Stabilization Impacts 1,019 1,047 +28 Temporary Stream Impacts 394 471 +77 Permanent Wetland Fill 1.06 1.06 0 Mechanized Clearing in Wetlands 0.33 0.33 0 Hand Clearing in Wetlands 2.56 0 -2.56 Temporary Wetland Fill 0 2.66 +2.66 Utility Impacts Permanent Wetland Fill <0.01 <0.01 0 Mechanized Clearing in Wetlands 0.02 0.16 _ +0.14 _ Hand Clearing in Wetlands <0.01 <0.01 0 Temporary Wetland Fill 0.27 0.27 0 _ *Stream impacts are in linear feet. Wetland impacts are in acres. 'Totals include bank stabilization impacts. Permanent stream impacts requiring mitigation decreased by 9 linear feet. Please see the enclosed DWR Pre-Filing Meeting Request Form, revised DMS acceptance letter, revised permit drawings, and revised roadway plans where drainage revisions and/or field changes resulted in changes to permitted impacts. Note the three additional impact sites: Sites 9A and 28 are included in the revised roadway permit drawings and Utility Site U-4 is shown in the revised utility permit drawing. Permit impact sites where no changes were made to the drainage design or impacts are not included in the revised permit drawings. All changes to previously permitted impacts and the three additional impact sites are summarized below. Summary of Impacts to Waters of the U.S. Tables 3 through 5 summarize the permitted and revised impacts to jurisdictional water resources for the project. Changes to permitted impacts are shown with a strikethrough and revisions are shown in red text. A narrative describing the revisions made to each permit impact site are presented in the following section. Page 3 of 9 Table 3-I-3819B Wetland Impacts* Wetland Permanent Temporary Mechanized Hand Impacts Permit Wetland Fill in Fill in Clearing Clearing Requiring Site Number Sace Wetlands Wetlands' ac ac Mitigation L ac ac ac 2 WC 2.94 0.32 0.09 -- 0.41 2 WC/WD 2.94/9.57 0.02 0.62 0.02 0 62 0.05 3 WF 0.31 <0.01 0.01 -- 0.02 4 WD 9.57 -- 0.02 -- 0.02 5 WD 9.57 0.03 2.04 0.05 1.91 0.09 8 WH 0.08 <0.01 <0.01 -- 0.01 9 WK 1.20 0.40 0.08 -- 0.47 11 WAN 0.21 0.19 0.02 -- 0.21 26 WI 0.13 0.09 0.04 -- 0.13 Total Wetland Impacts 1.061 2.66 0.331 2,56 1.392 *All wetlands impacted are riparian 'Temporary fill impacts will result from the use of mats and crane barges 2Values are based on rounding, due to calculating totals with actual numbers to the thousandths Table 4-I-3819B Stream Impacts Permanent Temporary USAGE NCDWR Channel Bank Channel Permit Stream Name/ Status/ Required Required Impacts Stabilization Impacts Site NRTR ID Class lf lf ac Mitigation Mitigation (ac) (ac) (10 lf lf 2 UT to Fourth Creek Perennial -- 42 <0.01 -- -- SJ C (<0.01) (20) 3 --UT to Fourth Creek Perennial 206 <0.01 206 -- SI C (0.02) (10) <0.01 5 UT to Fourth Creek Perennial -- -- (40) -- SJ C 0.02 (77) 6 Fourth Creek Perennial -- 12 <0.01 C (<0.01) (20) 7 Fourth Creek Perennial -- 12 <0.01 C (<0.01) (20) 9 UT to Fourth Creek Perennial 747 <0.01-- 747 747 SL C (0.07) (10) 9A UT to Fourth Creek Perennial -- 0.01 SK C (50) 10 UT to Fourth Creek Perennial 25 <0.01 SK C (<0.01) (20) l 2 UT to Fourth Creek Perennial 10 0.01 10 SK C (<0.01) (54) l 3 UT to Fourth Creek Perennial 17 44 <0.01 17 17 SL C (<0.01) (<0.01) (10) Page 4 of 9 Table 4—I-3819B Stream Impacts (continued) Permanent Temporary USAGE NCDWR Channel Bank Channel Permit Stream Name/ Status/ Required Required Impacts Stabilization Impacts Site NRTR ID Class lf if ac Mitigation Mitigation (ac) . (ac) (10 if lf UT to Fourth Creek Intermittent 17 -- <0.01 14 SX C (<0.01) (10) 17 __ 15 UT to Fourth Creek Intermittent -- 11 <0.01 -- -- SX C (<0.01) (20) 112 16 UT to Fourth Creek Intermittent (0.04) -- <0.01 112 -- SX C 113 (10) 113 (0.01) 115 17 UT to Fourth Creek Perennial 114 -- <0.01 115 -- SX C (0.02) (14) 114 18 UT to Fourth Creek Perennial 72 <0.01-- 72 -- SW C (0.01) (10) 19 UT to Fourth Creek Perennial 34 __ -- 34 -- SW C (<0.01) 20 UT to Fourth Creek Perennial 61 <0.01-- 61 -- SBA C (0.01) (10) UT to Fourth Creek Perennial 176 <0.01 21 176 176 ST C } -- (21) (0.10) /167 8-74 22 UT to Fourth Creek Perennial (0 4) (0 ) <0.01 /167 /167 ST C 455 901 (4-0) 455 455 (0.18) (0.34) 23 UT to Fourth Creek Perennial -- -- <0.01 -- -- ST C (33) 24 UT to Fourth Creek Perennial 49 0.01-- 49 -- SU C (<0.01) (10) 44 <0.01 25 UT to Fourth Creek Perennial (<0.01) -- (32) 44 -- SU C 31 <0.01 31 (<0.01) (21) 27 UT to Fourth Creek Perennial 48 <0.01-- 48 -- SR C (0.01) (10) 28 UT to --B Creek Beaver Perennial 16 <0.01 16 -- SO C (<0.01) (11) Total Stream Impacts ' 2175 1019 0 2166 1047 (394) 2175 140-7 3194 0.10* 2166 1395 3213 (471) * Values are based on rounding Page 5 of 9 Table 5—I-3819B Utility Wetland Impacts Permit Wetland Impact Temporary Permanent Mechanized Hand Mitigation Site ID Type Impacts Fill Clearing Clearing Requirement ac ac ac ac ac U-1 WJ Utility 0.02 -- -- -- -- U-2 WD Utility 0.25 <0.01 0.02 -- 0.02 U-3 WH Utility -- -- -- <0.01 -- U-4 WU Utility -- I -- 0.14 -- 0.14 TOTAL IMPACTS 0.27 llir<0.010.16O:A� 0702 0.16 Permit Impact Site Modifications(shown in revised permit drawings): Site 2 (Permit Drawing Sheet 2) —Although hand clearing occurred within the approved permitted boundaries in wetland WC, the 0.62 acre of hand clearing impacts in wetlands have been revised to temporary fill in wetlands to account for impacts associated with the use of timber mats and crane barges during construction. Site 5 (Permit Drawing Sheet 46) —This site has been updated to incorporate unauthorized impacts to wetland WD and stream SJ that occurred inadvertently during construction. The 40 linear feet of permitted temporary stream impacts to stream SJ on the east side of the bridge alignment have been eliminated because the temporary pipe was not needed. However, there were 77 linear feet of unauthorized temporary stream impacts to stream SJ. Therefore, temporary stream impacts increased from 40 linear feet to 77 linear feet, which is 37 linear feet of additional temporary stream impacts. There are no permanent stream impacts proposed for this site. Permitted hand clearing impacts have been converted to temporary wetland fill impacts in areas where mats and barges are being used during construction. In addition, 0.10 acre of temporary wetland fill outside of previously permitted hand clearing impacts were added to account for the unauthorized temporary impacts within wetland WD. Impacts for hand clearing in wetlands decreased from 1.94 acres to 0 acre, and 2.04 acres of temporary wetland fill impacts are now included. There will be no additional permanent impacts at this location. On-site restoration was performed to mitigate for the unauthorized impacts that included 0.23 acre of temporary impacts to wetland WD (0.10 acre were outside of previously permitted hand clearing impacts) and 77 linear feet of temporary impacts to stream SJ. To restore the areas, the stream banks and a section of wetland WD were regraded and stabilized with erosion control matting. Native grass seeding and mulching were used for all temporarily impacted wetland areas and stream banks. On June 3, 2020, Lane Construction met on-site with Donna Hood with NCDWR and Matthew Evans with NCDOT to inspect the restoration areas and review the progress of restoration activities. A response to the Notice of Deficiency and the wetland restoration plan for the unauthorized impacts were submitted on June 25, 2020 to NCDWR and was accepted by NCDWR and USACE on June 30, 2020 as indicated through coordination with Donna Hood. Site 16(Permit Drawing Sheet 26)—Similar to the previous design,the impacts to stream SX at this site are due to the extension and supplement of an existing 54" reinforced concrete pipe (RCP) cross pipe. However, the pipe is now proposed to be lined. Otherwise there are no significant variations to the proposed design. Due to minor adjustments to the slope stake and headwall Page 6 of 9 configuration the impacts resulting from the pipe extension have increased from 13 linear feet to 15 linear feet, which is 2 feet of additional impacts. The permanent impacts due to bed stabilization have decreased from 99 linear feet to 98 linear feet. Overall, there is 1 foot of additional permanent stream impacts being proposed at this site compared to the previously permitted impacts. The design change will not result in any additional temporary stream impacts at this location. Site 17 (Permit Drawing Sheet 26)—Similar to Site 16, the impacts at this site are due to extension and supplement of an existing 54"RCP cross pipe. However, the pipe is now proposed to be lined. Otherwise there are no significant variations to the proposed design. Due to minor adjustments to the slope stake and headwall configuration, the impacts resulting from the pipe extension have increased by 3 linear feet from 17 linear feet to 20 linear feet. The permanent impacts due to bed stabilization have decreased from 98 linear feet to 94 linear feet. Overall, there is 1 foot less of permanent stream impacts being proposed at this site compared to the previously permitted impacts. The design change will not result in any additional temporary stream impacts at this location. Site 19 (Permit Drawing Sheet 26)—The design proposes to extend the existing 54"RCP and cover the existing stream channel with the roadway fill slope. The originally permitted permanent stream impacts were misclassified as 54" RCP extension and have been updated as roadway fill. The reclassification of impact type will not result in any additional permanent stream impacts at this location. Site 21 (Permit Drawing Sheet 30)—There will be no changes to the design or proposed activities at this site from the approved permit; however, the jurisdictional stream boundaries of stream ST have been revised to more accurately follow the surveyed topographic contours. This revision will not result in any changes to the linear feet of permanent and temporary stream impacts. The total acreage of permanent stream impacts increased from 0.08 acre to 0.10 acre as a result of the revised jurisdictional stream boundary; temporary stream impacts will remain<0.01 acre. Site 22 (Permit Drawing Sheet 30) — The jurisdictional stream boundaries of stream ST have been revised from those shown in the approved permit to more accurately follow the surveyed topographic contours. This revision will not result in any changes to the linear feet of permanent stream impacts for Site 22. Other revisions to impacts at Site 22 are as follows: in the approved permit, the permanent stream bed stabilization impacts were incorrectly calculated to extend 12 linear feet outside of the riprap in stream ST for the pipe outlet channel stabilization located at Station Number 83+85+00-Y. Also, in this location the permanent stream bank stabilization impacts should have been extended to the end of the riprap shown on the stream bank immediately adjacent to the channel, therefore the permit drawings have been revised to show an additional 16 linear feet of permanent stream bank stabilization impacts. Permanent stream bed impacts will decrease from 467 linear feet to 455 linear feet and bank stabilization impacts will increase from 873 linear feet to 901 linear feet. The previously approved 10 linear feet of temporary stream impacts were no longer needed and have been removed. Site 23 (Permit Drawing Sheet 30)—There will be no changes to the design or proposed activities at this site from the approved permit; however, the jurisdictional stream boundaries of stream ST have been revised to more accurately follow the surveyed topographic contours. This revision will not result in any changes to the linear feet or acreage of temporary stream impacts at this location. Site 25 (Permit Drawing Sheet 37)—In the approved permit, the drainage design included retaining an existing 15"RCP and connecting it to an existing 66" RCP, which carries stream SU, through a series of two junction boxes. The revised design includes replacing the 15"RCP and extending the pipe to discharge directly to stream SU instead of connecting to the existing 66"RCP. This revision will not result in any additional impacts. Page 7 of 9 Also, the detention basin shown in the original design impacting stream SU has been removed. The depth to the water table and proximity to the adjacent floodplain made the construction and operation of the detention basin infeasible. Permanent stream impacts decreased from 44 linear feet to 31 linear feet, which is a 13 linear foot decrease in impacts. Temporary stream impacts will decrease from 32 linear feet to 21 linear feet, which is an 11 linear foot decrease in impacts. New Permit Impact Sites (shown in revised permit drawings): Site 9A (Permit Drawing Sheet 11 and 14) —At this site, a temporary work bridge that spans from top of bank to top of bank was installed for construction access to Site 9. In the approved permit,no impacts were included for the temporary work bridge, however, impacts have been revised to include 50 linear feet(0.01 acre) of temporary stream impacts to account for any temporary impacts to stream SK that may occur as a result of the temporary work bridge. There will be no permanent stream impacts at this location. Site 28 (Permit Drawing Sheet 21a) — This site was added after it was determined the end of the existing 42"RCP outfall was structurally deficient and in need of replacement. The replacement of this section of pipe and installation of riprap outlet protection requires impacts to stream SO. At the outlet of the replacement pipe, Class I riprap will be installed in the stream bed and along the banks of stream SO for stabilization. The existing outlet in this location is perched which is being addressed through the use of a manhole drop structure in order to lower the proposed outlet to the streambed elevation. This will result in 16 linear feet of permanent stream impacts and 11 linear feet of temporary stream impacts that were not previously permitted. Utility Site U-4 (Utility Permit Drawing Sheet 3a) —During the construction of an access road for City of Statesville Power's 334 circuit relocation work, the contractor inadvertently allowed clearing in wetland WU. This activity resulted in 0.14 acre of mechanized clearing impacts to wetland WU. The cleared wetland has been replanted with wetland seed mix following NCDOT's Roadside Environmental Unit guidance and standard procedures. The revised utility permit drawings and summary table have been updated to include the 0.14 acre of mechanized clearing impacts that were not previously permitted. Revised Compensatory Mitigation The North Carolina Division of Mitigation Services (NCDMS) previously provided compensatory mitigation for 2,175 linear feet of permanent stream impacts and 1.41 acres of permanent riparian wetland impacts, as referenced in the issued Section 404 Individual Permit from the USACE on January 21, 2020 and the Section 401 WQC modification from NCDWR on January 30, 2020. Of the revised permanent stream impacts totaling 3,213 linear feet for this modification, 1,047 linear feet are the result of bank stabilization and are not considered loss of waters and therefore do not require mitigation from USACE or NCDWR. After the revisions to the drainage design, permanent stream impacts that require mitigation from USACE for this project now total 2,166 linear feet, which is 9 linear feet less than previously needed. The revised permanent wetland impacts for this project total 1.55 acres and therefore this modification will require additional mitigation for 0.14 acres of permanent riparian wetland impacts. A revised DMS acceptance letter reflecting these changes was issued and received on November 23, 2020 (attached). NCDOT requests to modify the permit for this project. Application is hereby made for modification of the USACE 404 permit and the 401 WQC from NCDWR as required for the above-described activities. We have provided a method of debiting $570.00 to be submitted to the NCDWR for processing the WQC renewal for I-3819B, as noted in the subject line of this application. Page 8 of 9 A copy of this permit application and its distribution list will be posted in the NCDOT website at http://connect.ncdot.gov/resources/Environmental. Thank you for your assistance with this project. If you have any questions or need additional information, please contact Erin Cheely at either ekcheely@ncdot.gov or(919) 707-6108. Sincerely, Philip S. Harris III, P.E., C.P.M. Environmental Analysis Unit Head cc: NCDOT Permit Application Standard Distribution List Page 9 of 9 tie R•.'. DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnYlmnal2nlrtl Qua fay ID#* 20191006 Version* 2 Regional Office* Mooresville Regional Office-(704)663-1699 Reviewer List* Donna Hood Pre-Filing Meeting Request submitted 9/26/2020 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Erin Cheely Contact Email Address* ekcheely@ncdot.gov Project Name* I-3819B Project Owner* NCDOT Project County* Iredell Owner Address: Street Address 1598 Mail Service Center Address Line 2 City State/Rovince/Region Raleigh NC Fbstal/Zip Code Country 27699 United States of America Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: rJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express rJ Individual Permit rJ Modification r- Shoreline Stabilization Does this project have an existing project ID#?* 6' Yes r No Please list all existing project ID's associated with this projects.* 20191006 Do you know the name of the staff member you would like to request a meeting with? No meeting is requested. Please give a brief project description below.* I-3819B is the proposed improvements to the 1-40 and 1-77 interchange in Iredell County. NCDOT does not request a meeting. Modification to the existing permit is anticipated at sites 2, 5, 16, 17, 19,22, and 25 with two new permit sites, 28 and U-4. Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature il c�Y Submittal Date 9/26/2020 YD�,�STATEz�� f QuArpriv _- ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S.REGAN Secretary TIM BAUMGARTNER Director November 23, 2020 Mr. Philip S. Harris, III,P.E., CPM Environmental Analysis Unit North Carolina Department of Transportation 1598 Mail Service Center Raleigh,North Carolina 27699-1598 Dear Mr. Harris: Subject: DMS Mitigation Acceptance Letter: I-3819B, Statesville—I-40/I-77 Interchange—I-40 from SR 2003 (Indian Ridge Road)to SR 2158 (Old Mocksville Road) and I-77 from SR 2171 (Jane Sowers Road)to SR 2321 (East Broad Street),Iredell County References: USACE 404 Individual Permit issued January 21,2020 (USACE Action ID 2018-01504) NCDWR 401 Water Quality Certification issued November 19,2019 (NCDWR ID 2019- 1006) The purpose of this letter is to notify you that the Division of Mitigation Services(DMS)will provide the additional riparian wetland mitigation and make any necessary debit adjustments to the stream mitigation for the subject project. Based on the information supplied by you on November 20,2020,the impacts are located in CU 03040102 of the Yadkin River basin in the Central Piedmont(CP)and Central Piedmont(CP)Eco-Regions, and are as follows: Table 1 —Additional Impacts (feet/ acres) Yadkin Stream Wetlands Buffer(Sq.Ft.) 03040102 Non- Coastal CP Cold Cool Warm Riparian Riparian Marsh Zone 1 Zone 2 Impacts(feet/acres) 0 0 0 0.14 0 0 0 0 *NOTE: Some of the impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details. This additional impact and associated mitigation needs were not projected by the NCDOT in the 2020 impact data. DMS is currently providing stream and riparian wetland mitigation for the impacts associated with this project located in cataloging unit 03040102 of the Yadkin River basin as required by the 404 and 401 permits issued in 2019 and 2020, as shown in the below table(in mitigation credits): , -D_E Q3 NORTH CAROLINA DoparYnant of Environmental Ru.Mlty North Carolina Department of Environmental Quality I Division of Mitigation Services 217 W.Jones Street 11652 Mail Service Center I Raleigh,North Carolina 27699-1652 919.707.8976 Mr.Harris TIP I-3819B November 23,2020 Page Two Table 2—Current Permitted Impacts and Associated Mitigation Requirements provided by DMS(based on issued permits) and Revised Anticipated Impacts(based on mitigation request) Total Permitted Mitigation Provided by Additional Revised Total Impact Type Impacts DMS per Issued Impact(for Impacts* (feet/acre/sq ft) Permits(Credits) approval) Stream(warm) 2,175.0 4,350.0 -9.0 2,166.0 Riparian Wetland 1.41 2.82 0.14 1.55 *Some of the additional impacts may be proposed to be mitigated at a 1:1 mitigation ratio.See permit application for details.DMS will provide the amount of mitigation as determined by the regulatory agencies. This mitigation acceptance letter replaces the mitigation acceptance letter issued on May 20,2018 and July 12,2019. DMS commits to implementing additional riparian wetland mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies using the delivery timeline listed in Section F.3.c.iii of the In-Lieu Fee Instrument dated July 28,2010. Also,the stream impacts associated with the project are anticipated to decrease. The stream mitigation requirements for this project were debited at the time of permit issuance. DMS will adjust the mitigation debits if necessary once the modified permits are issued and received. If the above referenced impact amounts are revised,then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. If you have any questions or need additional information,please contact Ms. Beth Harmon at 919-707- 8420. Sincerely, / zeQ2 �Qit l�?,drL James`D. Stanfill DMS Asset Management Supervisor cc: Mr.Monte Matthews,USACE—Raleigh Regulatory Field Office Ms. Amy Chapman,Division of Water Resources,Wetlands/401 Unit File: I-3 819B Additional D_E QNORTH CRRCLINN DoparYnant of Environmental Ruall North Carolina Department of Environmental Quality I Division of Mitigation Services 217 W.Jones Street 11652 Mail Service Center I Raleigh,North Carolina 27699-1652 919.707.8976 l STATE OF NORTH CAI' O JI A I N A MUD MIS aroncr rvDIRRNa wa N,C. I-3819B'1J-6039 1 C� i°' _1 DIVISION OF HIGHWAYS 1:5 4 ,r�� }T! AEGIN PRQJ1 GT S �,ti°� '° rr R 34192.1.2 s.40-2( P.E.00�� 13 Y A f r IMS-40-2(1241 P.E. *' i 34192.3.2 WA DESIGN BUILD itolf\ _ - . , '76,wiiikt .� . .6,..�1�, STATESVILLE IREDELL . COUNTY 410144 I]ir E t `g� LOCATION: I-40/I-77 INTERCHANGE INCLUDING I-40 FROM WEST OF Viewil t = , -:_ 4P-' SR 2003 (RADIO RD.) TO SR 2158 (OLD MOCKSVILLE RD.) & I-77 FROM SOUTH OF CYO ` lit iii v 111111k. I It SR 2321 (EAST BROAD ST.) TO SOUTH OF SR 2171 (JANE SOWERS RD.) ? I ` TYPE OF WORK: GRADING, DRAINAGE, PAVING, STRUCTURES, �c. Etilk, 7 *40 ai- RETAINING WALLS, NOISE WALLS, AND TRAFFIC CONTROL • • END PROJECT Vance _BEGIN TIP PROJECT I-3819B L yr ,, �0- -L- STA. 7+83.00 Mrik� • ' END SEGMENT "A" $ VICINITYNord MAP BEGIN SEGMENT "B" -Y N- STA.I75+00 �vQ INE:g41% THIS PROJECT IS WITHIN THE MUNICIPAL �\--4'� tf Pidliii BOUNDARIES OF THE CITY OF STATESVILLE ,3 \ .cv AND THE TOWNSHIP OF BETHANY 9. 'I'. V,)- 1 f • �. END CONSTRUCTION �, LO l ��5 �,.1I -Y- POT STA. 205+00.00 ,�Q�O BEGIN SEGMENT "�4" ' t , -, 50 25 0 100 2 0 ala END SEGMENT "B" '� � b ktVilil — STA. 92+00 -YRPB- SITF #27 -LGD' `` l WETLAND AND SURFACE WATER IMPACT PERMITS 1 50 0 200 400 �� aR rD �a SITE #13 DATE:November 2,2020 ff�� -IRPCA- DVERSIZED PLANS SITE Y � ��//. (Note:The sites highlighted in RED SCALE VARIES SITE #3 *i aj411P f�� -YRPA- are modified in this submittal.) lilitu �1 SITE v- LIB $Niir `� .4 10� -YRPB� INSETS -YJasITE #6 taw:trs �, - -•-..- SITE #10#1 L. BEGIN SEGMENT "A" Al .s / w{ '"� 51 isCAAc- END SEGMENT "A" N END SEGMENT "B" - . . . SITE#24 4( sa#B ,� BEGIN SEGMENT "B" E -Y S- STA.Ill+00 $ T� jot+ 3 SITE 3 -L- STA.178+50 L SITE #21 �. y� 517E #26 -YRPD ` 1g8 'v SITE #20 �*a SITE #25 `s ii 44 gR0(''1L5� .• a-, SITE 1123 SITE �28 ./15' I4 g� SITE #18 �$ r� 31 %,, r OW 4 71. �# BEGIN SEGMENT "B" SITE al! �ob 1+ END TIP PROJECT I-3819Bwir miH` M �� " U STA.219+50.00 N Y S— STA.25+00.09 "fo i - ,tea. M CLEARING ON THIS PROJECT SHALL BE PERFORMED �� �slrE #22 .�y , r�� IF litillv �; "4 TO THE LIMITS ESTABLISHED BY METHOD III. ,tip` ' SITE #19 To D ` v THIS IS A CONTROLLED ACCESS PROJECT Q�,� + SITE #16 U-6039ilfr �l�'�r 3 ON WITH ACCESS BEING LIMITED TO INTERCHANGES , SITE #15 NO IMPACTS N &•4 4 LANE L •O o SITE #14 Y INCOMPLETE PLANS (No DO NOT MR FOR It/W Accurst I°N DESIGN DATA Prepared In the Office°f: HYDRAULICS ENGINEER DIVISION OF HIGHWAYS °� • • GRAPHIC SCALES 1-40 1-77 PROJECT LENGTH WSP STATE OF NORTH CAROLINA EII1001 Morehead S uare Dr.,Suite 610, Charlotte,NC 28203 o ADT 2018 = 57,300 62,900 °NC LIC NO.F-0165 °' LENGTH ROADWAY TIP PROJECT I-3819B 3.885 o ADT 2040 = 72,500 77,500 2018 STANDARD SPECIFICATIONS 141 DHV = 5,800 6,200 LENGTH STRUCTURES TIP PROJECT I-3819B = _0.124 P.E. ( 'nil --‘1) 5ta SEE ABOVE D = 55 % 55 % SIGNATURE: RIGHT OF WAY DATE: CHRISTOPHER D. DAVIS,P.E_ o * °/o ** TOTAL LENGTH OF TIP PROJECT I-3819B = 4.009 PROJECT ENGINEER ROADWAY DESIGN ‘4:5'N1/#,N. O T = 16 /0 19 OCTOBFR 3f� MRRENGINEER • + V = 60 MPH 60 MPH 3 o 2. ig * TTST 13 + DUAL 3 (1-40) LETTING DATE: ERIC W. SECKINGER,P.E. (N OL� ** TTST 16 + DUAL 3 (1-77) TOCTOBER 30,2018 J PROJECT DESIGN ENGINEER ci_ ��SSti�Jt CLASSIFICATION: INTERSTATE �h SIGNATURE: . J.. STATE HIGHWAY DESIGN ENGINEER PE J1 alb / "l ) s, o�roe111.<uxC Daiod ""-. 9B" I sxen/0 DETAIL 4 -I DETAIL 32 SITE #3 INSET I xc c c o.r-RIBS o ENERGY DISSIPATOR BASIN PIPE OUTLET CHANNEL STABILIZATION -e 344 -rRPo?- RIP-RAPPEDNO //e/ DENOTES FILL IN ENGNE6 FNO1NEP I Nolto Scala) Pl Sia 33'43.8, es Ste 33'41.9. es Ste 34'48.9. PI Sta 34'17.0. es Sis 57'46.J1 PI Sia 558'350' es Ste)58+3520 f SECTION criuv irysEn o4O m ucrv°Tw°To y WETLAND Natural Bed 0=B'29'43%ILTI Bs=Z34419' Bs=257'489' t1=2l9'/10'lRTI Bs=257'489 t1=185 48'350'(LT)Bs=457'OB.4 - Elemtian �eaw —1'— D 1.54355. Ls=50Lq' Ls=240.0Y D=22glar Ls=240.L0' 0 55z41T Cs=144Ad _ 'A amI L=444b2 LT=180AZ LT=I60Ar L=94AlY LT=I60Ar L=2b4326' LT=96A4 .«S., "O ,Row. DENOTES MECHANIZED or... mu T-22282' ST=9002' ST-8002' T=4700 ST-8002' T-52740.87' ST=48.03' "°a• s"p ov Avw o NAnrAS cwNNU WimN. a e a s CLEARING Ground SE-05 SE=06�� SE sax" ro Ds 60 MPH Os 60 MPH as=so MPH _ ® .lil�I a"a " ror °'""'° ��z/*tea e" DENOTES IMPACTS IN Z $ r�r 1 ���`w 1� '/j// SURFACE WATER 7 v k PI sia 235+9232 Pls Sta 239+2099 Pls SYa 246+30J1 Pl SYa 24]+6I9O Pls Sia 30+68J0 Pl Sto 34+2403 Pls Slo 37+6624 f� ' au,Laa •'•e=• - (j Channel Bed c. 0=r54'59T(LTl Bs=f54'355' Ls D-23r31.5rRT1 L =534'385'D=28'05'2/%!RT)es=0ee le.T , // UNLESS u.SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL LeneR'- 22 Ivanablel 0=f5.34' Ls=20000' Ls=16002 L=03.60' % Ls=14674' D=53.98 Ls= 00.00' — en ===,= 7.••'•:••'•5••!••'•P•:: j/IX DENOTES TEMPORARY U H. L=52534 LT 13334 LT=I600z L=lo3ba v=r4574 L=ss396' Ls=200AO / IMPACTS IN SURFACE WATER Z Type of Liner= CL 1 Rip-Rap-Raved-In(No Geaewile) T=26334' ST-6667' ST=8002' T=5l6/' °—"`L_ 5E._u R=3LOON' R=2330.00' ST=73.40 T=282b8' LT=I292Z i—� BALFnAx -YRPC-STA.16+04 RT SE-05 SE=06 R=1J3DA0' ST=7090' 's '?5 4 7 J II N ��TTpp 9y� [pp�� EXCEL REALTY TRUST--NC 05 60 MPH DS=60 MPH =EXISM-TP.0.061 -� + �_�_�_�_�_I DEPAfrf, TRiP641IBQsTlf�t1;IRB F -YLPC- -�, .�,. GRAPHIC SCALE-INSET .Norm swE Ply sia 11+9897 PI Sta 18+4408 Pls Sla 24+80.77 — Bs-1548'ZOb' t1 23Z 10'52.P rRTI Bs-I548'20% P j l I ,,- •.•.4 S ■_, .�i'C�'R : sr=1s6372, Ds 302MPH sr=ssiz �r I -_ ., .... , \ �11/ 1■ 4 \___,\ 164 SECTION A-A Ls 1'5'46 D 232'125% Ls-160A0' �` L • ‘,,i7r rta\\t_ 'LI 0 ( —I t .,:.=.=.22 5 OA w..M,..:,„, �.•F+4,4.4 CENTRO NP HOLDINGS I SPE LLa :1:4�r p Cuow s ^�"� �wRE.A"R.NT N °� :r7: „ Iag is\ --.J 9,5'. 125 1 129 /,' /0 •, ONwow ''-"' / / €oa ate. ' IIb'' I o -' --- \ .0 Z. DETAIL 20 PREFORMED SCOUR HOLL : p5' 1 1�% /°° / / / •} Y/#14110.. Z;l1 ¶4!1 , , Nif—_,,, Z_ ----€.- \ 7 4040,,P 4-• .',., -. 4 11 ,,11--=_-: .-------i"""') , t _--c: 7_------' ,,„.---- /Aside' Tv,''' a»» Z I ►0i i ___. .. _...... a �� ..,:„.„ %% __ .__ = _= °,Eon°, N—%riTRtli LL — �� IlJ ssrnoN,•. w-• 70+(0 �I �NN'I - — I -.._, ___ _—xtug _--__ � !- °-� �: - .E. t.�F - \\ \ O` /��/gyp/ p ,.n,aEm..a,. r 1..- rr i�r.noo -- �Q� r,•� F/IY1 'i Lr —_ , •J "��`T 9s a_. \ �Lj �A 1 m Niti,,_ �I— ® �" h Q I Elmlimiiimiiiii - ------- -WOER- - "; jai®mini imomommi 1 1 zN.4t1 5:4 4 dildAig\‘11 - 'c am+..AS... 111 r os'a,A,,,t4 Y\`�w��� :od,' ,iR_��m mu Dw- �.',\vim a� ^rr�n PS H T 0� e�c ...vsrrr�i t: .Psiw r.■I ♦�♦��.. l l �i 4 2 GI J' _ �. rar,carr ��ne ...• �� �a�z�� SEE DETAIL 27 ����� � �' �. jI Fad'® I � w,,,��r .,�-� —`.� \ • ♦ ��i�` 6� +'I I 11 STANDARD REINFORCED � Ij� ��' 10 „o,.,„ —lawna�iuia .�� �al■e�.�.. � ffo�•,,, �' ;\�j l ®fl SOIL SLOPE (RSS) v�/#IGkI — �E��'�''�' `"Gi•�� ?1 "ETANBParr,I ,xaNN„ :j •1:la4l!ip.:::. \ \` � I. / 6`� �0 GROUNDWATER POR�1.5:� �� �� ���� � I wD ;b- v R�� ,,. , VA a d� WF *�4, 0jG/�I����.�,����� we n:._ aN, \I S ``o\ iptr �a01'a I \\'k n � * Aof- * 96..,♦• .''♦�♦ ♦'. \\ Pl Sia 113+91b9 Pint,,121+7406 Pl Sta 72460.46 PI Sta 81+2521 ,� ,,, ■■I pi�\�p�� - +� �;��� ������� C r1 238'12TrLT1 Z38'l2.7lRT) 4 23812,TI A-508'l27,RT) ■ _ekl - cif * jCO't \♦.♦.♦♦♦♦♦ D-O.20'133' D O'20'l33' D o2(Y185 D 04z07% qI !ll��� � � / L-782.37' L 78237' L T7906' L 73159' 4ik4■`°a �\'\•t%_ SITE 3 f ,- �� 0\11...:_, T 39126' T 3NC T 389b(r % SE n .00' SE=R .W' £=NC28A0' SE_8J60L19' .•. / 1 �„L \��4. Y' • 1 ,LgOS 60 MPH OS-60 MPH Os 50 MPH OS= 0 MPn • Aie , �\\� • p7 \ ��� • .._„ - .� PIPE OUTLET NEL CD C —� -LCDEe YRPAC rRPc ,A.V r \I `�,� �,._ - \ \\ WATER AC1I .t S`I STABILIZATION\ 2 sto,v378 PI SYs] sy, Plsto s8+749, pl 5fa 151433 ix Sfa/5+5995 / W/CLASS 1 RIPRA' . 0 220082'n o 238'18.5. D=6.52'417' Rn Ls 45rD6.4 •' 'kC, %\ \\ ` t SEE DETAIL 4 �� o o2aaez D-o2ales °D=sszar aT) D=s5r4/ 4 Aa e .� \\ ,% /W�g • L ]8569' L 779.0N 59E L 1b9258 L SII9Z LT 96D4' • so .'` i�1�1 ° - \\ +,,. T 3929M T-38960 T=1344Lq' T=26433' ST-48A3' r• R I7A7200' R I6928LV' R=833.00' R=833AY nvs - INIC SE=NC SE=NC SE=LK SE=06 '''iYe'/ Olainfaikr 1� ��. - OE=N MPH 05=60 MPH DS=50 MPH OS-50 MPH - WF s I \ bot \ ' PB DENOTES FILL IN YRPCA F �// WETLAND PI SYa 25+4952 ` Pl Sia 29+749/Pls Sia 3/+6693 _ - � \1 1 //// / \\ p-39 2'30.4lRT) B =3.35'l4A es-457'08.4 5 \ ' \�E1® 0=458'56.5 Ls-14400, Ls 144AY Nk, . L ]86%' LT=9602 LT-9604 •.• . _ ' $ �y, DENOTES MECHANIZED \ r a05� -ST=48or ST-4803' SITE 3 \4s L . . N. CLEARING \ 1,..... sE=06 a��' , \ .',iyQQ 4t a } • DS=50 MPH / , 2 -43 %y/// DENOTES TEMPORARY WE i •.•\ , / -1 1, FILL IN WETLAND �\ - L 2 DENOTES IMPACTS IN \ i I1 �1 X � 'C LOCATION SURFACE WATER \\\\ \ \ / Q s we E_ ` 9� LIN P' $ /�// DENOTES TEMPORARY \e s, \' A. \`� �, y - 90�� DESIGNED ,�� �W"� ` , IMPACTS IN SURFACE WAT '�., \ �'' STA.66 T N �\ \ SEE $HEE 0.22 OM 11111`i111/1f1111�atlit 7I/� `.. INSET \\S I) s,;,a�r�.o;N rs.5,ffiRB DETAIL 3z SITE #3 xc a c o.r-R1Ms DETAIL 4 ` '��„111r�l„i'-1„�"L NFRGY DISSIPATOR BASIN PIPE OUTLET CHANNEL STABILIZATION DENOTES FILL IN ENGNE6 FNO1NEP I Notts Scale) ea Pl SYC 334+B:��P Sto��'L �.r SYo 344 �"� 3F�9 - A SECTION iaus x nsF o""a m ucrv.x..o //� WETLAND NaNral Bed 0 2943=1LT1 BS 234'4l• 25] r4 Flevotian w D T S Ls ZIOLO' Ls 240 -y • xo 'A •z 1� LT 1. 4 Of DENOTES MECHANIZED p Gro""I °"' C° E-3AgrA(I 59=f10z sr= "M _T ��� •«'•••• roo:x. ,Na or MrMox.o xAn".,exxxE wo,x. °o,x,wwe°ox,MOM . . . s CLEARING Z Ground '^ D5 b v�tr � _' �� ' M lia a xx c 7-- %A . R DENOTES IMPACTS IN p Pl- P1s 6ro 23s+2os9 1s sra ,1 ,J10 YRPB- / �'��`w OF •' // SURFACE WATER Channel Bed 10 59T(L Vi'r 54'355' Bs 2.57 3f "••.3 Pl to34+240 / Sto 3] // LIMESR ALL DOCUMENT 1OT OMATBREE COMPLETED 4 = - 4'389 2805'2: 0'20'' knell' zz I=bel ° T54'3 Ls-2000a Ls=240 �.gf, • 22oca . 504'1 m ,e./" ► "• MOM """"" r x 7 \ DENOTES TEMPORARY u H 52s,• LT=/333C Lr=/so 2 E i 14614' 55:ff Ls f P •1 / IMPACTS IN SURFACE WATER Z Type of Lner CL 1 Rip-Rap Keyed In(No Geaew le) i T 34' ST 666/' ST=BO 2 " R 3:"•,. F """ C T3.40 :208' LT 1292 YRPC-STA.16+04 RT mir (�R o0a sT 70, I �Tp9� [p� -Cc"PEAL MST - DETAIC4FN-PR[tORM[nW4t Orr IF L , 05 60 • A ( E=EXI,ST.fO M.f -� + ,. ::::: xis :9T PI St 18+4409 P 24 '1' ::::::::: GRAPHIC SCALE-INSET V JUN ' B l5 20b 232/0'52.4,Rn Bs 6,, �jYJ !4i I ��`�Iy��' A 5 , L_T-10709 47,5JT' .09'(1 Ilk4 �i� � .�,xnx� ro o Ls_16s� T l sr so /��4. � I, ! l� L � \ees``�ll\� � I E�Y _�Il V m � + + � xxw R ��1� LI a I J N.. , IJIi� lI o II I , n•.x : '°. `1 �i\ p _xx.,x, .�o��ce�s� e-M ki f3jryl(�Ijl1l�I�.�:I I _ F, j �x a � �\°'''''' ''' w-. K sinuR s.me i'1 • 1\ I x. / 505" � eii , YIN 1 b, %Ai a ' /sa'nox u �� \ __ a STD '°^ - / :s ,v // „_ ,3"" ) � ��- Ia��•*':.:-74:',s,,, 0 \�v br, .....„...,,,....— -,_ ...k.,a(Alli,„ %,,,,, _ow r'y tAttl4 (co,„ ..t. N.-\.., 404& I., . r';''' _r. Irtirilictrk„1,_,:*,, ,,,,,,.... _,,,,I _________,..451 ,,,„ 4- "4: \''-)) DETAIL 30 PREFORMED SCOUR HOLE ' •xa..a ,r : `` - / 41.OPIli fit:‘!•:.:4fr.t-,*:\.<V,*,,,-,•1,,,_..',Li4t ‘N N \ %• )4?..'°,1,.' ‘%Sk ),All \ 144 ,. *4 4,4 alt, w� wp L,,.,,_...._.,____________ ____ _,.. ',.,.,.......1.:;-'.7\,..,w..,..T.EC---f---;=4i,..,..-74.of.iiriir . ,.......„:„.---""--,,ri.. ....r 401.40 ;/rii.e.°44,4r17iffrA,Ast'y'Aillif:01;471‘ \ ----- „,Treimerw---. 41 Avreffm gcm , _-----------.10,-...000.-""0.-. vio'l_,•-- /., - Adlb....-- - ..- —,- .- ---_---- .7,1,1111:'-13._(1.2,2"1° .1 .,_..'"- c N 1/4, iip or L. .'''71144:1*---1/4‘..-----y_,,„."......„...riref A----- ie ' glilli, ,,,,,,r,:v ap.-- ---;i:,..,,s.,.-0,.,,,\ �, ).... r . .,„,..„ ... , -- —_........ ...5 R _ 1R i I� Megl. J■r O 4 1*-_,,e, LL gimilligllilj _ �R �'+�� -- yrge�F" �s iirriia-oil i�FI-1,1 i —,�T�SGff mk 11_ � _ �=��� �V Q `O4 #thi/'- o ... _ '— ma x- ��� 111 ii, wr,xv w _ ��I�@ � -�.�S�ranpa��w��m T rt U !� ..... �: ������� zap_ - Allit Abi 4 \ �♦♦���,� +4'� i, � G'1" •E . 1// �'•'4 ir -- __- _.. _, _� _ ice.�., ,.e wr �_- �iT gq:0fct11a7ma7 d3 °>aA.itl. :e�1B!°Jl::: .-'__ _ '04.'�nti` �O��Oa.. i��� P ���� 11_ _ 1 _ _ s�a� a iE�4 ���___ ,ys:..�d..�l '�'=���I�1t16A1:.— H7.11 - V��:t..'p, IL ArifiifilrilliliPr.4° ♦ �� •�� It �.vsrrry dyrriw� �t Lrru ��, SEE ET •.^�`-,,,� ;a« e; �� Ax[r�iA•4g ,r;irl4rAl!,r �m AIiA,iGh �3T�A�3�, �II� v ,.„,� :il � ��� s,lp�F�?3L^- It e�r�. y _ rs�� .F%����\RY�f.A;3/�� ���:-� �� ����11 ..� � � ���� �1.a��® I e / �\VIR _.IG/41111 �0��1�0eI i. I61e, �' o! ir'1i14 1 DARDREINFORC D .�o ::; a Q.���:I �irEia..;.-�.:>o ; " 3� S\ PE (RSS v�/#IGkI �.��••:::::*•;:,:ii.T.0%.:42:".... �� ' � j:I��iTEZ�' �' ��47 s R� 0 GROUI�rDWAi-ER PORE ri*** � o/ los 94 • a •� � � �° $1, ��' ,V. 10141:, :14, s��Y '� .,..,. _� ���"!\\O\�\\� •:4 "" '� �i;t.��i� ' yi d. 00, ��e ' ���� �. �, o I3asl- ¢nor:z';`72sren r;sn2 j B027• c. e s1 •�k `� �� ���� �• ���4,.. ��� 71 SITE yfr3, D r2ry 13 D 0'"l33" 0 02(YI �T�, • \. ' \� ��C, 9 . ♦�\T ••1639i26 r3:r6a r 3 T 4 of \ sN*R .Ooo, --PiioO., R-l69 Oo' R- iir \�7 ,t ♦� �'`r__ °s 60 P• H D5 YR�A 05 � '` i�i� I�III���f E ` yy- 1..,, tPIPE OUTL ' ��SE NCN� SE NCSE, R�60 TP o ���� _ fir �y�t a ����I�S� \ �- li�.'idi]:L•1:.�1I1:.:Ca;\ �;�A q �� ���;. TT. STABILIZATION . Pl 6lo 6T+4•]8 ��o s PI SfC 5,,E, . .P.. }. 4\\T- '•�� R T 0� 1 \ / . �m 1 Rp p 238'27'lLT1 38'1 p 11625'10 p_ \'E^ `\ `. L', 0.2a,.z p18.5" 0=6sz41 °_ 411D �. ,r , i�r �` �., \\\\ �g W/CLASS 1 RIPR 7a l L-Lcs256 L-Sus • ,. •V�1� � '. \ A\ .�VJ , �L 3s2sr 8B6" =1344W = ���Ri�r��•q' $ �� \ SEE DETAIL 4 R-E9i. "M 38 'Ma R,`�vg 4_4.0' R= .'.03' •♦ �ailtr . \\7 f IIV� `�,M�, ♦\\ % .. M\` ' OS 6°N-H E.,6P": OE 50 MPH OS O I ®'Milk'', .„ix 11,44 ,I \ \, ��� DENOTES FILL IN ,ra,.-. 0:-WETLAND ' PSYa 25+4952 Pl Sia 29+T49/P/s5Ya 3/+6693 ` .7 ,�� \ �3'�' 39/230.9'— 6 =3.35'l4A Bs' 45r'08.4' ,yam/ , �.,�xx* ,, * DENOTES MECHANIZED \ . A 59� -T=Oz sT- \ / + + 11,� \ yCLEARING .. E 1J000 411. %Ilk 11 h' ' 0i ® slisw "` la 14AAV i L 8 F// 50 MPH �J\\ r /// FDIEN IONE TEMPORARY ;,\ i, I\ ;� ® \`.s I�� �.� L. �� `�iOQO O yO�Am � "ounox. DENOTES IMPACTS IN 0".� �� �� '� X� � o SURFACE WATER \ s ,..4 . \ ,. _ i � 7GHLINE qP' �q S� /�// DENOTES TEMPORARY �\\c'� \I ��, i - �0YRPAC-5 y�Py�� w+®F,. c."". pr sy k ,„*. s TA.66+ 0.faG IMPACTS IN SURFACE W ;��\�\ -- �� \ /� S SEE SHEET NO.22 c„,cwE°r. °AxewaLn, w,E �rz°�r PROJECT REFERENCE NO. SHEET NO. N X S ) S ul Suite 6140o,reheaar1lotSt;71Z 1?;Y 03 1-38198 10A SITE #2 NC LIC NO.P-0165 SHEET HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGNNO . '-. TO REMAIN- ZNI DETAIL 84 "C P-Ill 2GI 15" RCP-IV RIP RAP BANK STABILIZATION 4 0, _ 0_ (_LI m _ Not to Scale) I------------' See plan-v- My TZG1- .N.I. iN G BEG. SBG Ex.or P 1.0'min. d*j DOCUMENT NOT CONSIDERED FINAL ZN, r.rade Do not disturb UNLESS ALL SIGNATURES COMPLETED + •4.4 bed or opposite . mAsH_, 2G111. ____2'. ________ __ --_.--_ .___.• - „--- , 1 Type of Liner= CL 1 or CL 2 Rip Rap (see plan) If5" RCP-IV F *d=18" for CL 1 and 30" for CL 2 (No Geotextile) 15 00 me* it i ft------—Wa F sm. 15" RCP-IV iLrligni — — ____ z -YRPCA- STA. 18+65 RT -YRPCA- STA. 77+00 RT lerdfwgiarAWIMIWIrjfilaillelfrairPWAMIIirap-i.V114----1144-ALAIII °-cc' A 400 re WArejtj r "'' '11 Ki I I Pa I I 6 a I W Mi, A I PIVA FO rA I-WA i i r -c -------,-'----'"=".----,--------.--,9,4.' 441P___ __Arirdp-Wpik ' '-w"HilrAMAITINAKIPAIrav - -II I 1 ,arrnmmumar,4111115110rawmp....-__ < -r- ______4 -4,601,4 ell , 4,07FArarrOArsilehh, 7-,--- FAL-'t*.*I*,*,* ... , -Q. - _ -*-**Ae**F*** ** . •,* - , T T, A, , T A A . ** *** * 4**-444; ,444,4-r- . , I .. A, T ,T A,.* I .* .k _* •k .* 411r, A A A A A A A al ,L .* A, , , A, _,..* , , T • T • t T • 10; -----Pliw . A A . - A A . „ A - A A A A A A A \ A „ % A SITE #2. A A A A A A A A A A . A , A A . A A A TEMPORARY FILL A'' A A A A 6> , A A A IN WETLAND l . (MATTING FOR -- — 0 IC— CONSTRUCTION -Millil ..= ACCESS - BRIDGE _ 2GI -1 . amm I STRUCTURE #12) o 0 ce REMOVE ___ c • :• : ,11-1-•-•-•-m-E-N-N-1-imm-immm-1-"-1-1-"-- -"-"-"m"."."."."-"-"-"."7-____ 6 — I -1-- .. j I 0_ M T l_ Lc, - r - CL B RIP RAP ,., -- _ _ — _ F — _ _ SITE #2 / r --' 3 TON 11 SY — — — — — — 4.: F vionme.„• _ ._,,_-.. 20 7'00 a laikw.Aw . Ar ., I OPPAIIIIIMEavim sii .,..... s_ W4OFFAISWIF•fl /Mat 111111immumm.... ..______________00 DENOTES FILL IN 0- el /F ero IA. 81 rt 0 / WETLAND 11116.....(P<CrlirilliF4r411111;4.4141111111Prigill.7111111111111211MIPAgdiAlh" i 16‘_. 71.4.4*4410P.11414144.1*ijr...I aretiATA#A0._ 8'MHO ** ***+* DENOTES MECHANIZED N -........i&0;04._ A....,W,4w ArAPAttp"ifiliw"„,....-- V liy.11111111111.mm ,A4 el * * * * CLEARING L N.:*S71,4"itvicr7,4-4--w-4-1-Le-c-w- --#4 _...E,, Ari ill , , DENOTES TEMPORARY // FILL IN WETLAND Fee '46°- Vr40011116: ' Arriff."4",* T 11M TEMPORARY FILL i T • - Alok Amr...111 ,' , CLAA " •T MP ' Ariadireet IN WETLAND BANK,STABILIZATION • T a ;1°) (MATTING FOR ii- a „ A . A ...m,, ,SEE DVX1L9\484 41IP , AMINO' / -*10. TON . A AAA A CL B RIP • , CONSTRUCTION AJo° ACCESS - BRIDGE Z 50 25 0 i 50 100 __CILE__.__I STRUCTURE #12) GRAPHIC SCALE - INSET ".•,-.1, 2.0_0 SITE #2 N X S I ) IOOI Morehead Squaie Di., PROJECT REFERENCE NO. SHEET NO. Suite 6I0, Charlotte, NC 28203 /-38/98 /�A NC LIC NO.F-0165 RhS SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER TO REMAIN + N DETAIL 84 2G1 15" RCP-IV N `_ RIP RAP BANK STABILIZATION r-_ (Not to Scale) �1�JfL�1� See plan-v- �- N iV BEG. SBG Ex.or Pr. 1.0'mir d* DOCUMENT NOT CONSIDERED FINAL +94.4 Grade Do not disturb UNLESS ALL SIGNATURES COMPLETED GI ^ bed or opposite ` a r . bank —r,r.`:-mot 1l•`�_- J _ � =M. 790 f S �� � �,,... --__.�___-��,_�.�� Type of Liner= CL 1 or CL 2 Rip Rap (see plan) �� *d=18" for CL 1 and 30" for CL 2 (No Geotextile) ra_ inpra — -- -YRPCA STA. 18+65 RT ArApilD�� --_ AIM — 780 0 -YRPCA- STA. 77+00 RT III ; - -- ,_ „'.`ter A. �1 1' �-a��_� .:�....._--\\\ .1:.- ,,,.-- 4 Z...........”..4...1,,... .....,A. ,„.441,t Ahh...,_ 7 "ArderAor 46,- Ar' F-Arr or , N 9E 9E �E if if '��E �lE 1 n I �at_411 jt*,-*--*,-„ - ire' Z. ' /4 .4e(' . �� . T A, ' T I' ,r , , _ -- . ** *** * * iE IE iE iE ,if,* if, T V V . T ,T Lk k , ,L ,, ,, * ,, .k , i .. __P&* , ' . " * , , , AAW1 g 4, „ . _ , TEMPORARY FILL IN WETLAND (MATTING FOR wimmil._ _m1.1_.. m �_ ind _ CONSTRUCTION i ACCESS - BRIDGE lliiM STRUCTURE #12) _ dwil 7ml M �� 7-7,141,6 m �t`' �� � ,f III � NIPAihsr- 4..,. �,\! i fi. i.A" C7� XiltS1'I F F� DENOTES FILL IN ° `II�' ;aa�es'j�91 � �il �`*� ,111111 //// / WETLAND ,1 A� M NT `�i�� �a� �a\� �� ���� rr�Ii1 ` , , * • CLEARING M � \- • • " • : DENOTES MECHANIZED 7,, pl- S, erdir r' , , lifi\4.4 47m,olikr, ll ////. FRILL,ZON E WETLA ODRARY di i° �/ Ni .p.: _ft 4ior "WipAtiro7ipA �‘1,_ . k •;,140.- VP.A0/004_•.‘r ����„ - TEMPORARY FILL‘W211:01WAIC kek '�'‘ :\ ♦ ��� p rat`! . i ��- ► �� 1 IN WETLAND z BANK STAB{LI ar �,� � - �� & SEE DET ,I . ' \'' �� k b. (MATTING FORa �� �10� TV8.a a 811PAii �� ' CONSTRUCTION U ACCESS - BRIDGE Z 50 25 0 50 100 ■ ■ ■ I STRUCTURE #12) ��U o GRAPHIC SCALE - INSET 20 NNs. m.L NdOrPe6 oax3 Rxxx o. . , �, . / INSET ,„/:.:.•.,' f r € � lY'��~'��~'~' I ! T NO 23 wL .� IZU; //~�Y/�~f~/��� SITE #9A ;: :.::::. --__— /4 xxRE,,.RR,xx.rxaR,�xxry.RrRR • TE #�~��t�~'���~� '• \\\ .:L • ,, ,' e • j -- -_- - CHANNEL CH oocuxexr xor eoxamexeoxxaL TEMPORARY BRIDGEDETAILgNGE el1ti TO BE USED 4 a, HA �"��'�r ib � DURING CONSTRUCTION gL °/ r' /lliAMT11peer /0 SITE #9 r Q sir ^� x x, ��"�'�� -�� -TEMPORARY SURFACE � !�� a �(/�y�ray'-_►'_�, ` O SU C e� ® "fie. gun -\ �r Max d e H ►Ii �/� WATER IMPACT FOR, x 10 p \_ 0-6 ryF ' � •, H.,E�,a., (. /r' C w.W y r 9PW.\ r :/ } T�YRPAGFROMssSTA +)4 TOSTA 33+50 401' 2 EXISTING 7'X 7'BOXfro �11 /CULVERTS TO BE REMOVED �a �� ►� xo /. �� • „' � • I // DENOTE IMPACTS IN i.iitotzuk `�,'Iilk \� +. •" F� q",�... _ — —— ! ii4 I 7:0)#14i �,! � ��raV�rlri7l irrn ', `rrrl ,, r, c V _c \ ` �\ �� "eiSo��a a/�2 7' X 7' L-O N L DENOTES TEMPORARY I ����� ,MU n� , .. d -�A AlitiltIit �� I)YI !�► ,• 2�� CQNC�W,� 1 // IMPACTS IN SURFACE WATE�ial.11r � F'iT '*+11.rs.� a� rFul/fiy,6iiFip.E1 "w'� �`\� ��— \�\ N ��i►i PL �o x �� ...�e111:�■I.■r 4 << ■ ■ ■°► oxm F wK �g s mrYE1�.■iRiryj_ �„ \ �, O ."/MP ��:�` +�csvo�. 'd ,ray � ����` Z .‘ `� .EE o,.x:,, GRAPHIC s�m-NSET 'ta f�>•O�e5 _ ' .,� r o nrrr, ,/p/, � \ \ / /^ >r \� L. 5 .- ss,au cur vora ` 1 rvnw ocm u"xc ... wa eovrs \�\ 1 \� T� �'�'d r,,,� � , \ } N xox xxr[ \l ,[ I: x,o,ruL s O r.,xx ;n ro .... .... Z i is—�� lii 1 ce 49�#9:I��ii/, rs� - �9�#9'I4Miil: • Lw w ,.,oxx,,. / .a, ��_— u I,aI R — —_ ��'� .. a I \ �„ // SET _ _ ` �1``E ,. - o.E — — " _ o s N I: rRmx^ -._`) N ro . ,. 1 JRlee&e x c.,w — —= _ — =` — .. $ w — — .— mam...rum — — -- Imo_ o //ffaSSp.Fi $s I rr'I r1$ ram Yg " ®1■.I....II.11® -- --= _� saw +: xw.r�• - a.� :. - m1�.. ■iH i - --- i. ea. e■ m la ■ � E J'APE I11 CYO �w '. _- III■ib1si lidi.1. �, ,, ... - -- �.,�.. �, tea - ��s .�. - N , �- a> +s l ��:i- � III■ Mr Imo. - .,,t as L SS1T� 9� ���-{' r miuihIiill f :.: ox s i o E,�,.M,r, r — .Ax. M _ R �o w w M. reom--. —•—�..�-�1.iligAIIMMIi■IiI11711Ii -_•�xr>'Cif..., _ — — — — - N o t ®••"•niiulli.U�. - Ocoee ��•,�Y.i� -�':'z'is lC Aq li �1 ..-. _ — ...: � ■■:..■17..11 .E CO n II ■■.I■I marn1M r 5€m // �emxan� 6G1L, ° G";r 11 >1iii�1 ■ w r sTox.,:. A N F r r � . F g �I _ x x F LLI Z ° ,6�rP /- LP.. x. xro ,`;o.x,r ., x�_� �� SK "„ c �.;C - Faei a�,x n x,xx \ / yx0 ,ro4',!I/ ..'D..x x..x / '�:� /i:14aI\FMM x "moo, x / _ +r�� iw�� ��.. �' INSET „ x ,c ,. „`. .3,. z ror',w u"« `-�,E F, ® s #i� i s" a E ���ir titiwy=iz �� P= ti�� ~ \ \ I - Ij ' . _ � a r= —ter n �� �i,E .uHErx., R Ir ID�JC R dD Yeti=�� /j / i'i� x �� . • vie _ � /Ma��/AA �/���� ti tser / / off.. ///i/ E 4 •,s s E = ia i I ' jgiP t,TrC O N c 1�•.©~�~��ii1L�r AkVita ti ti 1 / xrl'oux �/1/, u :�% , .0 . 5 —_ Y���iQ1Y ��! ���►� I I Lit►ex ����� � � , 2 ExIsrING 7'x 7'Box � � $� "`""x ft % � � „� • ��. ������► r���1 r �1�� WtiM CULVERTS TO BE REMOVED / nab.x,x". I� ��_//_� ��__ �r a. F. X/ ♦ / �• z I �1 ti ti G7 '�/ AV/ r� 9 aA � � Ii R gI " %��Cy�.Ia�_ %' � ��I/ 3G4�,o %� �f�/ ',`ey a :. UK I y-� �� 1ti mmmmm ? TEMPORARY SURFACE WATER E �/ 4 i,,,4,7•�� i % -- . x P"R xEary R ���� Y��/�' r i/, pPPED IMPACT "la /. , /// scwwx"ono a.RweRs,uc ' lit. ������P�� DENOTES IMPACTS IN / / -.' / I WI SITE #12 SURFACE WATER ii • / // ��119 �a,.,ors �� o - t' �'ti� ...r�`r "� � �� sx°xx .r '" �� /� iR\O RppGH 5j° DENOTES TEMPORARY r - N�� �pP pL pETp11.S __ ,' IMPACTS IN SURFACE WATER F//, DENOTES FILL IN i s I ^/ .. /// WETLAND / C IVY G EC EP _— ` _WJ_�_p` l �.�il/ DENOTES AND 5-� A GRAPHIC SCALE-INSET Z� �A1 / T Agri;�/ . . . . (\ DENOTES MECHANIZED �� r 1111 `! '4'jr'izr__ /•x••••• CLEARING �_ \ 2 / DENOTES IMPACTS IN 01 \K I //////// SURFACE WATER ,� \,/1`p N �u cauxr..ueox. ICI DENOTES TEMPORARY r p���` ` , ��� 00 _/ \� // IMPACTS IN SURFACE WATER �QP -_�AIN J VC. "` Ii mo..ea,a sa.a.en., "mil 38/9BE" �•l"�,dj��$/`` l S�OeNC—LIC NO ESP,01658203 'Tar- c NE" "o �G NE° ii1 INSET 4�� fit �V =/�, msyr, T NO.23IIV �I� litigiAl / � -SITE #9A a••.:' � 1lt',����I k' " ,..� �� _ tAki NATURES COMPLETED �� � TEMPORARY BRIDGE �� 193 17.r.',- _ DETAIL 12 '!IJ CHANNEL CHANGETE # Nti�� TO BE USED `�� :11 �/ b 4. _ : .4 . 1. - DURING CONSTRUCTION ® M 4►� glrr 1All( , �� 11 te► mot, ' �/ -TEMPORARY SURFACE ,,, - I y - �kaltaiiw. y�/ice WR�«Lr y /���I/� 1�� � � Q 4� �y �"�WATER IMPACT Wiree'r'''-;,,,tVI17 �: / d R 6 FL � � ���1r �� ��, ...c.,... ype dLner dCloss2 RpF"p j., I �p - k � T YRPAC-FROM STA.1T+14 TO STA.33+SO ., �o , 2 EXISTING T X 7'BOX : .�+ts N r� i��' i iCULVERTS TO BE REMOVED �� �� /I� � ■I�A ��I�� le/IFflite � _ .���� ' 'A V.11:-#4t ,." ` A l 6. 0J -' �^� DENOTES IMPACTS IN `\��I ` � S. I h0 iJ k _ icfr �T -°, ' P� ►jam, //// SURFACE WATER 1�\��.�\\N fa�l� / �„1 Ir#°'"rj \, ' Asa■{p\O�`I� �• ` L f 2sbo�lt� ��f ��. •r.. 11)1N�;. :: t�N_\\\`--' e«r,i. ,2:1: ,:o ®k •..�,a �` . ,1'i-� tre, ram/ ,� .�/� DENOTES TEMPORARY l%.----mi R� �!7 ' ��J;/.«iu_!�•.: £4 4...., CO 1� it .-vr �d � �� �IrYI//N ..4 la 711�V \4� �•�� �Lf=nr>ra��P y��� •E��ign �(����j/ � � .14 �� �����..�JI-_= ��� IMPACTS IN SURFACE WATE .... :. '1/N\R\�\�Y1Fj�;T:,,� .aii /.�iai°«a"llfriEl !! � P���� ����. l�lll�l% I _ - 1r. v a•��ad .11 lI .. • GRAPHIC SCALE-INSET • i�..dT *�. \ L' ® r'Ae�`«SR,II�RW/�`irl�RrIRRR11- •.� is .l � ff�:%/lllllllllllll_ �t�� CI 0 - Q >..„ \ MIME % :. It*.,.. .� w� �yplt+y@QO� v\\-� A � :. _ .E� nn, r�a; *C ,• ui � �� '! �/w�/d �� �_ �-��� ��.. \ F7 O i \� Wti_�av FS ..:, ` Nay .�di, � V.YS f l / w:. : +, � .: ���� \� wy: E>f'f�:rL._ •�"s(${3w �ll%rIh � �■t�Y.tFs".��i��Yl /!1�((l(I!(111�� � II ���� -��� a. JffArAvirr ���#�:I��ili> )1111111114oir mil �3.`` N �s w � �:� «III ,11; I= R, nm °li ".' � � Li _ I . illmiar _ -- - N _ \�7 L. fib 1 `` W\\\ 1,1/F/, roma ,. /,� ��� '3 a3> .; ] _ —ter  ��---� o= 'i.� - . _ + IIE11e - ���i � relnef�.u�Laca. _ . z f — RflwHlllrFLR _ --- - - .. - -- _ _,. w -.: _ �, II.�„°1�'H�1�1 ININIk.:.s1 :... i.... — _��.,a.,�!//i'a itlkirr : Mr.�..,_ � .tea � � - �_ v o I TA��iilpry \/I RIIb�Pig �-�K�=LZ - :^� -"'''N . . 9%Y«" ` .1 " : � - = _�i�C- �— _ o $ w II 7 s ®®I 4bdryylNg�ryyl I A 111�./af,.! Illlhf �t�tttt,� .,. O a J _ ® IV IVRIhu��`I iRAW 11 -- -- - �1 .. �'® l II . #{i t... �p J� ��N2�S �___ 8 -i_ � _- n�.�_ � /� _ IT-- LFIA.'9�EP r: &{.a_• r�_�w.-:� ,��i���+rF�� ° �� -.:f_—.�..__'__ n. . - ..�+��. � � -- - � f rrr.�: a.:i c. _ _— _ ;�•� _ �:�- '" ___ �_`+�' i!I IIIIIIIIIII�1 ")u III II T��,�� —_ ��4r+.,_aa_v� ._ '^-. � ���"y.� �d'S}�F�iliFff _ ,_��r�� --_ � -- - '�� ff _ al�1 O I � �I1'IIIII11i1111UiAII 111111 II 'vG .�T^ .T. - ... 11 7 S/� S4YiILf" ��.-. L = -__ III�I�I II IIIII 11�1— CSS .�.. x:�:.! � � Ka �R� ' w w O = / �u„ -_ ii�^•_.,.r_s� ss:� ,>. . _�,1� '.� _� -... re.an. .a' :, ���. .�LSs,��'= -S?S-Z"= TLT2�?�ZT-��"-..,:,.Q :�''rSr�� _ H O � �14��11 IIVI �`- z Ln ��— -- -- %i �%/r%/¢I■{II{II IIII\1\F\0`�\�!__- F���/�7fas'�.�sia•�:i� -�Z' �=r E�3...� �Ir�;,,^� .. _ �Si;•�T�___�;+R..e.��_ _ __ �.' N o2 + , r,;:le1lx111,1, a\;;a���rr ==s_'.,_': I' -- —ate-.' ` <�3 � LO .': , , ,..\u•.: �m ,. '��. 1,'-; —,. ^ '`,'.'' /^'3 = ���5�_ -_ ,.1.};«„I�'� , •_ J _ - _— = UJ M wimffr U/��I/�.�N Ill11ll,l\\.,e1J// �- :�1/l/' . ri Fw q - �../�/�;-- - &'hp/ill SI/I11111111\�;;irr/ �_"_`_ i ._ ram-,. '«w .,,r a-�' �"'' I�q F - - .. — .c. - - fiP � 'aeBA"dkjSB a -.���_ — �� _` � �� , ,.. .,/,/ „IRS , I �_ � � an;dersRe �•g ..�•�� - -- - ���- �1�1+{; �� �,,� �� � //ry----- ).,. ��� m.worsen 10r _� _ it • _-• �I' •- --I ;;7i!!��� !1 ' � «vway. —6 rig �. � /� ,v` 654 „ � II,y� Via„ - a' -' '� l I �7 "� �, A1wA I..�I/Ii..f ._ _ � � yi %/,•ir7 �1��/� :I ': �� " � it _ ... � ® .� /��ir i�%/.//.! �,�''�--� � .�Flwlwl� _�m.�z_.-���wiriras��.r���w. g � I 2 \ , j�ll1!, /..:..T_.--,� .,.vn'=- �, 'b9��I�G9�l •. " _ _ L —/ / �!_t+►/-,rwlw. __..,wEF '17 INSET V q4 ���� �:E II�r. �. .7��,,,,,... .I� ., ,«I ,«•.,. -' .. <M _ • ! ititi= ����i��►tdi.�� 7� ��7 ~ \_'' .. /, r 1`��I� _ ' � 4 s:� .i 4i�f/ orhs rf +i \: ■ 7 �. a_.aig Nnr�i _ m Iv .��: � /I y/%�/ ////// .��ilikko row". 2,44 4I!regvrezt ':' �,==��/� ��� i ~� � y 17N �'�� ��� i is/ ii ��1F�,, I/ Vry /�� 7�. r- �ii�%%� � � .�� �I ul w� i 'IAA?! y I ~ //t1� I4 L. +* ���/.01///r _H.� � .-tomw'__-; � �l���! -�< _ .��!�—�ti.� �d�tiMINI ; 7 ' -�-: - 1INI ,., ,f.i/fl•,d.. l am i -�.i/ „IUUIC[KIIFr —ems.— lam �— /III /V 0w I� `, �I�n '4 � ": v,, ri �i�- a1 ' •ale;' ��y` )1 / ��Iy�til� ^m ev,.. ��1y�/�rIr• a ,--'! .ff._.--- ✓ t :\� �I ` � �%/%%�E�_�i��r:'i ��_► .r � L/ 44 // 1 a` --' ULVERTS TO BE REMOVED Illti v ' - �..4 ',, g ii ll� , / ���'I/I7 /SSA La ..1\�`�Y�1\!�_ 0 �� 4g�4i�i / //,f ( rd. :vlGlitr <Y `*jre:I tGj////O/iii ���a/ !,� %41. /.% i /...� ;r, + /�%� ! � //o�� TEMPORARY SURFACE WATER �' �i .•� !� .' i'r'.Arr".,� �F��"I.• `�"R f, , 1�,�,��� � ,�-. 01,111,1„,,„., IMPACT / �� : �e I r .. w� / /�� DENOTES IMPACTS IN iiii.„„,,, a ly �� ��+"� ��� • .. �.: 1141111?:-' ,, +� :/� yi efill � I�Ai,��� SURFACEWATER�� J�- 1 - Yr �i/ r ��I I�� f� 1 DENOTES TEMPORARY 17 - �� .� �/'�; • /Y/� DENOTES FILL IN ��.I � �� �� /y� �� ��� IMPACTS IN SURFACE WATER ., « ' WETLAND S 7/144101.11 i zs us z �� ��� f II ��' J DENOTES HAND AA r4 O ■ II■■ ,,,�.1��i�'R'L �. ..+�6�' �' ✓ � CLEARING �Ary �� ' / IGRAPHIC SCALE-INSET S. `6 DENOTESMECHANIZED �� � � ����'t 444 ,44.,r ili 170,,,,4r . ..*. CLEARING7// � / ///// DENOTES IMPACTS IN / U�/���/ \ , , yiii,.../ I� I .[ �' / SURFACE WATER EE-- a • \,/ r«« ' 1 �7/y/ DENOTES TEMPORARY /y r r 00 1� ��/ /.'� � '/// IMPACTS IN SURFACE WATER h., �I ��� �� I N X SI , 1001 Morehead Square Dr., PROJECT REFERENCE NO. SHEET NO. Suite 610, Charlotte, NC 28203 /-38/9B //A NC LIC NO.F-0165 RAY SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER TEMPORARY IMPACTS IN SURFACE WATER rSH / '* Lk * )ETAIL 27 �.t t ♦•A . C NNEL BLOCK \ DOCUMENT NOT CONSIDERED FINAL / SE DETAIL 65 \ UNLESS ALL SIGNATURES COMPLETED i c(,,I, _ . ) t ' 4" ♦.►. , � CHANNEL CH W/ `1�•,014�,�"� T: ' BERm8CL10 2 RIP'.' A *Ieor/;**./.r/ir* /*4*t' _-___-__-o__h____4_.4_4__,,....,3--.:4i.r."1„7al"Zs0,.-4tL__r:..-",,-,0,-'1,-.-..,04.1.44#,4.4.14.!,4."„4„-.A440..4,,.„s-1„...4.4.„,..k„e.;..':,t-..i.-r".:.#;,\#F0,-,,1--,,.,,,.,i444,04..-e.,.. PA�iVO`� '..►A♦�.�������.�%�iT�i•"► • 7E E DETAIL12,4,��?..1, ����2��0 zip�4,..,. �'• +1nIK \ 4* `Z�,Z solitS �• T a 44 CHANNEL CHANGE ,,'A !���,Urf-ir tt-4 4 `mot ����•p�a• : , 40 (Typ) %dip _________ .40 1- 11 ,0Wt.-41-1"- ilk A Lo �` �� '"', VA "3 SITE #9 , ,_F--...... .E--- �:��.. ,.,� ��� 2GI \ I/��ii�•a�v��� � 2GI �. � = pel N .4�lG T'�.-lik a 50.1 �- 1 RCP-IV ,y� ARV _ _ li 3af«, 7// PI C i� •y` `-�' fSITE #9 �. <�SEDLE�TA��TIel? ` 50:1 �t a :� �Yil=T. TOE PROTECTIONK1T 1' p �;� 1/�I�,(WITH CLA IPRAP V _ _ " r ' ` ,* IOU141. SYaz ti. �ti .E SEE DETA �\J •' ', y�*'�yTAIL 4' B EDITCH��r� F 1. ::r;::�s.,.,.,..,,. CHANNEL BLOCK �.,,,"" �� ASS B RIPRAP �� �Q�EI *SEEDIL 11 �` 01 ,,. SEE DETAIL 65 /01� j' • co CHANNEL CHANGE w/ \c I ��_:�.����� III / \ //....- \ �� 4101r:allifte' a VL _ — �Ei��� 1, 1i.1� ///i' SURFACE WATER F41011WWW, ///✓ DENOTES TEMPORARY \\ero \ 0 l� !, ;-?k.� N \\ IMPACTS IN SURFACE WATER r WETLAND �� \ �Z „ice F `�� F 6' CONC ,�_, (-0 DENOTES FILL IN r� \ �.� wt• - ��_lrs..���s---mr,'w���Ziw �q="z lam$ ►� F .cn.Je�fO■�:i///�yia.`��Et:�i�•�y' N L-BLOCK 7-14'''.44111,471,i�••••tiyyyrrr��������...�rr �����/1_//�lliiill/�i.��l���li:��/1ti111�1.:ii��i:���'y:►�/ify��' C y�%:d DENOTES MECHANIZED ����ti�11�11T1T1T1������71i11y �E/ii�' lil��llA�ii���������/Kdl��%����?�111�:iiEEE/�7tiiy��-'= E E A �/ . IYIIa is•= _I����I�I iTrTrT�gii"'... f' - '�. ��- �Ti►-etib'- �� rnmr NIAI �`��Fl-T �r� t + + r + CLEARING 0 N 7 C O 0 N O a SITE #12 i 50 25 0 50 100 o� GRAPHIC SCALE - INSETS ot �O_, Na0 \,:0 20_o N X S I , 1001 Morehead Square Dr., PROJECT REFERENCE NO SHEET NO. Suite 610, Charlotte, NC 28203 /-3819B //A NC LIC NO.F-0165 RAY SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER TEMPORARY IMPACTS IN SURFACE WATER r$H rETAIL 2 .: C BLOCPc DOCUMENT NOT CONSIDERED FINAL ''i' ,e SE DETA 651 II • '4 -.410. 4,11‘. , irk, lk. _., UNLESS ALL SIGNATURES COMPLETED fe Se ' 13141.°IrAPI:044,4 *.':° wiOgg0.4 .....__4 I D Ise., , z , . ..dd let. *** ,,A'' 4:14 E:04,044747V•ivw.4- 4AVIPAr 1,44„ i„ '"Iii.:10:04-1004.4444,174411)11111111111111111111111.110161111111111111111111111X1111141Wirl ' TII"Fs i 0,410 V*a P 4.1•4,011...,._...-'411641.44441#14014.44170,46P-WIVII.1111111111111111.11L11.11111111 tt$ - AOT->iglie ---..-4.----,\--47.14-4,0114#041:004414.0..-r.....080 gatio ,fr It A •.* ,e,,,,e , .,,,,,,,,.,,,,,,,.,„..,,,,,,,„.,„.,,,„:„.„,,,z0,44,....,„,,_,,....,...„_,.., 4,1 /to ,A, 000,00 ,..„., .....it,,,,,,,,,.,, ..„.„„„,„„,, ....a.„-p,„-..-„,....,....„-it".„..„--,4„.._,,, _ __ , .,,4* . .:0"44,40461 WK ��q�t Ow-p�°i.A1�•. a�c► ♦ ? A IA- 054.t1 -...... ..,,,-,v-‘,..",,,,•......towee,04,,,-..„:"....41410 • A ',qv& .. 1 , N , ' ----wicivorm 4,4,004.100-.,"44.4014v1., alp 9 4 III * �_o� .'� - jAPI**-A0Viti � _ it • �� iflt, eir, Ilir/ a 0� �� ���`'�� �► ,��", .� liii ill _- -- '771 0 SITE #9 --.:----4-----"41116100104011 - 1 • _. /41- Imo-_ ! ' `� ��T11-•1 ���1��� 1� . , 0 IPIP*6'%-. '''''4,iSZia lir- ..fik t t 11117.71; ' IN, -NI - .11.- ----_____•700:,,.., --.40. ../...11Nimmor.m..7--- Al Aigliffiar, ,, Arlelirlir4t 400v co 0,` S 1;' 10,% 1,* , -... Jost 1 6 ,e,, 4 T. il WK '11:"/' ` 1�• �, *� -Lk, HANNEL BLOCK": AR, A ��. 4 11111 t%6 ,64*4441.1."#N1 ?'L ' WA( ..AV • ic:: �/, •; i'' SEE DETAIL E '' _ ., . ' ' ��' �J� / . III /��� �I - � r „ 2 *41,111CHANNEL CHANGE w ti 7� '' +^ y- I��6L rb=�'�� =; r ili � SL 5 BASE & CL 2 RIP' . ,�' �ti titi1����- / DEROTEE WA ERTS I N \ ` �a.-.,„.....-..... 4 ~ It �` �� j�//i DENOTES TEMPORARY � � `� ON %" IMPACTS IN SURFACE WATER ero �x c coN \ h4' �, ,��L �� •\i-W '` _. , --. _i. r //� DENOTES FILL IN -.2 „� �3tOopai�ip ..,, .—.� - s . O0 y�' WETLAND i \ \ �c.*e t • • ►r�Rtit, Y/I/I�- - \ly�:f�� l� -'v 4�:`igyt•Ip., " • '. 7�7titiyy iyyl%%%%%%%%%:Ellli pl%% /%%%%l�l__%�l►s%i !SIE�PPi!I/%%111i iiillfL`r�•�'�y �ao%•��m� t a}tr . '_.•�c�a a... * • < * DENOTES MECHANIZED ji yilyyymite%% ia1iioIIsU!1 irtiiauir-. IiuI►•%111i IEff /I%�li w' -Q j�!]al I_I�[i.. - ---- �'. �� ��I _1 1%%%% ilmltlll� v �.10. 1 .-� — - il�i F� * * * * CLEARING y _ �� --.. -� tit_ A r n N r I A , � -���r ,._,,. — U N 4, C E U N a SITE #12 11 /: 50 25 0 50 100 ■ . ■ ■ i o� GRAPHIC SCALE - INSETS O_, N a ". U 2 U_o , PROJECT REFERENCE NO. SHEET NO. N X N I ) 1001 Morehead Square Dr. ite 610, Charlotte, NC 28203 /-38/9B //B NC LIC NO.F-0165 RAY SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER L *,%/• / DETAIL 71 i SK( . CHANNEL REPLACING EX. CULVERT co (Not to Scale) .. I ems. ' �� CHANNEL CH W/ �1.�13-25' S 17-23' I;/I DOCUMENT NOT CONSIDERED FINAL 10' BERM & CL 2 RIP',c_, �� �P at 1"/Ft• .S, 1 ' . CLASS II RIPRAP UNLESS ALL SIGNATURES COMPLETED SEE DETAIL 12 N.- W I �5' at 1 /Ft. SLOPE PROTECTION CLASS II RIPRAP TO EL. 797.0 �� �� III //' ,, ON BANKS ��� GEOTEXTILE CLASS II RIPRAP 10 ON BANKS ONLY / 011 ,041 Or CLASS 2 RIP RAP � � EMBEDDED ON BOTTOM AT EMBANKME \� >c.� NO GEOTEXTILE • �� 7)t -L- STA. 149+36 ► EE DETAIL, { DETAIL 13 1:440,7:ititrirtimilt,":44:14,4itiszortzt:r.rtera,aii., - �' r3� RIPRAPATEMBANKMENT : ♦����p�'p' TEMPORARY BRIDGE (30') (Not to Scale) ��t�i��s��:�ci�Z�,., �.�e�.�� .� TO B E USED 1 o'min. �c,„ ,,, ���tL ,�� �� DURING CONSTRUCTION �Z Ditch ��� O'min. 2' ���Z����i�:104:7:4710:7:400,:s.4.tro.:77:S774EIE4DNITt,;Atill,::\ �!d�� Z'��i�ii��� CL B RIP RAP ll A � ����,v� ��'� �����\ /c., �I-� 3 TON 11 SY Grade 7t 7 . ITE #10 z•�.�•;~� � SITE #11 H Z�i� F h F ��i►���Y�����4I ray GEOTEXTILE — — F o O _ — — �!s►.��z�! :a WAN '���Ij���1fj� �F��/A Type of Liner- Class 2 Rip-Rap 2GI 2GI / tifolits. ' 40\ AI I �. IF,F- /so: �_ P-Iv / Ma ir '4 %�Yte.:10 0 '414:0:6. /?/�/IY�-II I3 M L� _/,.)'��_�I_l/ �� 1H" UXCOMPAGTED /� I --_ — 1 RCP-III / DETAIL 65 NEW6XALLTBE"TRFATED S'Min. 1BACKFILo FINISH SGRPOE � _� 1� �'��,I�� ����''����I �� _ F( AS SPELIFIED IN PLANS I ��? �/ , EX xD CHANNEL BxopK � � �/ 50: P / MINE F 2.0'BE INVERT FLOW .'_ .' � .��~.��~.If /,,,I'll'. �� \` // OF EXISTING CHANNEL :i::''�':�''' j ���/ I-IWI Y �,�/'.� , CHANNEL "Al '`�''�,�,' ��/�//��/� ' INVERT ' �'' -.. titi tar ����®A o � COMPACTED �Ri����.��3� ..�d► tiCOMPAtTEo BACKFILL ��� �''�~�Y'��,',��� ��� ������~�~�I I �� LENGTX1,10110, N MfiT STONE EPTX SECTION A-A el 1. RI CHANNEL BLOCK �• V S �/ T. SEE DETAIL 65 -y�/ �� �,� ANNEL : OCK " "1 F BABKFILLIOWA B^GKFILL NOTES1 EXISTING p. 1)CHANNEL BLOCK SHALL BF INSTALLED IN ACCORDANCE WITH THE - COMPACTED CHANNEL PROJECT SPECIFICATIONS. In =L CHANGE w/ V in rb"� " DETAIL 65 '4*HI \ E INTERF TNEEN E%ISTING 3)BLOCx SHOULD BF INSTALLED AT TN ACE BE ��/� CXAxxFL ANO PROPOSED CHANNEL. �� 1 /I%1 it #_ Y'1 ti-P 1.11��..1' END CHANNEL BLOCK t� & CL 2 RIPRAP --- ---• M O)BOTTOM OF BLOCK ENOULO BE A MINIMUM'BEYOND BELOW THE INVERT xa XIP'PIFI:IIPBIIFIIXI•IIIXFIIXFiP`•I�.I��Ir,:NI'TIIIP••111 MIN BLOCKOF TxE Ex[STING CHANNEL. ��4.��,� �'%/�/,�. y PA 1 INXI11 P'1��I�i PE I�'I Ij IN.OF O'BEYOND LIMITS SECTION B-B W)EXIST SHOULD EXTEND A MINIMUM OF 3.0'BEYOND THE LIMITS OF THE m _ •/• ,� '�" ' ' �,' REMO HW -*gap LP,FLIS�.IXIIP:••F•FlP FP•P ACCES T� OF EXISTING CHANNEL PLAN VIEW WITH 11 EXISTING GTPEAM CHANNEL. ti 11111111111111 1 1• �� fi)INSTALL EROS[ON CONTROL MATTING ANO SEED IN ACCORDANCE WICHANNEL BLOCK 6)COMPACTJBACKFILLITOCE%TENT POSSIBLEEOR ATTTNE DIRECTION OF CL t LOAD NOT TO SCALE THE ENGINEER. F ' CHANN 'EPLACING SEI Q ON y 5tfr BOX CULL ' 6 I CONC 0 •SSFII RIPRAP . '�'�►L �r� ='���•1� ►ir `�► ' O AIL 71 11 M •i �» i�b�NY/ t�r�,ti' a.J�i9�Pa11~i�Tr1 ��� 2� a i. . : . . L M , DENOTES IMPACTS IN SURFACE WATER y jT/y/ SITE # I4 ///i�� DENOTES TEMPORARY IMPACTS IN SURFACE WATER Y SITE #12 0) //� DENOTES FILL IN ND * * * DENOTES MECHANIZED TEMPORARY IMPACTS IN •'_'*' CLEARING SURFACE WATER a i 0 o 50 _ 25 _ _ 0 50 100 11 0�3 0,0 a, o GRAPHIC SCALE - INSETS 2-o " N I 1001 Morehead Square Dr., PROJECT REFERENCE NO. SHEET NO. Suite 610, Charlotte, NC 28203 38/9B //B NC LIC NO.F-0165 RAY SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER • DETAIL 71 mh �/� / / �� CHANNEL REPLACING EX. CULVERT ti m.,m m (Not to Scale) ille: �. J e► I I:0, / L`N C ��►�13-25' 5 17-23T I�� DOCUMENT NOT CONSIDERED FINAL �� CLASS II RIPRAP UNLESS ALL SIGNATURES COMPLETED ��`�' w 2 at 1 /Ft. �S•1 y1 at 1"/Ft. SLOPE PROTECTION • �� 1 .- / 4 ON SBANKSRAP TO EL. 797.0 t ✓ �<—> - GEOTEXTILE �liffirlir��� W ' CLASS II RIPRAP 10' ON BANKS ONLY 4 RI' EMBEDDED ON BOTTOM `/ /. ' w N I/ '., 9 NO GEOTEXTILE " `/ f -L- STA. 149+36 r►A • ;�� ►��a' ** .� E ►►E �;� I , DETAIL 13 410; :�.`%iZ. :.-r s � /�i'i4'1,� RIP RAP No EMBANKMENT ������T��•�� ��'►�i��q�h��•'����� ;/� � I tori US 0 �4�i. °Ay6�p����•ay�'d�n��d ����•i t♦ Ditch �� r _. P P' �►1��W�i�9•t.��!i�p�p�lebt • ►i ►sQ$�i♦ // " CL : RIP RAP 1.0'minilialp . 2, e W • ig ` , �. •�3��:":1*' ���iellt4'�i�.. l 1�� 3 •N 11 SY Grade 44t7Nit,A,N....s.,,A,F _ SITE #11 Z � � GEOTEXTILE _ ��► .10140111(' WAN Fi aw,fr �00.#0 �f ' w� �f.4�51 , Type of Liner= Class 2 Rip-Rap 7,r4dOligi 40,41 e.- „A.1PP • II P"pi I I i i ill I kV ..° ''11',. . 4,46. viteati, ,e/ "4411,11ddier 4 41,1w—, ..—=. !__„_.7-4_41.-0;.e____ __________,- ,e,_.40141111114i__,,1 firStirsitsi 4 ' t ' .01 ,. _ ( F\ / DETAIL 65 NEW sTREAMBnxK BACKFI TED s, —� -_-/��/I �'-' , � ����mi �I 4- ,_ SHALL BE TREATED B'Min. 1' 10' FINISH GRPOE ��j,���'��,I // .��?-� '~� -� I \yf� EX AS SPECIFIED IN PLANS /�-//I 4 �, ---- \ %" x0 GNANNEL B Nr M� � ar, ~ ~ ` • , \\ P // OF EXISTINGCHANNEL INVERT FLOW �^ Ialre MA.4.:. kiklIP4rAr mpm. „,41. ,� tit CHANNEL �,I INVERT ..,,„..,-- op.....4",„ �7/ ill ! coMPAcreD MPACTED Alltillpti.11.41-Far 7mam" t i aiif ,,. � , BAGKFaLp �u66Ai `MGKFILL�171■• —� MINLo'DEPTH SECTION A-A1/A,IK -� er - MIN. WST GTDNE�� - • B \ �I -� �-� LENGTH i� � .ES 0BACKFILL HANNEL BLOCK 01 �' � itattillti � ` ? I At I A NEL : OCK�� ' I SACKFUL T. SEE DETAIL �• / A.0 i / �� Y�~��~' CHANNEL \ p• BACKFILL N COMPACTED �)TCXANNEL BLOCK SNALL BF INGTALLFO IN ACCORDANCE WITH THE ��1/' ~I��� 1 ♦ PROJECT SPECIFICATIONS. Y _ j / _ 1)BLOCx SHOULD BF INSTALLED AT THE INTERFACE BETWEEN E%ISTING ��'� ���� •� D, AIL 65 I CXAxxEL qN0 PROPOSED GNANNEL. T7 I CHANGE W � � gl,-1-i tr _,1��% '�/ .;P 3)BOTTOM OF BLOCK SHOULD BE A MINIMUM OF 2.0'BELOW THE INVERT i1 v - �/� P,P I L HP pi EXTEND CHANNEL BLOCK t� OF TxE Ex[STING CHANNEL. & CL 2 RIP' P � �--•, � ••, `� / '�'�,., ..... r / R BiP F 4N •E MIN.OF 3'BEYOXO LIMIT9 SECTION B-B 6)BLOCK SHOULD E%TV A MINIMUM OF 3.0'BEYOND THE LIMITS OF TIE lailag`ifil�► 9f REMO ' HW -s__ ,F,,�LP /�� �!�;. I;,� ti "l�//�.GA�y, � / E,P P ,F►07,9�R' �p��P��T OF E%IBTING CHANNEL PLAN VIEW INSTALLG EROSION CHANNEL. 7 r. fi)INSTALL En05[ON CONTROL MATTING AND SEED IN ACCORDANCE WITH �► W CHANNEL BLOCK .)coMPACTTHE JBACKFILLECT ITO`EXTENT POSSIBLE ATIONS EOR ATLY TTNE DIRECTION OF AD a `Ij� r•• ' NOT TO SCALE THE ENGINEER. / • CHAN 'EPLA -9, _ 6' CONC I M -.." ....,,-.04......,..„1-ileo-ai.„...........__ _.----zi_ Art. c90, . cr M DENOTESSURFACE WATER IMPACTS IN /// 7 jT/y/ / SITE # I4 ///i��// DENOTES TEMPORARY Y IMPACTS IN SURFACE WATER a) SITE #12 //� DENOTES FILL IN * * * DENOTES MECHANIZED ND o TEMPORARY IMPACTS IN •'_'*' CLEARING SURFACE WATER a i m 50 25 0 50 100 II o� �oa, o GRAPHIC SCALE - INSETS 2-o L 98 "S I ` PROJECT REFERENCE NO. SHEET NO. I ]00] Morehead Square Dr., q 0 PIPE OUTLET CHANNEL Suite 610, Charlotte, NC 28203 & MA. STABILIZATION SO /-38/98 /5 PIPE OUTLET CHANINELL STABILIZATION NC LIC NO.F-0165 IRREVOCABLE LIVINOA RUE LL �E SEE•DETAILIR9:, C R�.-° O RAN SHEET NO. e ROADWAY DESIGN HYDRAULICS eiewl°° /J(/// 27 NS SExIssIN ENGINEER ENGINEER ///// Illit loot. • 42"RCP II�ro a DENOTES TEMPORARY 101 p jGB wMH '" IMPACTS IN SURFACE WATER �,:$�,��_�� I Cb°nnel Bed -e Length= 10 F. IV°nablel /�/ I�/ ,.�L;°.._ �LIRR�eR_Keyed-In±SS Lw Geo....) DENOTES IMPACTS IN S '- — �'���I�6y�l -Y15RP8-STA.24+00 LT 1: / �. f/ ; SURFACE WATER / ��� /��/ RETAIN I.�,;1'`" �1 ,s"-'-,� RED' // zra� ///i //F .. � `^' � /%/ p3 �1i-_ 6.MTL t* / /�/ /�/ -F-" J. DONALD CONE 5 ;ua•.• / / / _ < JB DOCUMENT NOT CONSIDERED FINAL EXIST.FENCE � � / /% / o/V V _ 3.4-L- /j/ 36"CSP UNLESS ALL SIGNATURES COMPLETED • / // C • p s- 36"RC'-II RETAIN ;.s i/ �// 240'� // _ /-,&� 100 ExISPNG-//����_• I!K p� �O++V�/// /%/ / � sepses � B wMH •�' H s� i�// co / /Z���Zp/4 / ,` Ex�srNG a/`".__-arm / \ ////I //// C / /' i. in% \ uut. ._ Z �' • .•. -' / 2GI-D / / � /,., qg•wW-�s�.m. 18"RCP-III / / // � �'// / /.. + / /// //// I C / nc - - - I.. \ � 0 e//� �+p0'� t / //�/ I a J"'� •D WB RECONSTRUCTION £ JB vrMH / t // Ww gpMP 2 � -- e:nu ° e TIE PO EXIST-. BRIDGE Wg C e"'- L C S 219+5598 q6 40 C n' TRENCHLESS INSTALLATION F OG �F I- 1 S �(; .fFiy _ e r•s•'- / 3'BASE SPECIAL CUT DITCH 36"WELDED STEEL It - \ WV � ,I I -`' E � 111 15+00 3333' .:� ie.- I E'CLASS E DTAIB 43RAP MTI- / 'yt 8 RCP' 'CYP. ury I REMOVE • . _/ e ", -,F '•>% OVE 1 �e. I MTL MiL y,,�I CONC BRIDGE �/ N O• fie$.E� � '.'5$'_ ._ CHL FENCE 8:7 a �� �, a m I '��I __� 220+f it\'� RR '�' `� I CON D nI�_ = W Z rig- i�� «�rao WB 36 __ ., / 111 33.33' �I REMOVE GREU TL'j 8:1 N=��TJI`rV '�_ / 1B vuMH I ._,- --, �i r PE ,', (n 219+27.63 �qt I IC ii:lawooNINFONO womer I1 —__N _- -_-- a—f ~ — f _w.m. ` N C/ /J I _ �T L nom w ___-,-�_-- RETAIN 8 LINE�" m _' CGAIPI pP. I�TYPE II1 'PS / J N �Y ii _— _—_ -- - __-___-- -o> I��I5+OO C......�e��s„' E_ s f -TL 1��"'• // / N _ "t _-—_---- _ TA • - __ �IsL m e�f�f f............ f---� -4—�8:1 END CONC. 9I•�� N P___ �sw•1'G�1el9� -� j-40.B'-Z7'L7NC. •ROACH SLAB ,IIW """ - O W REMOVE Z -2GI M �__„-O �� _ ��g - REMOVE _ -' — — _ — _ _ _Tr ,. �1i W 8518+QPSe s Q -_ / //4 �� 2 91 , :�caa�••e� a -� Tll7 —0 0—e— t� f J f 2GI-- — - -- 1 / ��F N Q. h>» 95' L � O REMOVE p !E 24'RCP- _----_____--- -- or END FEB RECONSTRUCTION INLET A IPES � a +. l5"11RCPV- ;� ------ --- END MED.BAR. = 2 IO l REMOVE F',Mnl �/ �f tn --- _--- - f FS END APPROACH SLAB / J � - - -- TIE TO EXIST.BRIDGE '� ym pp 0 I ��IN O I —, C C -L-POC STA.219+28.51 \ %/ // / • O�1p = 1-40 EB RAMP/9'BST / C 0 6 _ C 13„RCPy�/// / Q. e f - ---- v i y C CC SPECIAL CUT DITCH "CSP •/ // O 8:� 1 - F- __SF C W/HINGE 'o-'CL B R P JB r �l /p• (I� �,/1 /I CAT 1 (NP) -s REMOVE � ��- --_ \ \ SEE DETAIL 45 2 TONS 7 SYy�` I RETAIN �/ ",ci 1 *fJ12G1-:,F�� a QCJ 'Y/,5_R/��'- , Wai \ I ty OEP I .�"' �/ / //I W __ £ ° ° ° a fop 2GI o� `` _ j s// '/ /l Z (V - - - - - -� — 15"R�"m \lam O l J e c C e �� .. lNv,gg924 �\� l \ C 16 l/ / I RETAIN & LINE _ e ' �q�j� REM•s- EBR \ I \ \ C ill / I 2 U e 5•, sl BERM 'V'DITCH ��� - T ; - i A / / "ETAIL 42 \ \ Ca L w I PROP.CHL FENC REMOVE --��1- -� m ��_ V C / // / / m WJ R�� _ISO' c rs,,,.r_ _4 '� --. v v / ill �l / // . Z TURnf . BD. '� \k -v 1/1 - tip_` \ \ \ / SITE #28 INSETI � C / ��E �, h 3 / /// /I\ // J��� 2 J �\ , INv_88I.9,_ lN� \\\\ + 0' REMOVE r �, - 8gr.3 \\_ `OX; / /f G// a -_ GI/`�ff \ OVF a� \ry 24"RGP-III 2GI-D BIv 359/ l / //r1 /ffq •/V JI.FO JI PIPE OUTLET CHANNEL SO . , 3 k�O�TRE � � 11 �� �� ��� � �� STABILIZATION :„.,4 C REMOVE o ;/ Q' fqs^MN4c�^'r Imo_.' C \ O / i/ V3V RETAIN dry" M SEE DETAIL 98/ CCU P . , , MEN ,� Q GI i M � . 11 WW .q r� id \ . a * 1 RI sr‘vo �> I t..f j,ss LLAR\ /' / / ,e: 2 7 N S - S szING Q/w ��, //�x' ��'��"' — TEMPORARY SURFACE WATER .`* � ��P �� � J� ��- 1 TO .IST.FiNC / / / /q•/ / // ;\ '): j 9� 42" IMPACT --,-9'3 b . k / III l 77 �.: 3 ► RCP—III / , / /�;/ �0k / / a 1 a inn '� �8 JB w/MH ; ; k/ ,ll l l�;ll ; :: �— �ii V �� � l / l/ Op = ° / / /// /. . . N�.' � ii �� 25 12.5 0` 25 50 k / // / gall / — / • � • � � I 1 . / // ,/ / /// \\ o: 1 / �� GRAPHIC SCALE — INSET k / 0 "� ` r PROJECT REFERENCE NO. SHEET NO. I ]Oe Morehead Square Dr., 7� ��� I Suire 610, Charlotte, NC 28203 c PIP A j \' �'ll� /-38/9B /5 DETAIL 98 - ILIZATI 1 PIPE OUTLET CHANNEL STABILIZATION NC LIC NO.F-0165 A6 L. 1 IIIj LE SEE DETAIL A 1, � � RAN SHEET NO. I N.n.soe1.1 Nmunl sed w' +�,'Ms' Llldl�����.,%� Elemeon ROADWAY DESIGN HYDRAULICS GNo��I GmeAl / //, i ENGINEER ENGINEER .pond / .(/ ` ,..01.?:-f:.•`' all DENOTES TEMPORARY(_��.�� 1.25' 7C i IMPACTS IN SURFACE WATER CFonn I Bed '�"��l C I C�W Length- 10 f1. Io24 R . /" `�� I,�/[��E II Type of Liner- CL 1 4-Rop Keyed-In(No Gewenile7 Y15RP8-STA.24+00 LT DENOTES IMPACTS IN pr , �t- / ,./ � SURFACE WATER �,� - e I Sly / ILI % e i j��E��J / /��./ a�L R ab �,a ;aia.. S FE CE "• _ DOCUMENT NOT CONSIDERED FINAL � -/ V - '� ♦ _ 1i UNLESS ALL SIGNATURES COMPLETED K >«r _ o, _fir :i.e....... ,� .e � , III 1 f, ) A 19 ,_/a�'4* m'_" ". '� 'G r - IVY, r iiiA /•/� 2 a_ _�rtiel+s-•ice i�`Tu � � ii =F' -min._ / .i� it row 1\ � ©1�' r Z 40 "...: / ��Pb b�7! "F,. ��c icy EA17��\16Y��/ JK = ._� ! InL . � - ,TaA7w.77I L7d�= ���-� G LL -. ycL+m _ark W40r154404111 O/ - +� • �"� ®� . REM - 1 /// �)/ V.c c r.=� __ D CONCTAO i' W1B RCP - __ � IIII II'� � 1III � .. - 140 wg 36'CONG LA� I� 11W _ y �r�f�L�.L�L-- _ SA.„„p I _a� ram` I15+00 ABLL_If�.L�L — T _ — �/"tl %r. Ier��� • —� - •'' C_ - END CONR'. o �•• / !-• .. -- —L_L�L�. 1 L . �.� I-40 t,„_ 'CONC OACH SLAB II''1�%�11y.:' //////1� 0Wr � REMOVE ��.�w+.�"L��1� L - M� RE.N 21B+ __i ��W ' _ove ' ..ice Yt� — •�j— _�,�� ,����I�' tL{��a zGiLN RCP Iv L =: L ' _ , (�,,,_ 15"r1RCP IV' aS'r�' 2 CP-1.�� REMO pre A �/Imow. fir' + � .J.: Zi , AO , 0 O �.ww�ww�� _ CCI � '� S��"Q1,. �� l 40 EB RAMP/q Bn - --- il H1.✓� - PECIAL . DITC '_ L�ifts- - E v0eq Ft,0 in • Z Ir ' ��T ��-!-a� � SEED IL - 2 TO S RETA IN F..N,a s ••'�� ©iElt � `� \ \ /[rlu// e N 5�ill�15 - BE'.. N'.ITCH r�����t—. \. few '�.�a _ \ \ C \ 111.61.0" 04.04 n ., <r ,"A�' SEE .ETAIL2 =4.-_ '"` \ \ 441; W I PROP.CHL FENC REMOVE 4y - Itlic ® ` �\ , ,"�11 N Z SITE #28 INSETI _ //� �,���J >co — 1 ) / �� ��r�ir�_ \ ® �® + o. OVEjox�, d o�c, % , ) Si S 0 110"7"vairt...... .11 .1 il ,. PIP UTLET AN EL � •. �.•,\ _ 'f �; �`, �, i a � . 0.4 * ,;110 I R I PA: IV 0 :. ,�� ;EMOVE co M SEE DETAIL 9 8_ �,' li `� �I \IC::: ' 1111 =EMEr Q"f::-'1*- �� V `� a - 4 21610116111111111111411rA P141. \\ Ntgli." 'W 2 7 r S S NGe'W Qa �..�h y TEMPORARY SURFACE WATER VI, �� y Hw . I ro ,Isr. �)-4/, ,; RjA� ��� IMPACT `" '.'b ` y *,1 1 1I ,1,1 1 ., p I „<i, . I III I 10 %/� r I�x x� • poi Nan V`� 25 12.5 0 25 50ior / /? ',a� _ ' GRAPHIC SCALE — INSET ' , // �� w°\)\ V I I PROJECT REFERENCE NO. SHEET NO. \ INSETI 1001 Morehead Square Dr„ Suite 610, Charlotte, NC 28203 /-38/9B /7 NC LIC NO,F-0165 RWV SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER / PIACEMENT DEPTH' DETAIL 101 CL R-30° l— (No Geo...10 OUTLET CHANNEL STABILIZATION )♦D NAD 8395 {Not to Scale) NC NG fLOODPWN BENCH NG JB w/MH / cor SW Tiiii IllfCL II RIPRAP ` .17. ON BANKS 50 25 0 50 100 CON BANKS ��r� 1 CL'II'RIPRAP v✓ � \ J B w/M H �� -—f NATIVE MATIDS . li Q/A ;Eli Fig: PACED ON TOP NATIVE MATERIAL �1 B' VARIES OR' O FILL VOIDS PLACED ON TOP TO BED) GRAPHIC SCALE DOCUMENT NOT CONSIDERED FINAL �.y TO Tam ` (oN BED( SLOPE FROM INVERT TO NATURAL BED AT APPROX.S% L UNLESS ALL SIGNATURES COMPLETED `V/ I1 lr• �/ SITE #19 -Y_S-STA.37+95 LT �— o �".�, CONC U £ P ,\�0 - - yyyy e°coNc cuRe cuRe = �111 / I pyyyyp�'��,,,����yy o' -0 J. J g`eo) G c /a# O �,_. r 1 '''yyy',yy'yyyyy DIOCESE NC o o B°coNc /1y11��41 %L .yyyy/.�.y/l�.//1. _ 25 12.5 0L 25 es ,s N -yj�fi.'iyi //1'�11N//N/IM//1/��y/I/i�•y 1 i m I _ esr a� " x '�+`2+Pam �yy o ,, o 1 ' �T B r GRAPHIC SCALE — INSET / o / DI s" � /® ee CO CO_ '''C'j' '2 C1 - BST �*'4 p m'`I O yy / \ THE MAN CATHOLIC *I** * IP NERGY - OO rr, A © A L� -q I /€} - DIOCES F CHARLOTTE, SBK DISSIP- O' SIN #2 \ z 31 V ;5161-IIOISE G -_ 1/ I ROMAN CATHOLIC DIOCESE / 69 �� .. HETppoSIPE S �ETAI��32 =Z z m 4 N�56A5 == OF CHARLOTTE, NC / 0•CGN� #; CATHOLIC CHURCH m NN AO 7' O OUTLET CHANNEL /^p r y \� M,% rip; OD I„� JSSE a ECTION STABILIZATION / P. SITE #17 w 720'IANE-PROP TAPER(LT) / c,Y ^,fl } p N I--' SEE DETAIL 31 RIPRAP SEE DETAIL 101 f1 O awo \\ D ** •E PROTECTI��. 1-, w- CL 3 RIP RAP \�y�al TT''77 I- W .PECI TERAL 439 TONS - I E Iv \ / \THf / ! {�. ? W :ASE DITCH 4 /i �I' n, /�° SEE DETAI J Weir in!� END /,ir,-i � NDp IP RAPT I ai a a Lr O W w'CLASS 1 RIPRAP SX s / - \ F Ils•.RIP RA' T �air� 1NOL_E�ALL SEE DET _ E "'` �i�r H/'07 , SEE SHEET_ _ 17A �C BEGOIN SF ,/ F TONS 5 SY I in a r �•�•S 5 S _ -- - �-.a...a - - -- ` = d. .•, dr.ni• A. Fliglial END EXP.GUT. ° b g< /'Ri' S N` DAB - - . .. B FB � J S1 ! g901 WALL W EARTH BERM �� ••RCED SOIL SLOPE _ _ .4 W _ . W �, � hs.. N c � k ' iat r////ni � ����. ''/BLW SLOPE D:TAIL�� ' C P REMOVE _ V•�E shaNI FC �1 • W F ? LLI alf aara _•. E",-� il; %' -.e._.;:.; 48'CHL GTD X X48'CHL y i .\ AND I��NME ..��DR@P BOX) 48'CM- P W N \ ----°•' 10Ly I',"' 75. OrliWi, 15"CSP REMOVE HW 2GI LAST JOINT ' OLLAR 315" CP IV N M a REMO "lam ,111011 \ TB 2GI 15' RCP-IV TB 2GI �:1 C.qF-O \t 77 + TB 2GI lill�' • • - - .,.."• E 8 __ _. _ N I j3 .��76 .24"�e•..•'� ,S _ _ — T >— __� --- — A.r 1 v I REMOVE LF ` - +05.3w 1B v/MH " COLLAR -- --- - - I — ^.�� ���. „� ':-- o , SITE #18 �1 REMOVE 2GI I_' - 15"RCP-III ,.�• 40400 L '- f99 -- O =,S P". ,"R�r�. -mod ; . 1 M7. - MT['—= - - %.• I _ = SEE SHEET 17A= O O O _N REMUVL 21,l ro — iv'to —1 a ro �.� Tr REMOVE 15"RCP-IV o. 0 O ~ ro - --- T// �_ - - ---- AO - e —REMOVE gEIAINP REMOVE CB ^Ei - 0 -- _ - .OVE HW ��' a�5�5�TBTB 2GI TB 2GI N� i W T T ',," -- ry �i III I MIIMIZIII �_YIT.17 1 C -i MTL .Y #WuuYY MTT Eriiiii _-..-u.ru..�MTL 6. CN of (� • .n� % �� 15"RCP-III - - -MAIM 'At �i �C I CHW W TIE TO CUT DITCH -', /� _ %I ✓.r_ cam\ m ( I CLASS LINE ERIPRAP 1 /F\ �e�JVV 4'CO rIC M E HW X sr F FP`P7l`��+ CONCR TE BEVEL F 300'LANE TAPER RT Vitam '�B" WITH IIIIIIII Y � �"��_� C� � X + u FOR BAYY W���IIP_ 1B.P -cl RC X� FS 4H'WW ISBw48"WW & IBBW HW OVE .� Q — Y i REM MIE 9 WQV-2,562 CF .,.:: m Sr y In J�pI��I`I``''_e, �W —�- =�?�OVE- T . CLASS B RIPRAP p CP X &X� _ X X O>` - _ INLET FEAIL•50 �,a H / \ BASIN DETENTION VOLUME-2,6612 CF e W & C C r /j2 A ."v .: ''�ti llfa C C oo+ V7 Lm �F 'CP-III 1, ' 4• } - G a, - _ ..� //, vE0 •• FOE PROT TION C �A, I •iilM= TOP OF BASIN- r� , -c '�G�L // 36 VF - C\ C CL I RIP RAP Q/•� 50 YR WSEL=875.T5 G"W'Q ` C WITH CLAS' B RIPRAP W L W MTL T_ L _T_ 74jNS T MTL - ' PROP CHL FENCE _ -PR.. R •/ �^ 9 SEE DETAIL 3 0. ___74L4 TONS / --- C` � .• �_ `W.SITE #1 I iG .ra �A� PROP CH TT �_ ZSITE #16 GREU T-2 � E JB FOREBAY W/ --�-- -- —o-r— —� .90'RT GREU TL-2 •.� J _ DETENTII I-- _ =n��,17�•TI_ �i7- o- J ss 8'VCP _-SEE CLASS B RIPRAP +60 Y_S- ___ FOLGER DR 20'BST (- ) DETENTION OUTLET CONNECTSEE INSET , / 3 _ --- —_--_ STRUCTURE EXIST.GUARD s r , --11.-- •2N TANDAU, - - NO��V�F� k5 I D.Y �' 4-- _ .. _ -- -- 30 C& . U V r�cno�n -- SEE INSET\SET END -- --- DRY R s•�r-6�-._6!!- FOLGER �nnl� ss �s o' M % INSET EXISTING R/W X, %ACFMENT DEPTH: rr-..,,cv cL 1 �< INLET CHANNEL STABILIZATION W" SBG W/G.R. COLLAR oGe3omilel F -- NNE Scale �__�� co J1 LOODPWN BENCH e NG NG 24"C&G , CI) ..��A ON'II'RIPRAP Mr all m BANKS CL'II'RIPRAP L �: 1' R' .A ti ON BANKS :fir: C�L'I'BIPPxd PERTIES, L.L.C. y ♦♦�♦�� CL��������4w�► SITE #1 CEOI'OPPAPO 5' V 5 0.10 y PACED ONE iOP =--- 24•-=-- ,,I �lll U ♦ NATIVE MATERIAI ION fBFNCHII S6 '��;;, PTO FILLVOIDS ,(ONBfDINo GeoteztilelN ' •t ' �,IlY 141* 0, ����, ,! HW W/ -Y_S-STA.37+15 RT D1x 1 — v� ,n7��!� RIo , =____--0 __---------- 7, C L,.i 1��� �Y1 END NOT 6 F �W- �y2`._�� Y� YI�YI ND NotAtlittb a t - ��� .r v.. DENOTES IMPACTS IN J���� w- ��- T. I � �� SURFACE WATER ' Ijw rl� �1 ��, YT.. o — -__ - - INLET CH .���.i��_�� ����r�������' 41r A DENOTES TEMPORARY TEMPORARY IMPACTS IN STABILIZATION � y�� IMPACTS IN SURFACE WATER SURFACE WATER SEE DETAIL 50 - =�__AMIIIM__,. , 11, _,� CL I RIP RAP J 25 12.s 0 2s 50 NON-STANDARD 74 TONS REINFORCED SOIL SLOPE CL II RIP RAP ' CP—III 1.1 _- " �o (RSS) W44.5 1 S I I (�244 I�n� HW/ ,� \ \ GRAPHIC SCALE - INSET n uu -- - _ _ --_ _- = --_ _-�_ T " � I IOOI Morehead SQu¢Te DY., PROJECT REFERENCE NO. SHEET NO. �� INSET Suite 610 Charlotte, NC 28203 /-38/9B /7 865 - NC LIC NO.F-0165 RAY SHEET NO. �=�{:T/� ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER __--_-- —'— - PucEMENT DEPTH: DETAIL 101 T 855 l _ (No GeownB.l OUTLET CHANNEL STABILIZATION R ' 8 15 INo,m s.ol.l NC GRID NAD I.� :1111111111r‘ �I I 0) A NG fLOODPWN BENCH NG V V V ori CL'IlBANKSP ,,1111 .I I ON BANKS 50 25 0 50 100 CON BANKS 1 CL'II'RIPRAP vtl ' /, ' ,, I CL'll'RIPRAP W NATIVE MATERIAL " " ' �r B OCFU VOON S NATIVE MATERIAL B' VARIES OR' SON BEDI GRAPHIC SCALE DOCUMENT NOT CONSIDERED FINAL PLACED ON TOP L TO FILL VOIDS �. �`.� '/�-��' SITE 1 ON BEDI SLOPE FROM INVERT TO NATURALBED ATAPrfox.s UNLESS ALL SIGNATURES COMPLETED *VH{ n -Y_S-STA.377++95 LT 11111111111111111kr 1\� � ���`��`� 7 1 ONC GARB g.110 +F 4 . � ���.. .E�.//P���11 - 25 12.5 0 � :UiiiRi0ie��re�lY 6GQ///.//�!//R��iv� — 25 ` +'"'+ ii:, Iemir'. ....ice-- wiiii ird 7n___..../ _ • AP k'"g IrizieOiiiit �� ��A]t� GRAPHIC SCALE - INSET 4111/1.9 fit' o V ,00V • 4,�L _ p 'h • OLIR DO SE lir AN HOLIC .�ttb� #T DIS DIOCEST - CHARLO �I{ Ir •T2P�IUP /�' '..' � � a1'u.: c-R- / ' �• CA TH OLiC°CHURCH �, , ��'' v n ''' ' � .//� i CHARLOT ' 4501,41k, 1 ♦ �Nc 'Vi. i/a ,. O ,� ^ ®.� u _ _9 .ROP TAPER J ��'�m fly* Q SI ��% . a.��� SITE #17ita_ \\ TH!.PROTECTI• i� I liter lw Lill r, % SEE DETAI tI Pe} f/ IP (IC �111001, _ �-� 3 sx P � SEE SHEET 17A . - - °pF B ,. ,ft : J \ — r W . L'.. , 40 I � P i;: i3'ff✓+f egn, '• HN :. • •• —lior — _ iP. - Ate, �5 I�,I�III1II\\ 1..` •R� i��' �w i .,... .� ..Par "„ x.fliT •:���.... _ ..ID RE _ ._ - i�� /w��a /1�ilyc.A11 lit ,,,,,Ac _..l�L._ o,._i�� 24 RC !- irW� `�tx?\ '--Y wal .. e: - __ •VE �971Pf �. ...ioor B GI - •---- a - 4 Cl) i9 GR `" ;,a.. '!ice z� �%7f . �s�� — — ---.. . -' _ N I o SITE #18 I to �� REMOVE 2GI � R !7 CP ..e. . ,P — o � _ �LVI e -�_ � .;:.I.'T:1 —--- SEE SHEET 17A o ' = y *.."r em _ �— P.r:_ V "'>:i. ' NEIMIEM o RI�`r -I REMOVE A REMOVE RCP-IV O 2GI \ - o _ �������� M A" REMOVE Ai B _ i,I. 0 '^ i�a'saw :i �i Le �107�1Oi� _ .��''_�i���f_.__— _ 6. ON - , m ,.,„ ' T =0 / !� iii, 3n ,WITS �_ ® f,� ��+ O v Q ` �►� - ..,rx rmi 1 - P� 'sue_ —- _ -� �i�iA►, aWSt� 'r' -�'�► _t tee, m � .•,, Cm Y_ - t\��\r-'. !- I� /RJ3"i..,� .p �hl� � ." ID"i"-- iv. -��Allik__ Z _ . r .f -�������� � _en. x `��1B.m PFu T I w!/ � �ffi1.L11� :Ij.` /• ••m � �p... 'IIP'1 . n IIIIPJ'.., _�� '-1 I G►'. t :; �i� .,.IIn VI �s?? .r... ..- _ ri ,W ill.g1YDETENTION 3ti -xia,W.& IS: C �%. R I . ;RY� '/� - �.7.l � r .- �` =_�=tea CF `^' ' ©� \��c�`. � -B,..__ � IfsslwM r W _ t 74 P. & -�+ MTL ' ��L - PROP CHL FENCE- e w 1� - -- r WTOP OF BASIN=877 5' a -----2*' _ _ GRE�`+r�f1"rii�aiiA - = -� PROP CHL_ ITE #1 ' Z __�. sir ` i,, eSITE #16 ,.,L_-_ �TIc -- -- IL� _'- - GREU E9 JB FOREBAY W/ -� -- ilteiTY_1:717_TI��� .90'RT N __ __— — 8 -- -'++.uN TA6.A-� / ,/3P-K _- .:. nOLGER OR 2d ,_ \ .. �R�...�,,.. ;--. INSET\SET ss ----' i x CLASS B RIP' +60 Y S- DETENT-' OUTLET CONNECT T a = 8 VC' GFFS SEE SEE I R \/►ET -- ST URE-, EXIST GUARD F°LGER Ornu - v 0; .� N • PLACEMENT DEPTH: �P . ,.,,�rti INSET a 1- °' INLET CHANNEL STABILIZATION / � �•• CL 2-30' ���-. � I (No G....d.I :�i�II �'�/��7. • �\\�� ` (Not Scale} —�-_ FLOODPIAIN BENCH ' � • •.I i _� NG NG - 24'C&G r 77II Nmitiggliii 3 '_ —�, _ W_ -�—�•� ��y � .i��p ^ CON'Il'RIPPK.ASP OBST 1. L _-- __—_ �__I' — � CL'II'RIPRAP .4 ': 1' I ° �— --_--_� ___—_ __ '�_ ���—�1 ON S :fir: CCLL'I RIPRAP W PS-TIES, LLf. r- 1� __ �-_�_ __�___ __�_.__,'lllil =_=L.a. CL'I'RIPRAP W PLACED Z.,7 24. &D,Q UUU U ___— _--_ _- 'Jj • 2 NATIVE MATERIAL TO FILL VOIDS —_�_� _�_� _ -__ ���/q� Z � f P TO DFILL VOIDS 5' 1�"VARIEB 0.10 ION BFNCHI '� �./•�'�.��--_��-'•_ CT. /0 ��� ��' ION BfDI — INo Geotetli el .._ ° A��� �����_ �`���� f it ._� 1., ,,-* Y 1 -Y S-STA.37+15 RT DI aL �/ _ _ �[d ND NOT N ��S_ W �% �_ 1m�=�1 CAI I�I/`tI'Y/"jr.�f 4i, , _ / DENOTES IMPACTS IN �j� I O��/ l 1 il; b.` ���15�__...... � � ' _-��=lerAlriliu-x/t 11 OK--,- --, II / 1/� i'// SURFACE WATER a =�� _ - , \ u ;� _�. .�• �XimL4.�iw ��'. e' ///i � '/ DENOTES TEMPORARY -������ �'��'����a� ��� ,, �%" IMPACTS IN SURFACE WATER _ rr,...---0111111ir, 111 -......._--ai- _Adillor fillip 4 ' 25 12.5 0 25 50 Orr_ Ste�F _ L8� —I �� Jr. ��.�� GRAPHIC SCALE - INSET - " S I 1001 Morehead Square Dr., PROJECT REFERENCE NO. SHEET NO. DETAIL 32 PLACEMENT DEPTH: DETAIL 101 Suite 610, Charlotte, NC 28203 38/98 /7A CL 2 - 30" NC LIC NO. F-0165 RAN SHEET NO. RIP-RAPPED ENERGY DISSIPATOR BASIN (No Geotextile) OUTLET CHANNEL STABILIZATION ROADWAY DESIGN HYDRAULICS 'NOTE A:IF EXIT VELOCITY OF BASIN IS SPECIFIED,EXTEND BASIN AS REQUIRED TO (Not to Scale) ENGINEER ENGINEER C SECTION OBTAIN SUFFICIENT CROSS SECTIONAL AREA AT SECTION A-A SUCH THAT Q H des/CROSS SECTION AREA AT SEC.A-A)- SPECIFIED VELOCITY. NG FLOODPLAIN BENCH NG DISSIPATOR POOL APRON 'NOTE B:WARP BASIN TO CONFORM TO NATURAL STREAM CHANNEL.TOP OF RIP-RAP TOP OF BERM NOTE A IN FLOOR OF BASIN SHOULD BE AT SAME ELEVATION OR LOWER THAN IIII. Air TOP OF RIP-RAP NATURAL CHANNEL BOTTOM AT SEC.A-A.PROVIDE SMOOTH TRANSITION FROM • T� NOTE B END OF APRON TO NATURAL CHANNEL WIDTH. ♦ Y� P. •�� NalP 0CL 'II'RIPRAP TOP OF NATURAL ON BANKS r1�" ",�\• CHANNEL NATURAL GROUND V.•. - a _ '�'';� • / / NOTEA CL 'II'RIPRAP Ni 1' a '�,"T'�.►���pc►►�L�� :•..,, 1 ON BANKS CL 'II'RIPRAP w/ A - B- B B 1,�c B NATIVE MATERIAL DOCUMENT NOT CONSIDERED FINAL PLACED ON TOP GEOTEXTILE T CL 'II'RIPRAP w/ TO FILL VOIDS UNLESS ALL SIGNATURES COMPLETED CF(' A-A NATIVE MATERIAL 8' VARIES 0-8'i (ON BED) ' 5 GEOTEXTIL -A PLACED ON TOP NC GRID NAD HALF PLAN TO FILL VOIDS B I, (ON BED) SLOPE FROM INVERT TO NATURAL BED AT APPROX.5% A `\ V TOP OF RIP-RAP I —Y_S— STA. 37+95 LT B BERM AS REQUIRED �D�141. ATAZ'.00.Pi R TO SUPPORT RIP-RAP DENOTES IMPACTS IN •r4'� PRO%EO•' SFr R-R EXCAVATE TO THIS UNE SURFACE WATER GEOTEXTILE BACKFILL w<LASS I RIP-RAP RIP RAP N. � �. OF WATE ' II CULVERT 3°I"' �HORIZOMAL • �////�% DENOTES TEMPORARY �C TOSUPPORTQRIPERAP //'/- ?/7�/ AS IMPACTS IN SURFACE WATER ESVATE TO LINE DUA. RIP RAP BASIN# BASIN #LOCATION (AT OUTLET) CFf GEOTFXTILE BACK ILL wCUS515RIP RAP 1 2 3 4 5 6 ] 8 1 -YRPc-10+82,127 RT 25 12.5 0 25 so A 0" 30" 2 -V S-47+61,142 LT 2 B 0" 20" 3 B 1 D 16" 1'25' 5 NOTE: GRAPHIC SCALE - INSETS E 3.5' 5.5' 6 Wo= DIAMETER OF PIPE, INSET F 6.3' 10' 7 BERM AS REQUIRED TO OR G 10' 15' B GEOTEXTILE SUPPORT RIP-RAP SPAN OF FPI POE-ARCH ✓ SITE #17 H 5' ]' SFf D-D CULVERTS OUTLET C HAN N E L �5 STABILIZATION P1 / ' ' TEMPORARY IMPACTS IN A SITE #18 SURFACE WATER SEE DETAIL 101 INSET CL II RIP RAP - 439 TONS IfrsRIP RAP ENERGY 7::,,,,:_v4,4214,14,0 _4(...yoty- tDISSIPATOR BASIN #2S � �t. J� ' SXPfr ./JCL 1 RIP RAP P - - �� jr �.�G TEMPORARY �V � E �IISEE DETAIL 32 i� ���I� — �j•�� � ' IMPACTS IN 9.�.�F�►,.•� , r� �� -- �i •• SURFACE ct I .►VI% (011 r it 1i s , — ,— ___�►� ;. �, <�` ` - . WATER co } C IP RAP �Ln �� i� r � �i� �t:�� , r.� ,C. / mo'E 1 TONS 5 o SY �I4i / 4/ 1 ST DARD 4if RCP-III HW ���o ...�r.% �.r .�1+rrrrrrlr it � rnnnrrrm e r't tt•7, . ® � A '.rrirtrrrtUrnut�t•��r • �. , rrrnriiiiiiiiriiirii,' Z '''''+0111110.0.01.M.,�,:..r'.z�rw�+r�nr� / ! ` MI* %I1 I �� i R E I N F O RC D SOIL SLOPE ��� ��� 1 - idivilreir_ �M�.�' -�� �,pti ) �rltol �� ' REIN O R:l SLOPE 7133 *I / --.. CV iiIMEMININIII Aillk i L I �►cr � 4. lio —4/411111111pr__/4f1 +$,4 I 10. 1�� h/Q1. ,,,,s* CP—III �� FEpA1i*$Z1 / /�. TB 2G1 —\ 8(40N-NE T (DROP BOX)LAST JOINT i/COLLAR 315" I — — — — — — -� —��� ItM // TB 2G1 15" ' �_ Ara ' / / `'' COLLAR ID \_A \ o COL CO /Z " S I 1007 Morehead Square Dr.' PROJECT REFERENCE NO. SHEET NO. 7A DETAIL 32 PLACEMENT DEPTH: DETAIL 101 Suite 610, Charlotte, NC 28203 38/98 CL 2 - 30" NC LIC NO.F-0165 RN)/ SHEET NO. RIP-RAPPED ENERGY DISSIPATOR BASIN (No Geotextile) OUTLET CHANNEL STABILIZATION ROADWAY DESIGN HYDRAULICS `NOTE A:IF EXIT VELOCITY OF BASIN IS SPECIFIED,EXTEND BASIN AS REQUIRED TO (Not t0 Scale) ENGINEER ENGINEER C SECTION OBTAIN SUFFICIENT CROSS SECTIONAL AREA AT SECTION A-A SUCH THAT Q H des/CROSS SECTION AREA AT SEC.A-A1= SPECIFIED VELOCITY. NG FLOODPLAIN BENCH NG DISSIPATOR POOL APRON `NOTE B:WARP BASIN TO CONFORM TO NATURAL STREAM CHANNEL.TOP OF RIP-RAP TOP OF BERM NOTE A IN FLOOR OF BASIN SHOULD BE AT SAME ELEVATION OR LOWER THAN TOP OF RIP-RAP NATURAL CHANNEL BOTTOM AT SEC.A-A.PROVIDE SMOOTH TRANSITION FROM T NOTE B END OF APRON TO NATURAL CHANNEL WIDTH. ♦ lT a ��a=" N 0 CL 'II'RIPRAP TOP OF NATURAL �" "��\,, CHANNEL NATURAL GROUND .3 ON BANKS _^ NOTE A ♦r ^_a • ���M5 CL 'II'RIPRAP • ♦ N l' R A •.A010.''4*"''�►{� ' 1 ON BANKS p si CL 'II'RIPRAP w/ NATIVE MATERIAL B B B B PLACED ON TOP DOCUMENT NOT CONSIDERED FINAL GEOTEXTILE T CL 'II'RIPRAP w/ TO FILL VOIDS UNLESS ALL SIGNATURES COMPLETED NATIVE MATERIAL 8' -VARIES 0-8' ► ON BED !!AGEO E E PLACED ON TOP ( ) NC GRID NAD B395 HALF PLAN B 1> TO FILL VOIDS (ON BED) SLOPE FROM INVERT TO NATURAL BED AT APPROX.5% V TOP OF RIP-RA BERM AS REQUIRED -Y_S- STA. 37+95 LT �D�`.\.I.'--,,,'-'.,-,''•i''1 TO SUPPORT RIP-RAP DENOTES IMPACTS IN RIP:!4 : i1 • ii ��/// Ge� DENOTES TEMPORARY �C TOMS AS UPPORTQRIP-RAP //'/— IMPACTS IN SURFACE WATER DIM. RIP RAP BASIN# BASIN #LOCATION (AT OUTLET) CF('GEOTEXTILE BACKHLL N<IASSVATE TO II RIP-RAP 1 2 3 4 5 6 7 8 1 -YRPC-10+82,127 RT 25 12.5 0 25 50 W. A 20" 30" 2 -V S-47+61,142 LT B 20" 20" 3 B M1� D 16" 1.25' 5 NOTE: GRAPHIC SCALE - INSETS E 3.5' 5.5' 6 Wo= DIAMETER OF PIPE, INSET F 6.3' 10' ] BERM AS REQUIRED SITE #17 G 10' 15' a TO SUPPORT RIP-RAP WIDTH OF BOX OR GEOTEXTILL SPAN OF PIPE-ARCH H 5' ]' SFr f1_D CULVERTS �� , ,,A 505 . • r i TEMPORARY IMPACTS IN 1 „ SITE #18 SURFACE WATER I 1 � "ini>A40PINSET ��, I I °• , / , 4 filvititt,__.,, _ __>- - 4 4 ki 4 l / RIP - �'� �►`,-2 44 ��,, �. �r�, 1I, . „ ,I��1 P ...:,,,I,, '''( TEMPORARY _4►� 401:10 ,' �� = ,,' 7, IMPACTS IN B A i s ,l/,t.11 ;J 4..4.* / �T �rT' 4'i ��Tlai it T�`ilj . rr� �� , As, �i�Llt�,v 4 SURFACE j1 f -- /}j��111`ti,�dvs, ` - ——� Air - - - /A� _ �-1 �.� �,1 �►Ii .,,i- WATER �frI�,II1I�1��1/illlu � I� to . . G 1111 . . �• ►- �'1n1 T- .1� ti' Iat *Aff ---'- Ne v • yi ii-9,- -4. - ,(04- ' 4'/ d III �r41 ►, Y, �ilirr ,I, � 4.." �``4 4": of TONS 5 SY ��/��11���%I't�l►• �Iw • if ,. s. �y�,'�r�►���%'�y ��'<°' ° * % �ti ,,., —STA DARD i0,,... .,N 1 1a 1/1li �111 rlir ►- 4 9.0�1.1.111,1.RI1.1.1 ,}�• '� / I r���� �''�� L • ��', •01. ..::.-• ,- .3: ►+.�.�niir.��niA•.��, ►���... 1 � j%����Ity ,��r.�j SLOPE � ��, � ��� � r D SOIL ••1 any d �E ........r. _ dliffir�X 4.1... ,��� �,.., (RSS) Wl1: SLOPE �� glum.,--IP: , . ,, „ii���,_ �R. , .- 0,�. ;4,, �-- �1a� �ti���°�:e �Y' Y titti,ti ' ��I////// IiE:vill�//'0I/ f�.... �.►� / o g-) 0 - - co i-4 frA.4,k kvA.&Y' 46 � ; ,Pio Wil ' cp'a Ap , .0 4 1 ir,z -04,, .;‘,0/ pl�� .111411111%1144 II ��'` C D �. /`FAO_:° - °44re% A Small' a r 2 .--ill - - - -��immile�`.��Il&m►.��I�� AI ,_ "IIIIIIIIIIIIIIIMISIIIII611 ----.11MMI"-- &A raj _ I`�1� "l I) s.u.NlCLC O.Aw65 oeo ry rc<, Ramd wo,sl 38/9Bs -MATCHLINE STA- 19+50 00 Y9-SEE SHEET NO.28 "� tpli . ©ZO " X `'... . s �g , I�'I� ( *�m..�°Q q— 1 y q =� °ly q�, ExDxE„ Exa"FEE I $ y\;:ye e A" e a DE. a QS< Fps .�ii © .*��, I/I �Q:erw •� DOCUMENT,r'+' N D NAD �TM "'2 �i I an q m �° ��+yP1 �4 q y, `•+� I i'" Ak UNLESS ALL alalu.uxea COMPLETED 3 it a\X\ ` s`- 91 1, �I � larn 7] r;-,, - -s-"=-"`-r'' q 6...:*� a.,wo.m °,.m `0 / SURFACE WATER IN ND.s, ErEC * „ `� �. - _ _ S 4 s -,*Ij . Ty F a DENOTES MPACTS • lia. AL ' /�� 'F`,v Nou Ncswoa.x,,R i'+9 1 ' _� © / ; _ .� ,I ©, ql q .,y i g //s// DENOTES(TEMPORARY Itt ° °q v10 FIv� �' ?I' - '*. u.reR �. // IMPACTS IN SURFACE WATER s. r, gi, ,wed e 1 \. .. i `� �\ nu,�,:�� III !71 E; :N a.4q LTs u,* E$'�'• $ .. o'eury GRAPHIC SCALE xi u.oA e. oN. ilk"'� m vim m qc =� ,,.. -\ ®e mw m,. \ � 1YWn rl Si -� %y ''14�IIrA .::e..,Elaarrr77Yon � i r - n E oar,.. .- �' ._ "i ��__--a !�! e a • - Nw MxEff 72 ExwAa ' ' w \i`9 11� � � + ��4'�:., �r�,°"oEl3P-- w erg, , � . �, SITES #gel o' �, . �l ,6 = u — „ �� �11'�aE�v,:: ° �t �'" / "` a ® ', 4.,„ SEE SHEET 19A ;:,'," yi ° n: s: 4 T IL �-.E I il 0 „ o,; 1 \ \ RD RD DDAOD I u o ODE Da x oTMD E ...eceawsq / Hl °w-a r.� ,. .. - L:PPRduNmlAl e - uw.von mo e Sty \\�. \\ \'�� E ' - - * •� @� Da w :i \.. .;r -�J - 'w nrau Eu , * I Eq. \ ,� - sE wu, \� - F- W ,II �. .Ia ::- .. aam43 � _;' fD .:»+ � c ../ �\. \� � +� � ,}°* __^'- �W wn"M _ iiiri ollir ili W ti. r f P:; : Ey.PIr IiWE:7 _ * .��c\ _-..,:. W c '\ vx,w ,EM��wl `� miww W ��\VSW�. : a,�a ' 1 ,��®III YI�I��hit � Iq -. diiii ,. �� �tiblag DETENTION i- \ a ,uouew, —xOLILLEI wr REMOVE • .I��m I��Iniu��z. � wNM"°:EwAD , ��18 I�IEI�IR Qa° F..,, -- .sac �'n�r mlu° E llilla,Von — -- on ce— _— —/5*Lrr °av — o.e o _ _ •T T` --- -- N---- I �� ,.,,,,,y.. ,EmanRe, n��nll�l� lfl €;• - -,,,,�,w, ,o.:x:,". M.E SITE #20 .0 —r '!'"II�I� IE _ . ' B0+m °.E } c SEE SHEET 19A �,° _ I; y y -� .� .," ,� , _ _. '= .1„, _r., - ., c �, N :,1- J o + 7 ---- t a:F.i Eual aaffJI.�I�CEIIoF�� ,,•°gym' - _ � � a 'O L i�flrii;arilir°°!�liur�� E,00v,., �.51; Ftir2;57; : ram.:. ...:n,r. a d S��� ' //,.v;` r�' u::,t n t ., :ems - - --, '' _ ..- ^ �iM�".".a:J�-' " o -_ H _ <-,N. EE.Man ce,� ` //,s o- a,n a f *,., - - ' � f1J.. gyro:,i •a � ' F E N ` ..I.,. .' i..t'., - 's,-i. g t v cuG 3...a IIIIAMIIIMMIN 11111 - • PI 1 '"+^�. - - W a: '. :,/_ '° '„a a ,,: .t,�' [vs r,;: # �'.: I I' V 11Y roE ®v,E! --.� J I` I\/�/ -.::::.� 1l! / ,w ,�..r.,. xs , - _ _ — _ __ .c��w - ,I- m, '� RUE vuE � / *Ail ... IAa x x ��// s xiµo a�E o x �:...: ...:,n d, SEE SHEET 19B a rlt - F,Mtgt x U .. ,. E ,,,,-A J�// I„ ,woA::,.,,E R ITE #22 I a �:�i'^► -;I • M,""".h:w 'm ii..,.�_ SITE SEE SHEET 19A u ` - oss,..RE.A,M SEE SHEET 19B 5111���liV��l,eV ne���; u m s` #23 \I' wu �„\ "��I "� L:< .:,%� dFI N �� _ 3s a,11 TE . ... *"'�.''��'� GJE 8 o:c°-7���� I a„ 1��In l a; ow, i Il r°f. I I`s k 3 `;nI Al _ F(SEE SHEET 19A�,1 I {A "-�:;' o ii- ♦ .., N.,; .4'0 A IA E� ` `EoEa,,.„ q I —'4 �i . � 'w 6,' ° SITE #231 a I • �'�.:. ii- ��a\�. .. "��. ew am,v uc o/ , °t"„ �, vi��, q !e q v I n• �EsIvra7 €€ II, III i,5 x I J/ f. e%' \ \ �� �:� © �� wµP *I aI a ppp^ /rr, =T_ ,f/ . 73 / �� • q�\\` ` p bi, \ , c I1 N I E AM j 4N I ' ^I `g „ >o V'r /_• S sT PC- a �E�4, :IL! II 'I � : ._' ,,'• 441110" / I! -� ii,-®a _ `E x �P -: 1 zsm°ws Pl Sfa/2+5095 Pls SYo- R6 2]]0 PI SYo/I+B268 Pls Sfo 12+83.44 PI Sfo 14+8I.40 Pis Sfa l6+]]24 I \ '" "f° 1' a 0 6' p-3122'12_T rRTI es 04d24.4 p-If46'226'IRTI es T09'43I .5 2839355•fRTI es T09'43.F ,I,k �p \\\ y "^ -� .:; � e F1 - I1 .11-Y IXI: I . S RS �.1 vs '" D=0'40'26B es=709'45, D=48Y43r Ls=20DA0" 0 604 air Ls /33 8A L 49996' Ls-200Ad L 164.35' LT=133.44' L 260.48' LT=133.44' e,,,„,T1 \ 4 "�- E � ./NA�f� g ,$ T 250A5' LT=l2]]4 T 8272 Sr=6677' T I3I.40" ST=66]]' IL DROPPING OENTEa'"L�c `9 �u`` :ar�� �I/ ASH :5 I - ' = SE B�WAd ST 7253' SE=OBE SE OBE %a ,i„ \ /_E+E�� �'• l°''�SA 1 OS 50 MPH OS-50 MPH DS 50 MPH Q e" �, \\„xc j-'�trrr �. ;4 ,:�l x,P r ., ,f �k - 920 ei:Sf/9 409 P�Ie3 a3san `g' ' \E 1�1111 ,ri' n es Rs ST09'413J' es�1f 2I9 J0' p42 PI�21'235059'lLT1 1.56 g \.. \ II‘ \ I dNp�y�J > Ls 2CUAY Ls 200.00' D If 2]'330' LT-1200.0d D 16/b9'330' I ,°a".• • \�'e�,. "' .. i � Syy+` > ST=i66.]]' ST=6692' T_186 b2' ST 6692' R 8500.0d _ `' I��II R 500.0d SE 25 ® � ! Ei� a 1k R " E=O6 OS=206 5 MPH I '' r. �A m �11�11 4 :'sLc �� 0.5 25 MPH I io )'kl • Isle we a I`II Y-9(PC- -Y9LPA I �— a � I,n u""� I i • p N1, II Fps c�K � k fl I° es s3411 3d 55.9 p S`10428'39.0 lLTI es 51343d 559 els 595�52 p�I3T+22'31.41LTI I v+n © E3E3 * ", 1" ❑ 1 LT-I3596' 3021d 559 LT=11335% LT= ,98' 3o331' �� Y� N,I ST=69.06' T-214.ir Sr=690u ST=T09Y T 32426' I s; 68 III ! o t9 `f , °.`2y ri R+ 39 R=I66fU' R 1265O, I Y+l\ 4 I � \\ ii: 0. ` IC III I INTERSTATE DEVELOPMENT COMPANY IIIII OS PS MPH OS PO MPH rv7aLy3\ \ 1 ,d I - � Y9 -Y9B- o \ t\ , • �� Y11�� '� Pl Sfo 21+5]99 P/SYa 24+/333 Pl Sfo 30+09.40 PI SYa 33+44.12 PI SYo 13+,T/Jl 0.y 2M ` (III p 3'0402L'!RT)p 3'04021J'lLTI p=3'59'323'lLTI p 403'4lS fRT1 p-4S 2d 385'!LT) 0 1 :g 59 °'2O's, .• A I • j` I1 0=f1Y 042 D-fl2'042' 0=fl2'042 D=f/2'042' 0 4]'44'413• g. $i "'s. \ p •4�a I• j �k'1= IIV L 25535' L 25535' L 332.3/' L 3389' L 9d]8' g\.— �g\' �E T=lD7Y T=l21]Y PT -/6625' T-1692Y T=4/b9" n sxu.° — �I —�m,m�, °� \, MATCHLINE-STA 34+00.00 -Y9- SEE SHEETI N rk•�i O=440 MPH O=440 MP R=44]O R=440 MPH H=1z0 • j1t la -- SE=NC SE=NC SE=NC SE=NC SE=04 i . \ m. c , A N \ 3I+i1i _T—' _- I OS=40 OS=40 MPH OS=40 MPH DS=40 OS=20 MPH - - 0.29 F,g LOC..In AT Ew.n S A. s NOTE: PER COMMENTS RECEIVED FROM NCDOT ON 10/16/20,JS LINES HAVE BEEN MODIFIED ALONG SITES 21, 22,AND 23 TO FOLLOW ME„O 41 THE SURVEYED TOPOGRAPHY. NO RIPRAP WILL BE PLACED IN THE STREAM BED ALONG AREAS OF BANK STABILIZATION. OM M Nmw of o,„ "l I� S.u.l o�'oeory'S�ry of�b�o3 �o�sl 38/9Bs ry I sxefl9rvo NC LC O.A 65 -MATCHLINE• STA- 19+50 00 Y9-SEE SHEET NO.28 \ q .+ .1 E,,r'''''i Ntt:-.41%,ii.r.-.11.-.7.- , _; . Exorv.,. Ervc rvE9 2____ _ L / ` �titkt... v Vll M it i f� alai. \ ( ,,q Lc i 9titt*Vi*.‘.V.Irej4, 1, ..'./1j I f 1 q ►,kil � N D N-�5 a 1 /i' ' . sll► •• S `I I it C� .� ��I�...om C / 1� .:aar"_�•.\ti.k., gip' ) \ , 4. --cc 1 _ .,.. �_ =: eve-�:.� ��a'i1� , '"r• D ♦ i - WY , - i . �CZk SI : DENOTES IMPACTS IN V� iit �f1p.� SURFACE WATER � . .� � l� n.- ii ���"�I =■"�I� - p1/�l/�iff�lly(I�'1l1.1���• ft� %�����`'� I +� �- �ji€ //s/ DENOTES TEMPORARY\� ��:.� y Zo, ...� ,���SiH'� � I IIIB, . .c.. / .: ;I �:_"�� lyk#f�m' Y. %/ ,.. \, '+. \�. f �l `._ �. _ ` � 1�1k / IMPACTS IN SURFACE WATER It RRR 1 \II \mac \ F IMJIliltiIjl ' '' �� '[ aC y ' *� 4 '� 4�. \ irrOe ' N...';-.-z• ‘'.''.•. --- � �s` \ i' vYP9 i lil 41 kabin �G1, \ V GRAPHIC SCALE 1.11.,1 r ira. ii 1ik 1 I j \l1\. •��, r, "'�&'v 1", Ili�LZialy1.:'ri�l`'isw- � ���� �. -� \ v�,.p v .�, ��- x..» . 1111 ill ))1 c,.. \ * +� II!II Fs-I----- :z a ` . ' . .° r � !x1R-... y - -I. ;A„ i+,�"�'�1., cw... "'`-45� -• • Y \v�a11F� _ �itL►rsr\ 1• `+A y1 try �i}. rv.,u, -- ti ►iri• 'v..,, , .z,1.' .nin� e I �'IT 3 :E�.v�:. ro��' ;Rriii�M�l1��111 .'•? - r. � �:� �� ,\��l: `�. 7 -,.,0?;� ,' a 'zIw4z. ' SEE SHEET 19'NI rig f� ii I�1� - `\? �����1 ���\ • /' t :; " n,•..w H\ a ��\ � a � r�` 1jI�i(� r „.' >• ��^iili. 'I "Ay I� li,y `,•,, t� cpti4141r _ �••\.. .. �a 1\• o„xoo. .v:' .��. y' Z •VH\= _ -� iy v!I�i l� I ... /fir' ��1I a�/i �.,,1\\� �."' ,'1 \� n� - Z ..:w�.� �,t°I>'" /` Hlrw-c L.illl1ITV'�t ,'� w. _l .�� �...-�.: a ia' y^ -.. �i . :QI 1■�iSIRIIR 1. - .��.. ��" :'�-„1j�, \ wu. -/, `pyy�P _ W 1....•::.'XA•,•,. � �. ...� ..,..'.:. � 1� .fll fuN.taFi .f�.�.6 * .?I�����.:.'/r // ' '\\\�� \� se W W"�� . , .,.I•.;,...o --��. � ....I' .........:.:•.:. .�1�Ii�` L�IIII.alllll��1�17• _-...��'=`�-: .__.-_.. � !� ., �..� � � �'�. I,r �?a\1<. „> � •. � I A .. sue' rl \11 � � — � _ ���: a _ �``a�`:.:, � r� :. ► -��� .'r u.11itI��xQ,y' �. � .- � ' � p �'�, � - �-f/����-_ _ � �fn w "�:''�, � �lb�y,,"� � •,�� •.:;:��¢ ..:,. .. !n .� P IIIP1!p1 � r=.� '-_ ••'44 ..����—'--gimwamAI- 7�o_ c.a.,,„`.- � _ -- --� ! —%- IL w C"io �a' .• - - .:. __...a,. R a'�� �.�s.. C YV _ .xf � i�,►f. d\ _g. u Aie .11 -- - -:� - _ •..,.y = -_ , ��x  - Ali -a'r a -' -- -a - ox oc s, f N I��r�o�-+�m�e� ...;�_ - �=mot.. -�.� -�.,____-� °.._ � - -- -—--�'ry'._�_ �..'��,�� _ _ � vi)}�0�4���7 ^.G�:Z���- _a�9�����All�■li IIF��Iglll—� r. — gam. �_ _ —.- - i}I o�Ia�-3— -=_, 14y , 3L+A�mm��llmm1111 7 IN�F� .l _ - �. =��� SITE #20 �.�r.�rm.-.■�..� o:w■wL. 11m�le . �-♦ter _.�1. mi=m C 1� g+l■If-���«� • 1• �� "w"I� i. iiG Im WIG v.TxTda iS� - _ - r - Rr_' _ -_ - - _ -- -`~ + Ire_ ��� Vim.. �Ima1o�R� �� ter ' c __ ate: + M i:'r�Ci��—_��C �i—��� 3 T�;11►',tiL�- '� I1I•E�llli;'T„ __� - _ .. ... '� - `, -- _ _ Ls �� "l% -. Imo.,r_a e _.._s n rrl■17__lI_J��� _=.;.— _ ss.� mil � -�e„rlr._... 3: , y - ---_ --- -=� -- - - -`_ --- -- tea► .��`.�-."'°� �GR Q -`� -�_ '. ..:'cos ��a _ .; - '-` _ -�� _ tL _�.n• -.we Q - \ ,. .7-. 1 =— r .n. In � ..,.. • aF,��sf � -=' -'•i'�r - -- '� - '�.�--'_�r _.,` mvsli _'�.1-- 2 ..�.� � // �:�..,: oar.arEx.ory ensm I 1111 ..:...: • , - - - - - �� ••� 6'"-.� , . 1 •• cvoe., _ , ,. _, — � � � � .yv� L � 'L� �_ W„ ._ euxvawuF,oar c } r , '1 ! - . _ — ■n� �yw1Llj i. .I ' L11tt %� ;e_. __.., . n¢ :T�„�-x,�-tmnn.i.�.i��9t a■ --7- -7, I Lr ��i. - ter ^ 3il _\ <\ ,�\�� �' I�>. :."--_ , �'tx�..„ BIB.- �/ Y�� `., = Il ��� ��� .I. r J / - SEE SHEET 198 k M U \... + ;� �!' ,I •�,,=a ITE #22 ��' ily�1r1.1�iI1Y►11i�!� u ,� \� 'III _ - `�,r..: _ low- SEE SHEET 19A I, 1Z8a U L1�: q�j'►. \yti:, \ 44 \. \ 0kii i SEE SHEET 19B r 4 l t ;i' xs •-' i ff �� , � �� lin t s,►� 14 ��`(ir�� rely f.; �,, :I s SEE SHEET 19A / �`� 7 � ,ar;: � � "� P�11tlio I i,. I I , °' g,� 1 I iu,.e I' ► a �. . +a .,i., "1► , N��" / II .fie, .`a r. s : # �- ��\�\\ � �. off. �o�; all�� Iff� `� __��rd ■. 221' ; �k a i z= � ';° :�1;` !<• / ♦\ V r,4 p,, a^'"+ Il1l.:.i„ E> 1�� Q(r "u--` ..1. v I ie , .„`,,, Af r' - y1�`vw�a / = .. % qL`'c� ♦�\ vJ � 1 qAis �I il' L I II a -'itiga ,� '' �I, P� pp 1� � V .te If I ,„� ,.IL,1,1101 toyl. i ' , --�— jip _ i, Ct< �11 \it ' � T 2NC l2T]C T e III d '1�•' Y� \ �� # ��" ��� �I �I _- OS 50 D 0 PH k / ,\ENr. _ ,_ ��A ILIW 01 .� t �L.�l�r.=` e:311 o9zo 9�.-' ei ,, 'ie - SY°19+3158 PIS SY°21+98.42 SI 2�5920 .I I83Y 4391 S \ \� �.,—�—�� - _ ti .. G7Li�"+/1146' � I Bs TOd 43P Bs-if 2T'330' 0 2"059lLT) is � � �_4E ��V�� y g Ls-2CU� Ls 2000d d 1. 35, LTO a A \ -�- . AJ1 G _ Lszs.=ss.nLsfr=9: I aor Ssi rvx' J EscL --``` _-_ ��� .--aa� _� c'� gaI3}pI1 �Ir �� PISSYOIl+3594PI Si.Y9(PC -ls./a l5P Y9/P v` �, "e' J ,. ry ro P�' i"111i ' f.,� �. '� ilk !s 2000d- 343d559'394.rL _5 3i3�. B 5/l'3- A 11 i ��`^t 1 ST=69U6 T Z 43� 69. /T„ P� iiii �_._ � 4 h 1014 '' 1 39 \I a I66 V 11111 Q �Ilh% y il' Ise os I\I Y � �'q rb `ILI. OS PS MPH � �_ POMII{' daI y ■ A 0 09.40 1� Ih� D I II�� �� 4 = 9 323•a �lso5oa• \ „„ i M-nY�'j I� IiN ,_ -J ,2277 55 L 255 L 33 //I/k �/ " s �\, 1ine ?I��II��I EpI �.V 1q f •f..-' . 05�\l.7.. OS NC M _ 0 = NPH YL v 5' �,(f,' ' w ry i.�I§���i s�f.' ----- 6E NC SE-NC '6=-NC _ Ar '`- 'IWN� ��11 f/ �� ��� MATCHLINE-STA 34+00.00 -Y9- SEE SHEET NO.29 � � 1!I(��I NOTE: PER COMMENTS RECEIVED FROM NCDOT ON 10/Ib/10,JS LINES HAVE BEEN MODIFIED ALONG SITES 21, 22,AND 23 TO FOLLOW o.w arv. q( l THE SURVEYED TOPOGRAPHY. NO RIPRAP WILL BE PLACED IN THE STREAM BED ALONG AREAS OF BANK STABILIZATION. oE, ®� �� l/liil''q o o.ry wow a o,� NOTE: PER COMMENTS RECEIVED FROM NCDOT ON 10/16r10, JS LINES HAVE BEEN MODIFIED ALONG " 1001 Morehead Square Dr. � I Safi¢ 610, Charlotte, NC 28203, PROJECT REFERENCE NO. SHEET NO.1-38198 I9A SITES 21, 22, AND 23 TO FOLLOW THE SURVEYED TOPOGRAPHY. NO RIPRAP WILL BE PLACED IN NC LIC NO. F-0165 RAY SHEET NO. -_ THE STREAM BED ALONG AREAS OF BANK STABILIZATION. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DETAIL 13 RIP RAP AT EMBANKMENT (Nell°5c°le) 10'm Dikh ,,0'min. Z• Givde INSET TEMPORARY IMPACTS IN SURFACE WATER GEOTEXTILE Type of Liner= Class 2 Rip-Rap CLASS RIP RAPCULVERT CHANNEL -Y-S-STA.69+50 LT • AT EMBA • MENT IMPROVEMENTS DETAIL 51 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SEE DE IL 13 SEE DETAIL 52 CHANNELio CHANGE NNEL CHANGE z NPNmI b F. CLA 1 RIPRAP CO Groond d �:) D 19F Slop EE DETAIL 51 w A CLASS II RIP RAP ,en`�o'nnly) Min.D= 1.5 FT. s Aft CL B RIP RAP i>_ Max.d= 1.5 FL ' � •ILIIV ; CO` N 8= 4 Fi. 1 TONS 28 SY G A A Type pf Liner= Class)Rp Rap 6= 5 k. ```ite \ ,-m -Y_5-FROM STA.68+38 TO STA.69+50 LT S tie4Vh� N.3 DETAIL 52 r' •%p.if&A._ m- C PROP CHL FENC CULVERT CHANNEL IMPROVEMENTS _ Imovi, �� �� �LOGAII %1!. I�kO► �W NATURAL GROUND (Nollo Scale) ''-: ^ TEMPORARY IMPACTS IN ►���`.r �1� ''��^'�%iriiiw����, ,�'%1%��1► i„I I EXCAVATION cuss n ck,. P •=14010l481:��1I1e/l'�IR-:mpUri%%%%b "._ RIPRAP(TYP) SURFACE WATER ��i►� ""��%%:� ►.� 7/,%P�ib%6%����►, PW,O e �� �I SPECIAL CUT DITCH DEPTH:24" m t10 �I%fp//%%%y%�A 36 ���d%:,1:� - �uau�g:�ylriii► /— W/HINGE ?, —RCP—III f•1 ' y't. •v —��-0.0011-011 , 140giii niiiy%%� GEOTEXTILE TYP 0�4�{/ 85�s�rrw��.sca�w�88/8M wr�80%1,41, L A� �,%/I1f70ti%%%/ %�, E�AI 7� I 1 � �ME III_ YLr. ....wrrt •1f�b attiou'i,.M;., ,,, , c\ \F ... .lani.►....nwi...i ar■:- �1 �% /// �F,.., ail/%III%//%//�%%ti 29.01%�%�'�00go'/il%1 FILL WITH NATIV — — F �/%�00%011111Oy%.11 I, BED MATERIAL INLET CHANNELAFL• .y %r-%%�+.%%��"'� VARIABLE WIDTH BENCH - — — /�w�/%%/%0k losio/�f,////// 0-4'@ 12:1 N • 11110%y%///%%� VARIABLE WIDTH BENCH H'N EL � \ \ ,y + o. 100%u% %/- 0-4'@ 12:1 EXCAVATION U O e y:'M* WOW UPSTREAM CULVERT EXTENSION NATURAL GROUND m SEE DET, L 65 _ita = ,_\ ksa- HL__ X 1. ; i' LENGTH=41 15" ,� 4, RCP-IV 3 i �. REMOVE JB � ��\f _X REMOVE DIXX X °��` \•_•'coREMOVE a • a ? ti REM q -- � — A%•a S GEOTEXTILE(TYP) Q� �� — �. , -n. ��. �� �. .e.. .ter e — BED:CLASS II RIP CLASS II 9'X 11' +_AP WITHOUT GEOTEXTILE OUTLET CHANNEL RIPRAP(TYP) (DEPTH=2') _ n yT V . -Y S-STA.VC' 0+45 LT QNLET( - - .. rT� - - '_J - -YS-STA.71+60 TO 73+25 RT(OUTLET) � TT \� \ A I I — \ nn ,n n IMPACTS IN A R GXGGXP DETAIL 65 NEW STREAMBANK SHALL BE TREATED 5'Min. 1' 10'BACKFILL 10' FINISH GRADE (py AS SPECIFIED IN PLANS SURFACE WATER TEMPORARY IMPACTS IN EXTEND CHANNEL BLOCK p Mxx.of z.o e5rox0 IxvERT Flow "� (BANK STABILIZATION) NON-STANDARD oFEKI6TIX6CNANNEL :, - - .MEMEMMMMMMMI cn REINFORCED SOIL SLOPE SURFACE WATER I„�Ew.� ,,j` ' ,2tt, ISIINSET (RSS) W/I.5:1 SLOPE INSET { aa�K:<1! CLASSAI COMPACTE BACK ILL° 'D M P 1.0'DEPTH SECTION A-A NIX. MIN STONE ID LENGTH' 19 LLI N UNCOMPACTED a > - rt\ \ 0 BACKFILL = prill \ L TB 2cI <� BACKFILL EKI6TIN6 COMPACTED MOTES: INSTALLEDrtirM I CHANNELCHANNEL IX ACCORDANCE MITX THE TB2GI—A' IV _)a E INTERFACE BETWEEN EXISTING _ mow. A MINIMUM of z.0 BELOW THE INVERT _C _ w '-'.� .. _ EX END CHANNEL BLOCKK <� „B0 MUM OF 3.0 BEYOND THE LIMITS OF THE G= 0�6C== ---�==2�- =- 10 ,railir ' a� EXTEND 3'BEYOND LIMIrs SECTION B-B <1 a H 8�I W W ii OF EKIGTIN6 cnnxxEL EXISTINGSHOULD „p„EF THE EXISTING "'NI "112��::2••�"•1:�•1.0 r' `y i�•�w�w �- ,_—�� CHANNEL BLOCK THE ALL ERO SPEC FI CONTROL TINGDAND LYAF ER E PLAN VIEW 5)INSTALL EROSION ON ROL MATTING AND SEED X ACCORDANCE H ��O�M�STEROOK.Stalli v� ��iEM 1►:a '�": t� - � � B)rxMPANTdB,M7t2ITO`N-1211TPOMINEORATrTHe o gto..; liont0- -�=�===41�-w=14 Iui funWA �� •a �/ 'i NOT TO SCALE ENGINEER. CO cr 1 MI / jlIl ICI?. �-.'.�..�,1I�,�. PDF �_._ S�//�0 4. II' DETAIL 54 m �1 _J� ' -_, PIPE OUTLET CHANNEL STABILIZATION r '� PD —�J5 __ y ST NelroSral.) EIN°Wald ////// SDURFOTES ACE WATER IN a Gnund / E P�o a.J SZ NON-STANDARD `t° &' Length- 3....) '/ IMPDENATES CTS INEMPORARY SURFACE WATER d T REINFORCED SOIL SLOPE „: 6o5,- alai>�°a= 6I5 I IN°Ge°� I•, -- r1 -Y S-STA.83+65 RT C (RSS) W/1.5:1 SLOPE -Y-S-STA.94+40 RT " E P \PIPE OUTLET CHANNEL 0 _q STABILIZATION V \ SITE #23 SEE DETAIL 54 ' 5 I a DRIP RAP \ NC GRID NAD 8 BS$1 TONS 1 50 25 0 50 100 o IMPACTS IN `�� o SURFACE WATER GRAPHIC SCALE - INSETS �,' (BED STABILIZATION) 0 US) PROJECT REFERENCE NO. SHEET NO. NOTE: PER COMMENTS RECEIVED FROM NCDOT ON 10/I6l20, JS LINES HAVE BEEN MODIFIED ALONG " 1001 Morehead Square Dr. � I Suite 610, Charlotte, NC 28203, 38/98 I9A SITES 21, 22, AND 23 TO FOLLOW THE SURVEYED TOPOGRAPHY. NO RIPRAP WILL BE PLACED IN NC LIC NO.F-0165 RAN SHEET NO. THE STREAM BED ALONG AREAS OF BANK STABILIZATION. — AY DETAIL 13 ROAEN IN ER DESIGN HYDRAULICS RIP RAP AT EMBANKMENT (N0f le Scolel 10'm Geode INSET TEMPORARY IMPACTS IN SURFACE WATER GEOTEXTILE Type of Liner= Class 2 Ria-Rap C RIP RAP \1 ULVERT CH NNEL -Y-S-STA.69+50 LT DOCUMENT NOT CONSIDERED FINAL EMBA • MEN 11 IMPROVE S DETAIL 51 UNLESS ALL SIGNATURES COMPLETED CHANNEL CHANGE SEE DE i\IL 1 � � SEE DETAkL 52L• '4' Nanas�le, HAN b �. NaNml I�-- NI Ground x'r] 15Ft. CLARIP" P d D SI<a< EE •�� T°IL 51 ��j CLASS II RIP RAP -- Gairolt Min.D= 1.5 Ft. CL B RIP RAP Max.d= 1.5 Ft. '' ilk ,,,,4**--or ` -�`r B= 4 Ft. �c� 1 TONS 28 SY \ ��''` Type ofLner GClass1 Rip-Rap b= 5 H. �� ��� jui -Y 5-FROM STA.68+38 TO STA.69+50 LT �� � �\ ;�10► _ �� 1 `�• 4, ,°►C�� iliprif DETAIL 52 /` /.\\\111 4* `-- I T�\ PROP CHL FEN. CULVERT CHANNEL IMPROVEMENTS ��_ .\�a �, rl♦Yy _ _ �► _� (Not to Scalel . 4 TEMPORARY IMPACTS IN 4 .� A H NATURAL GROUND cAle fin► !, -� "�! t .i ► 1 i.. ,,,I.o ExcAvnnoN RIPRA n SURFACE WATER et 1�� 'M'�R-- �w1 titr7►, e��y,i�ri�► �1��► p 4 SPECIAL CUT DITCH RIPRAP(TYP) \4�y%/t:I�NB����\a'AtiyyA �'♦♦ DEPTH:24" • >y • �������\ .r/�4iiD��h\ a�yy� /— _ W/HINGE •,�♦• _ R 36 a, �f;' ��'���n---''q���•�/ .���/P�iiail�a \� �. T A I �� X1 �¢:%..: ••�,1►1 —�j�/ Xlq�y�EEE��1 6�' y � D E R11tJ GEOTEXTILE(TYPJ ������� O �i8I►9 ra���wm�a��wA6�i�%B/i►I►� I1L►S! .� ���6lllyylAflll)l�/�%%�r ^:!..., i 4 a1i�i1CfIiii ���REI��NA/%liq: '' l�%� , —\1 ti/'„iIAB 11i11I11D�►s�,/� �\ �P ���Nei►�L iI�r�wow��su■= �• pU11UU11110�/11�Ll�! C �q� 29.0' ��I16F1!l���@A1.V �� FILL WITH NATIV �1: `t1/,//1�1r1�i�/1C�1111►!s_ �t�01/�Wll(��11�yt6�'. BED MATERIAL y y y I �I�f,'1116Qiwo ail INLET CHANNEL VARIABLE WIDTH BENCH -�F0:I IN ai., I VON, 00%I 0-4'@ 12:1 Oa- � �h����(����� I • O 5��j1Qa►'i����'�� VARIABLE WIDTH BENCH �y H` - �� \ �, 1���ye�• .� �' 0-4'@ 12:1 EXCAVATION U ti�u11411 Att 8��e,, L- . UP AM CULVERT EXTENSION NATURAL GROUND ii, S E DET' L 65 ""til'1' IV HL 4. � � �I„a��,l� �� LENGTH 1' - E' • F • �t/iA n, •._ ;EM• , �I �1r, ' 1�1ax VE DIX X 1° _ _ _ GEOTEXTILE(TYP) "l♦N Y� - _ _ ;� _..�- ,...�,`�®„ i��.�.. BED:CLASS II RIP RIPRAPCLASS III ciII. . -- --_-- a'''IL �F=1 ■ :O �1\7- aoremwild _ WITHOUT GEOTEXTILE J - _ -_-- ,` ,- — �_ _S—: r• - OUTLET CHANNEL (DEPTH=2') --- Se8 -��__--.,,,,.. - y...,e-.- _---- vw -_ - - -Y S-STA.70+45 LT QNLET( �` - - - �� �6BB�"� - - - — —��� - -V5-STA.71+60 TO 73+25 RT(OUTLET) 111—�N,YIYIm -_ . UOxCONPACTED DETAIL 65 NEW STREM BANK CKFILL 5' IMPACTS IN SHALL BE TREATED 5'M1n. 1' 10' FINISH GRADE ✓(� AS SPECIFIED I.PLANS SURFACE WATER TEMPORARY IMPACTS IN EXTEND CHANNEL BLOCK �_ P OFNE%IGTIXG CMA MEL INVERT FLOW '��'��, (BANK STABILIZATION) NON-STANDARD / ir� � REINFORCED SOIL SLOPE SURFACE WATER ICCEw.� •:::j< ��4;.:,aZ'': Z�. 1 INSET (RSS) W/1.5:1 SLOPE INSET { M�K=<iD ��qg T BACKFIELD M ...JrIX 1.0'DEPTH SECTION A-A GTH WST STONE 19 m Lu ,,1 -- MEI ce -- — — UNCOMPACT' > _ i BACKFILL a ____________ e. MIMII' �� TB-2 C 0- — BACKFILL _ e � � . F �R� EKIGTIN6 COMPACTED NOTES: BE THE E vy- IB _ CHANNEL Q' BACKFILL 1)CHANNEL BLOCK SHALL INSTALLED IN ACCORDANCE WITH a - i _ge0 __ \ z1 BLOCK PROJECT RBE INSTALLED AT OGATIONS. E INTERFACE BETWEEN E%ISTIXG -O _--- AMili— __ _i� ���_AMP �--_L�� - D PROPOSED CHANNEL. 9)aOTTNMLOFXBL A MINIMUM OF 2.0 BELOW THE INVERT L _ _ ML �1 EXTEND I NO C3N BEY NEL BLOCK OF MUM OF 3.0 BEYOND THE LIMITS OF THE =�:=��._ -� ra �o eta ��° ;,Qk _ ��•�� r't`aF oxD rs SECTION B-B e)EBLOCK XISTING STREAM r 7 OF E%IGTING CHANNEL TEXOXAGMIXI . ��it•�� ���r.44 ,0Ws° sK P .���f _ '- PLAN VIEW WITH �� �� �-. 8"WW t�_ �\\,� _ 5)EXISTING STREAM CHANNEL. MATTING AND BEER IN ACCORDANCE ro �2 iYwt ����n��t Fp' ,i - '� '.--_�� �:i "'�_� CHANNELL TO E%TEXT POssLBLE oR AT THE DLRECT10X OF �Yr>_�=1,t� �lo� S460 ►:, iEr�►1R•' -- �� - \ ` BLOCK B)TMoxru'eniKFiiclFlcnnoxs IWM ER GRnDIXG. /52 0-, -mm-r� :Ai"� �JN C1'ii �• i _ �_ ��� E ENGINEER. / ��- fi C4,::' 1C i \ NOT TO MALE M co;k1 - �L`[� r ._fir a--11. y Itn 4" CO .� P� �xI'� rC D4181111011_ B • '►►\ 7_ _ ate_ DETAIL 54 _ 1�� PIPE OUTLET CHANNEL STABILIZATION ��- Norb Scole /// rWATER L=1= ` JT l�� Natural aced DENOTES IMPACTS IN PU' v\ =A c — r�C �w I M E -'' I �_�raM—. :a1e. ` NON-STANDARD CM1anne1Bed °°" DENOTES TEMPORARY i' „ rrrT i ST I REINFORCED SOIL SLOPE T,• L...- <i�lai>�.-c.. ko,k4 IN00NOONOHl•, IMPACTS IN SURFACE WATER T E #2 2 ,� ' E P YS STA.94+40 RT (RSS) W/1.5:1 SLOPE \O> r I ,wii-, JST BOUILI TEON ANN• SITE #23 �-w'j''"--- S E DE AIL 54 DRIP RAP \ NC GRID NAD 8395 BS1To I 50 25 0 50 100 N OM IMPACTS IN ` ` SURFACE WATER o GRAPHIC SCALE - INSETS (BED STABILIZATION) 0 US " S I loot Morehead Square Dr. PROJECT REFERENCE NO. NOTE: PER COMMENTS RECEIVED FROM NCDOT ON 10/16/20, JS LINES HAVE BEEN MODIFIED ALONG SITES 21, 22, AND Suite 6/0, Charlotte, NC 28203, SHEET NO. 38/98 /98 23 TO FOLLOW THE SURVEYED TOPOGRAPHY. NO RIPRAP WILL BE PLACED IN THE STREAM BED ALONG AREAS OF NC Lrc NO.F-0165 RAY SHEET NO. -- INSET BANK STABILIZATION. ROAAY DES EN IN ER IGN H N S GINEER u, CULVERT CHANNEL i�� Q zz o / \ .-y REMOVE / d-- xlO\\ \ \� IMPROVEMENTS�ND SBG 1 REMOVE CB a!\ � SEE DETAIL Z BEG'SFB& N ,�, I o LU N ce\ \ RET.rvgll +01.93 -/ _ __III / �L-- — I T,i ' / '1111111 — 4'1 C&G III `w -- 1— / \ Milli I M L I IMIINmill hDOCUMENT NOT CONSIDERED FINAL _ �� xTTTrTF I' UNLESS ALL SIGNATURES COMPLETED a'� �� �. _ R -IV CLASS II RIP ' ' 'I � ' �2G1 (840.37) ��� i •. i- i� e, .�. �l atiz psi ( •�,,, p Vr_,r.,i ,,s w x Y [sG.z�� ,driszkfs tts _s T U � l `��ifi��c�� wi7 _,left( 714 : Al Rs t �`�\v�` F ♦♦���ZT ���� G !II �Z Z6i 07Z / ,i1i�♦ #_..& � w�� !v rim d�Z� . o� Ss3 ` ♦. F� .�♦� �♦♦♦•�♦". i'1.� .��zwi. b,- 'N wiri l Akiiiniii. V,4IF 4 ati.. �fo,libiiiittpliriiiii i1�-♦e w•• _ _ - _ `, tP�s w o-° ►. �%• -i- ♦•" �♦@ _'� �'�i.'"w , r ♦, s �♦ r. i►. ��1 � vo •\ w/F fir. °o ril %<A'.+'_wz aw':•4♦-$7 .�. ♦1lif f i.- ,, i♦ i 1 1��i aiii <<��!iizi ,�Zir♦ ri i!"Z'`. /.��CB v ,it-ANA i."'1 .il,v4...0 , w - .,t ♦ ♦. 1.' �Zi •KI=?'�71'�A. w� 1, ♦ /♦i♦ 1 �• SSB •,... !♦-.4♦" e< ♦-d.. • •,fir ► ♦ ♦. �., �, ...," . w. ♦.r_ aT,>♦.� A . lir •♦�"��,� 7_ (� Ix i� isZ"�:i�Z��•w� Z� ��. ♦'�' ��i�°►� ' ��.afR:zaS '�►•,�.;-a �� � �.,.p ��_G ♦ ♦`z1 t ..0:41♦.. ;,,-..♦w""woak�{I .l�[ _ .. 10-A.- .yawu.�--.. -Tfi�.&,- -4 ('4..-l��ve_..ilt--...04 �� . FF +87.5 .'1"�� _- �, ♦ -��..z♦���-..- .4 hA� �'c�T 17^�raA'/� 4�F 0y,40..O�z�Lw♦. ii11 ��_Cw7."Ali,..��(E �,tr," ,,two zG♦,5 �,. P-II?!! / N�♦C�i♦�����'� �8 a1�i�i�:�♦�al''�`e♦ ; ����� � �����♦♦������♦iZ�i����I siii���'e�eT1��1!�r_i:'�Ipf ► '•�II��Z�c1�i"�����♦�'�k� f��w� ,I"� �1r (e] ���♦ � le z a ♦.-�Tif ♦4 4C� 4., _- „ ,, 07- T map: ♦w ♦►file e__♦,t w -._ - w 1 _-.a..p•4#44�1_41,410�"�♦ - 3 ��.♦�.. r�♦";�i"i,"��"Z" ♦ � �t�►� ♦ ► 1 1 N : ♦♦ ♦♦" SEE DETAIL 53 6 `t1044,64,0,140.144._ 0,-04 4♦4!� +��R!+ a 0. " .0�4.z4� -40,'4i�► pt-0.40-6 r14,44-iE ��-44,44 / �. P ♦♦zip P 4,0,•0.0.,,0!A1�T! . i,.4 - 0-40,01,.�.-ovi ♦•.zz1z t iL.�!► .dL!,...,♦��.,:. `i Ir6 _.. ,..4..♦�,44 +2 5., -Y9- Q. Z�tTiy♦!;44,♦0.4.♦�:..t _..4v t,..0�� ,100,�,0100-�4.4.♦4w♦♦���!rwri nwispro..,,�-"'�1�"r���i"w ,p j r , ..44,,�..00.♦�♦♦11. g4.52' LT ." C )ppop, ''livVro♦1�♦.r41-AT- w„♦VONIIA �r mit .♦p T40.-♦Z"♦00 Z�♦�40Z."�4-,♦1"♦ 1�.♦, ♦41 R1 4�� �444,�.�14�♦♦♦400,.�'6" C&G- — - TRU BEG. 2 6 e40 M�.1�;P..p'-?4 iZ.,0 ...014�i♦♦�0.♦♦i44 ♦♦.0 j 4, ♦-4�14-4 ►1►♦♦♦.. 4- ♦1�"��Z 11 alv- I .44♦"104I 1 ♦♦•11 o♦"�� " � .1401044.T♦1..� �1�p-p��."���♦®►♦.��1 i1��i"♦♦1♦♦1:..�� i�♦♦y1"1�11!!:��: ""♦1�"♦Z♦_a♦�"�i 1�i� 1�E1.♦!��t,�♦�►�i"1♦♦�;a! �_� - - sNl RLE G&G +87.5 4:.4♦Q�♦11 �♦♦1-44. .- -�r♦pfic,�s..-♦44,* •ir ♦�C-.4 .�...- ►4, "zT41i♦1��z-4- Irr%-4:. 4♦-/►is!♦ ,1,�♦1- -0 - : L 3 9' X 11' BOX CULVERTS ' ,0.400.A4-iii_r�' -444.141♦!♦i" �T1!"44i1�14♦4*--.�.��� i♦!"_i,i4;t.w.- ...00, u�i�100 ♦♦,40.-♦c0,41'11c-ip,44�.i w - 1 •t40f'1►�1001/i111 `♦��1��♦ �1��♦1�i.I����•♦♦♦♦• �i�1it1�������11.p I i1icRl�/11 �n1►���f'4•jiI!`1♦j����1 ��Q�1 i7♦i11*6T♦`ry a ayes e (4' M T L SITE #22 SITE #22 BANK STABILIZATION INSET SEE DETAIL 91 24' C&G 1 ;/ W/CLASS II RIPRAP ISEE DETAIL 91 I ,_I - _ r G,l (8•I 0.37) \\ ' '" '- '' 1• ' 18" RCP-IV 2G 840.37) v a 18" RCP-IV apt. _is we0'Mu _ -AI- mw • i ..-- � � ,� - P�r RAiMgilAM Tarai' �A �Rffi MMAM�ifis� � GilAZI = -ikM7= f.,— mi �- �.i � _.� } - � � � afINI ;: a ar � raR� �a _ *-�R ."�2 � � � •i ' fr r � su 0_I � �� � �� i �� �w f-te��� � �•�mo���� !������Wyl .fd� a������.i- , �atfv= e .� S � �w_1 •R_gaya �E,M, ry-������getr_��J,�MLNda��_t `,�-� � .a ,..�� 14E- �� � .ZE� . � # ,.� f �d� � �� � _. �41ya-- S�i at�� —'flC• — f..i, R , ..--_ ,- — z0 ,,.�,,, . .n��aiY1m��1wi�.�—_ iatMMaugA .. —t Mai • ffir rr 'Allier' NI �i - _ - �. r.� El I I I I I r r •�l! Ti � �> sr �"�' P. " lit ,fikIP rr r''' �: '�' •a 1 �� �� 1, M l _3-1 m m rlW,vy mcm 70 -� yu,1111 } N a6569' W ml =IIZ Z BRK \\C) A. aT 4r MOCNYl_PHREVOCABLE 65.69' _ y_•_�y� " ` m oNy MOONY & Z _ - �I WALL CNY CO-TRUSTEES - - - -AB �__s_- II - IM lit MFO /R EIP N 04°46'19"E I e" CURB c7� 0 �, 7 a 15" C&G ( 6" CURB v) l =N ,o r�T -o I �� I N I s6.or (� = f� o �> PUE Pl F za L 0- 1 ,h M DETAIL 52 ' Np- 5 CULVERT CHANNEL IMPROVEMENTS NC GRID NATURAL GROUND (Norm Scale) //// O EXCAVATION CLASS DENOTES IMPACTS IN O DEPTH:24" ,. ___.- -0 / SURFACE WATER p GEOTEXTILE(TYP) 10q-o_ / ' (// E tiW / o 29.0• " DENOTES TEMPORARY N FILL WITH NATIV IMPACTS IN SURFACE WATER BED MATERIAL INLET CHANNEL VARIABLE WIDTH BENCH VARIABLE WIDTH BENCH 0-4 @ 12:1 DETAIL 53 DETAIL 91 0-4'@ 12:1 Sheet Pile CHANNEL CHANGE BANK STABILIZATION EXCAVATION Wall (Not to Scale) (Not to Scale) NATURAL GROUND y1 Proposed N. I Fill Slope Natural U — 2 of Sheer Pile . 1'ON t rkt. CLASS II RIPRAP wall Ground O O�4't ?7 4.5' at 1'iFt. SLOPE PROTEECDON 1.� MIN.2.5' TN WITH GEOTEXTILE Vie•„ MIN.2.5' 7 GEOTEXTILE P •l 15z, F� SLOPE PROTECTION CLASS II RIPRAP (BRIDGE ABUTMENT) (TYP) CLASS II RIPRAP ON STREAM BED Slope Protection 16' Class II Riprop Exist.Channel WITH GEOTEXTILE WITHOUT GEOTEXTILE) To Ex.Toe of a BED:CLASS II RIPRA CLASS II P (Bed m be Restored N WITHOUT GEOTEXTILE OUTLET CHANNEL RY I Bank to Pre-project Conditions) .. (DEPTH=2') Slope=0.3% (Na Geoiextile) 50 25 0 50 100 in �m -Y S-STA.70+45 LT(INLET( -Y_S-FROM STA.73+25 TO STA.75+10 RT -Y_S-FROM STA.75+10 TO STA.84+00 RT ■ ■ ■ 0 0Ln -Y_S-STA.71+60 TO 73+25 RT(OUTLET) N GRAPHIC SCALE - INSETS M 0 US " S I loot Morehead Square Dr. PROJECT REFERENCE NO. SHEET NO. NOTE: PER COMMENTS RECEIVED FROM NCDOT ON 10/16/20, JS LINES HAVE BEEN MODIFIED ALONG SITES 21, 22, AND Suite 610, Charlotte, NC 28203, 38/98 /98 23 TO FOLLOW THE SURVEYED TOPOGRAPHY. NO RIPRAP WILL BE PLACED IN THE STREAM BED ALONG AREAS OF NC Lrc NO.F-0165 RAY SHEET NO. __ INSET BANK STABILIZATION. ROAAY DES EN IN ER IGN H N S GINEER cn \ \ \ CHANNEL REMOVE I �l k Oa z o I +01.93 �� �����1�=I. i ND SBG' N I WW1—ainui : 1■I�I I 0 n RE VE CB ���� �� ETAIL ZBEG.SFB& W V 01 .: 111 __��•11P4��� ram` — — — — T i�aiiI �����t��WW1 4° c&c s II `n _ 1� ��� = �� - ��� Egli ILUJIrr DOCUMENT NOT CONSIDERED FINAL IIial1't�� - _ Il11II[ -, _ == - e.i vT7" .',�� 1 JG ` . Z 7e ,�� "-„ — ---— �- - —==— == = - - - _ UNLESS ALL SIGNATURES COMPLETED 1 I_ R� to 2�� E••_.. �al' 84Q 37__ �ti- sr�' G y��� s �;1��R �f` c•��� ��f '-\, eta \'y 1 vjj _�_ -_ = =1,. � Aril Alitt.o,. ��.♦• � es��� � a����ViO�z������41, ' /, .-asl�.>- 1tietmizti.\' ��a�l.E°.1' I IlI ,iI � r ti 9�g 0-. ��i xt 0,140.Q�.:.-; T.1 1:4 C0 4 SS'. �,,`r. `S-- '(e a- . . `_ S . - ly�''A�i t�, . ir��v{� !_.��\�ni�ap�T a �!ci� 'ly P-ate t L _ S �O,;a4A:� i ti R "4�' :seta»�eK4V 4 \ S {i < _; %linAt !� :- e t " ao ..__„ r . i�- ♦� -'�$,.l = g �.._���iii�' ®vim i-VwP . < .�,. r: lu s�._. ,— :: 3i% � ' ,,• -744,4,4111 ... I \.'•�., 1>� .. 1%G vlta a sit t _ ` t ���� '(y n.ems. V ryt a ��4. ice . <� w i a.-� E;"♦ 6 , - •E'I �y �. .lkiiit�' 44Qf n< �.<�.ri �.s.'. - ��x Q= r as.< •a \- , .'2-° _ t - — _ _ @t;.E • .Q1 �& l� Gsue.'' 'V a .`� aR �x2. 9 y L � �..�,�� _mT7 • . , .0"v 4S ,5`;7.�.-����16.I.- 4�' 1 a2 11<�4. j��r �-zr � A.a .rs7bs F. .-ar �71� ti=-��9 X 1 BOX ,>.�, o z < � �. � .��_. t _ _�- _ 4.3. — _..r.,�II irgki''�.NCai d A �. dim ,3, 1nr rid, . �.te. • vi..,g_ Tnlgr���.a�i�v � y i�i j:.✓�I����G���A���.i��!. .i_r_),R w��011�IL.�_��� � � •iI � ��"f'�z�i�� ��i '�j �n ��'..�'_ ��'_i :�i-_�: � �� �� ,�i�z��^,��_�iZ�z�/ �f�s'aS1R.8Y.A._-. �11���..i�r�`i I SITE #22 SITE #22 BANK STABILIZATION INSET SEE DETAIL 91 _ - - ----_- -- vg -I-_ .�."�'�a>•r�r>.: ' %le 11t. 011Cfra���• r_ IdaC■- .Yv':avR= Lt`^"�`'yri l'ima_ - _ .n - 1 sr ,. �Z�•- 'i111;RMWdrrsts .-feeMr7 1-46),=----.. ,- �4XrMI: -;ter r ' ,�@'-i ri�N M7eil T r- 1f'1 =GI S - -isffi•MR IM ="124 ,�.=6A a -_i��.- 1►j'l.'LVMiiratt a�_ .-ag,-�-u - �.�'�,'- Eiro'il'--. • i.riM = , sa;y-1 !r b. am aataaeo slt � -tom . -.�I cs-ate (.' a�� -', m. ,-,��-'e'_aar"��..�.d� i_�_ - -.... 0' r-, .4,�=?i J 11� ins; •- - � . .-..-. — _.- _.--..-F t -,-�. -.Mn.. e- -_ --. mar„a->.m. -_-__- _- _- - a- g- ..t_ _ _ _ :Aerr .401r41.1.7 obL a ems_ _a- a ;— -"-----------•--.•---..-.-.."-..1..-..I; EO N 04°°• ` a 5 11 ��� 6 C I R B © 355.07' j • ,e �F �I tro,to xr I •- _C O' 47 co to M DETAIL 52 ' Np--1111.117379 5 CULVERT CHANNEL IMPROVEMENTS NC GRID NATURAL GROUND (Norm scale) /// N EXCAVATION [ cLASSII TYP) DENOTES IMPACTS IN ODEPTH:24" ,. _ SURFACE WATER p GEOTEXTILE(TYP) 10,66, / (// E ti� /� / o 29.0� DENOTES TEMPORARY a FILL WITH NATIV IMPACTS IN SURFACE WATER BED MATERIAL INLET CHANNEL VARIABLE WIDTH BENCH VARIABLE WIDTH BENCH 0-4 @ 12.1 DETAIL 53 DETAIL 91 i 0-4'@ 12:1 Sheaf Pile CHANNEL CHANGE BANK STABILIZATION EXCAVATION Wall (Norm Scale) (Not to Scale) NATURAL GROUND y1 Proposed N. I Fill Slope Natural U - 2 of Sheer Pile m 1'9Tt. 12-14' wall Ground CLASS II RIPRAP 0�4,� '27 4.5' of1"/Et. SLOPE PROTECTION 1 MIN.2.5' V WITH GEOTEXTILE F Aii!..• MIN.2.5' 7 GEOTEXTILE • ryF� SLOPE PROTECTION CLASS II RIPRAP (BRIDGE ABUTMENT) (NP) ', CLASS II RIPRAP ON STREAM BED Slope Protection 16' Class II Riprop Exist.Channel WITH GEOTEXTILE (WITHOUT GEOTEXTILE) To Ex.Toe of a BED:CLASS II RIPRA CLASS II P (Bed m be Restored N WITHOUT GEOTEXTILE OUTLET CHANNEL m l Rank to Pre-project Conditional (DEPTH=2') Slope=0.3% (No Geo,exkle) 50 25 0 50 100 �m -Y S-STA.70+45 LT(INLET( -Y_S-FROM STA.73+25 TO STA.75+10 RT -Y_S-FROM STA.75+10 TO STA.84+00 RT ■ I ■ ■ 0 OD -Y_S-STA.71+60 TO 73+25 RT(OUTLET) r- GRAPHIC SCALE - INSETS M 0 US A = m g 59.Da w' ny x - a �m h R6a` " IPROJECT REFERENCE NO. SHEET NO. �.. o� , m z »� „ vav"� _� 1 1001 Morehead Square Dr.,z ro 2zsr3 m s° ti m m ° /� Suite 610, Charlotte, NC 28203 1 38/9B 20 O N "6,92. -e a\ > " m DI w 1 // NC LIC NO.F-0165 T NO. _— o N w0 0 ��, Yu o o � A o ro o o _ _w 29 VCP._y N OS77 66" 40 m ° s w m 15.RCP 4 P / p ROADWAYDESIGN RN./ SHEET HYDRAULICS g 77.66' wEk ANrr n C0 / A \ ` ENGINEER ENGINEER \ 88 7 SE EA\ o�_ m 'P 9•E i — EN gyp=N 04°I2'S' m> p 3571'' \\ I®� A ea I D '� 40'PRIVATE ROAD R/W® ,E N I. II 1 �• Q'rN044_12 07"E 18'RCP DI "•- -� I��,'\�(7 z I I,,•/\ K 7r Pvc� 6395 s 7z'os'sa'E ,� � � Ih Is cac — s" Is RCP 1a•cac s e'VCP �� � \t le 4 I NC GRID NAD 7115' \ ��, `.Tr-+ °' w �1p 29,R P a�GF s8'VCP N 02'5200 E o15 VALIANT OR 22'BSr ��u ��\ i! �'f � SITE #24 . � ��� �. �Y � � &, _2 �5'C&� _ � - � � � 5 7�vC�= m 1'1 Z "�T \_a P��. <j /I///� - -�+�, 40 PRIVATE � N J Z N 25FAPT o N .''m= COCED 30 RCP�, /8, jO -04'1300'�E '1, /. 'I,R�S. /SW akh 4,g� S Ir, �n 'o' F- I� ICAI- wm �.'DI�D Oe. F e/* ;. Cpoq'G ����/ C � ^,�`.•T4p*3,q.2)S knsd ?�m !-� 2•PVC WILLIAM R- AXLEI}Fy s pz4°ss�\ / o a�a �O 5 � ` � o� _ iF* 3o • 0 I 1_0 3s < RCP z/ e Jk e'. s e m > a- M� o, ti�'N. e\7�3s• eca �������s.v�� ti � ��Jvo s, �r 4,\i- f�s,\ p 9• �n . 6 i\�. y h, I. f oI? (w " \ \ �/.'' p', ta. v� �7x� * TODD ELLIS BUILDERS, INC. o�'-�,ya� �� o°� 2 p h �• 7 PVC "\ ^CHESNUT COMMONS '�o.f 28 s7 ,�'( +?�\c� � 9`sQ , �'9'n1V/0�.9 , �a22ve,iF# QL oo/7,c? °' - • �, e. `�h i \.--_o DOCUMENT NOT CONSIDERED FINAL o pf �tly v o ) , 8ST h 1. :' y o 4, 9q• O - z .Nod 2 ItO 3� C.P'<,O 2 '�C'✓\\C` G/�- /ti,' `L 2 � Q t.:a� �.� X --__ `_— ——-- ''HOMEOWNERS ASSOCIATION w. N• oo 7 N 4.j, z s A�o v ,� J �\ I"' h • �,,„ a oo ry° J��pNC Qo 8'vCP a ti�l _ "- cR \__ UNLESS ALL SIGNATURES COMPLETED h O 0 2 i\ �q'1'C A 2 )In r /V m , , Z N r hhhh ' �� o J �72'PVC :' CONCs7. O ag i-,� p'ky �0 2J O 2.2'F9a'\ 48 CONC I r �S.x#-26 c, c, �,.o-a "' II N'`' _ D NOISE WALL 4 X 300'TAPER-- O �� s, o e ♦ � N os I oo e ti ho es �e r ° +3z.t B°WO RAIL X�x 2C C C 2 24 0 231' 6 3 A O 22. �� 12 55 E� S O ^> 2 \ w J* \ \ -X_�X 48"W. RAIL o� \ ut N N �CO 4�p 2 9G> \ o .O J•"� 'I'C` O ,,r'vt■. Jg N q IS SSG=— iF y 14 N 02 S• O �1- s O,,44 ,, ktl ',ii __� 73 ,,,* ti -72'PVC#' 9,..9 NJ m . S,*is SF4p O 24.j'•� j�Rr ss 9L�i 044,-,, 4y 4 277°3 24 13x 24 6.44- _2-..&'—• pb.,c. RETAIN C'GPe` O 2-7 o +17.�4174:1`'.�� ti \ \ r w •�" ' •_ ` ! Il.AIT ?8 S3 sFf' 2 ` �� og 72"PV 24.64 24.25' S3 r>i°` • o. CH( N T:112''.E �S•59 00' W a N W /• '• '4r �� 7 2c O9 b �• 0 0 oN 27 0 24 13' 2SFO §• TO 72••n" -'''',7`''' /2 k J"CONC 104.00 DI o C r' CRETE DITCH _ o' •b , '" F9s 4o C 72PVC - TO P OTECTION ' BE-INDRETAINING WALL 2A • I -X X X � 16 TP5• Ct1 A RP C ' 16 TONS'1:•v: � s'2g 0 ONC APT oo; 'kEND 4 WIT/`CLASS 1 RIP SE-DETAIL 83 BEHI DgRETAINI WALL 2A i�9 CONC `Do PVC.off I RIB• O (� X 22. C\ \8' !'oNC CN& : ND�NOSE W H T �I CONCb4 C ONE 2795' P;n "ti SAP �-6 SEEDETAIL 95 I SEE .,ETAIL: 40001 wsnnlc � EX GG FT�_ 70 WD / 1 Cy �� E DETAIL 55 ', .., s�II 0 coNC ^ l J �04 00'.�r . I /Y� ' z"CH _: , 7'CHL i _ �C :.I..0 a S �I- 78" 1,1.,� S 04'13 00 W LV OISE WALL .229A� F e_•RH ___.. •, y _ _ _ C .mn9 X�X n y W '��J _ _"f I'gtrANUOUI "-' i�• ,..., - 15 RCP III LGI C PxIsnNG R C - X x_ N S77 �1 -_-_- • SFB W/NOISE WALL •... _� - w` 99��ww IyRW POP WW C 24"RCP-IV W 1 1 6 ' . 'RCP-IV 2 0 18„.CP+V _ . , - - W L W/SFB C u R 2G�A 24"RCP-IV CP LLB 18' RCP-III v •v GI 15' `" • t FENCE •, C IV s � RFMOI��� �� IB CON a ••^ N ,;inGr it 1•.•7K _,: 'EMOVE HW NI = — _ — T — ' — — — '= T_ --- _— —L —_ _ � � l — — N �I ..-..-A---�.Tmr r..`\.T tyrrAit- - p 24"RCP-IV - �z Q� o - -_ SEE SHEET 20A 2GI REMOVE 2. --- 2GI = *Im — W �_ «_ o =I r > K�r-,D� \ -. -r 1 ' ti17L r T .r'"" _ to t N 0_ REMOVE 2GI O �" - - - _ - - MOVET2G� S r -�C®NC.. . - 1�linlari _ - - - - - __ - - __ _ - - - - - - _ -- - - - - - - I � �1�7� - _ T _ZGIT T ;c a_ -L - s ° T_ �Id 0 = — ---- ---- — o� -- —REMOVE{-1F Z (4i REMOVE DI �� v, O w ` PLOWABLE FILL s ate 1,j END SBG o' �I ` .•. . r BEGIN G.R.W/ O BEGIN SFB - '-- ----` ---_\ - k, r...., "+50 z -Y/"..... VIAL+9n N'_ -� -z • . MTL '—-- T —` ' MTL Tx -- V' -- _ 15"RCP IV - N �1* 580 .. ,...RAa �1N 1 - SBG W/GUARDRAIL' � TB 2G � a'�' O Q 1 RC'-IV ' Y. *TV 15"RCP-III REMOVE JB vdMH END SBG �l�,T -O '��`� ".7! .7 66" 2CP I SII��i.B w,MH 48'ww _ F 98 FE8 4 VC REMOVE �� .� � ���� ���: O X46,w _ :.- 15"R -� _ / REMOVEX 1I �- CL B RI' RAP � ,o 0 0 _ ,- O (n F RETAI HW A8� ----_ r` _ _ F __ r� a . , --- -{ III .• -B _PR_OP_CHL FENCE 2 TONS F d— - 5"-IEP-IV 3 `�� -- � C S II�RIgPR�AP- -A. - --- 15"RCP-III II 15"RCP-411 -- -- -- -EASEM.• PROP �/S//�� Vii," REMOVE GR 0 r��o_ �• E • E SE- ITCII4 ENCE CF � F_ y.� �•4k DB 2151 PG �' I CU • n SEE DETAIL 54 , .. . E O �'• �✓ DETAI �/ / / /1 \LLI �� r T�� 1 STABILIZATON HANN=L PIPE OUTLET STABILIZATION AGE. �CT �\ BC,GID • • //' PP)'+ j / / \ \r. s SEE DETAIL 64 u J ` II INTERSTATE DEVELOPMENT COMPANY _ " Y -. BEGIN\5'SyV \ SU ., CL I RIP RAP CL I RIP RAP 2q 55/. / \ N = STANDARD 3' 24 TONS SEE SHEET 2 OA I 26 TONS "�!�'/• kQ� END 2'PS / BASE DITCH CL II RIP RAP A C :� ' 2° BEGIN 2'-6"C&G \ CL B RIP RAP \ 12P,, GR \ I V SEE DETAIL 86 I 35 TONS 1 V REMOVE �'��� +50 5 TONS 14 SY W o 0 S `S ❑STING R/W I�Ai •✓ e (: i' I -,I s <AMRY, ET AL. 0 m ro m Js y' .y° 1— TIE TO EX.DITCH ,, , __ _v_ ✓y. ` W/TAIL'V'DITCH f CL B RIP RAP y �:��� /SS JS \ ��, / SEE DETAIL 77 / 1 TONS 5 SY w m !S _ - .. . _- ✓y. •1 , s SPEC ECITCH UT I /I/ / E DETAIL 97 \ r / s ST ro / ,\- TIE V'DITCH TT SEE DETAIL 77 DENOTES IMPACTS IN ,,, + }� co INTERSTATE DEVELOPMENT COMPANY / SURFACE WATER co 7 I / DENOTES TEMPORARY L PERMANENTWW / //i�� '/ IMPACTS IN SURFACE WATER 20 \\\ DB 2ESIPGN542 CMP36� / C ® / p ' El PIPE OUTLET STABILIZATION I / a aW/CLASS I RIPRAP SEE DETAIL 64 // / c L1 -, I T N ,? -Y//- -Y_S- I 1 a) P1 Sta 12+82.67 P1 Sta 18+66.65 Pl Sto 21+31.23 Pl Sta 107+16.73 / '^ 0 A = /6°28'00.0"(RT) p = 4r 46'38.6"(RT) A = 36°23'21.4"(RT) A = I°47'49.0"(LT) °•I ' a D = 4°30'00.0" D = 19°45'00.0" D = 1/°30'00.0" D = 0°10'28.9" I a L = 365.93' L = 211.53' L = 316.43' L = 1,028.69' I N T = 184.23' T = I10.7/' T = 163.76' T = 5/4.39' p I R = 1,273.24' R = 290.11' R = 498.22' R = 32,800.00' - . ST -°1 g I ?In SE = EXIST. SE = EXIST. SE = 06 SE = NC \ h N/I o2� DS = EXIST. DS = EXIST. DS = 40 MPH DS = 60 MPH s''r . I 0 I 50 25 0 50 100 o I �I, i1i11� '.1' / I,: �� GRAPHIC SCALE ��L\ eo = = Ritraljn _ � ���IFPROJECTREFERENCE NOSHEET NO��� 9 ' Ti 4P Sut NC reh NO.F-OI65 203 r No20 p j IIOOI Morehead Square Dr.,ilt �. k y"� �`� "� to 610, Charlotte, NC 28 38198 �� gyp.. '0:•2a �Nl lip L�- O _` - o -� '�� Jr ROADWAY IGN RAY EE HYDRAULICS hyr 8 6411111 1, �Zi'S�s �� [jlRy� _. .;. - dD -__ � -_i •1�' r"— -_I g ����/___ ENGINEER ENGINEER // = sigtos vii 8395 �111161 o' E`1 ��t_ `,r1Ala R �R��� - ,— -•�.� II ��ia�.S� , lit. � .. E N RID NAD l /�1��� �IZ , E! cc �lif,• No4'i3oo , AN p es be. � ✓��- ' `I C G �u �� ��� I m "s Is ca. I i2sz © « A !''y��?�;� SITE #24I. � '' _ Y=� �yG& - - - ",�APT o■ T 'I u, 1-/a o �• ���ji� -=p ks•;^„E - ;� 0 -fiCMf *,( a iv`T - N, �M 'ii E �a �`s � / 0, ire ,, 1,, . �// 'o a �w •� "— _s •t!e.ti 9mI� E LIAM R. 'XLEV il �YI! ��3p3 RCP Pam . 5 o•pS�o�/ 10�28�9 •*�C{� \`�i. �sT No c0yT'n�' ' 00=0,**. IP~ '� '.If 4' V� \ # 1r if,/1'11�; iC+ 60 4g.. iF'6 R. ' _� :; � �B, "`'�l/l^\S, W A. �92 � . �*'c�a 2� A �• Tc�D EL,IS BUILDERS. INC. �� c,2"0Q �� 2. l 72•PVC t� •\C/ Li tic 9.2 O' c'��` c,- /"ati yF -i, y t, - __ DOCUMENT NOT CONSIDERED FINAL OOES UT COMMONS 11E'wl o i �� �i-�_ __ UNLESS ALL SIGNATURES COMPLETED OW RS ASSOCIATI D'• 0 ?4j ,a**C i I.�D�# co�A ��,c%��,� .. ` 4'., ti^SV t �o4c : . .NC' Qcea a VCP�4,7 y�rrder, ', 1 k-_ _ _- ZIB (' S ► / C L 2 .P 2�" �'6�\ ��98" ,;i}2 ` ,yp�?• • 01L'7� _ - 11 _�pI ( e9 Gl L�.J . , (S OC JO w CONC �O 66), p 0 FrF tl Ville r 1-T7:4X 2 '�t77 n71f j •� c,, 4vr N 12.55 I �, ''•;l. B5T <k RAIL I At:�C N'�p" ?� +p3. 2 �9� �^ �s ?3'-� p,,,c" 'il'.#a�� EJ S�9 O o h t ,/��'Cg �I . p� .;1 DXRAl �'C CpNCa5,._y ,J�f�`�„�sN ?.2.,�W, �,, ftsa Q UO c8, ETAIN .a. i _- � ALLI O ® , a �' SDI �`��1 Rr �L�T@a 04 27.03 2413 �6 ��. �sO Vti• x �� \ �. r c• �j ?g IIs g` 4. '24.64 24.2s., r�U G CN oz 300"W 77IL, •— _AlL \\d .il/ 11 S n .t0 O 5. 4a r�(•�/�{ , J�.� N 04'12'49'E59.�� �. NIIIIIIik \`IW /� 1 ` r•ly' i�9' F�• J6� Rf29� 0O72°PVO O@27 r �'•� y . IW48'CONC104.00'X--�1 Il1�I' , ��• ~� •` 0SVp�raA -. O qspC. 72^PVC24,3 2SFAPT o 072 , `O CRE �1^�i�'"� TO:P&OTECTION CO2 X `" :. �� :` 19 y '7 8 •T1C'ETE'V' 0 24. oPVC +1 WIT CLASS 1 RIPRP X WO w .. _ �r� r ONC CONC I� a;0 • HI`. LL 2A o,I-n , _ (�'� � ��' �'��� ��,�" �N8 Y IN. NOISE U���>�CONC64 ONC 2C95 "/�i� \��- SEE DETAIL 95 a 41 xls . XP.GU � �� HST �� E DE O ` g..; .����„� ONC �,� \ �= J I �04.0.' �, I �� � 4se ,. Z MEGLLI •a4r3 C / ����� �1tiv �vs� • �r� �.� ����1'1 -_ 13 _ �• / IL,',..--!_--w2,..EINM,-v- _- ,;iw. .s.,w,/z,,•..,:',1c7•eii;iiii ----,, ,- ,------ ----.7- --,----- ___- ---...-•"- - am f 111 lalW_L.Lytfts!.11 111111 P III _ n''' w -_ - - ;`_� • -_- c .�+ �� aF�'. y �� . �^.t,/ -.�•.c� EIMM affeer s, �p5 i0� W SEE •SHEET 20A `EMOVE _ ��� ,. B. ul 4... • NIA- o i�r— j�i/� � e , I/ "MOVE DI 4A I ' __ _ irdritir M■��I-_f1l�IS�1ru�aa�____ E � O .. `. :a+ e_ • — r 'c— ��. �- _ter �E •. '� _� • o �"' - ,e... ,...a•!„• - - �� . ,R�,..+-..,_mac -� '� -" � -, R 15„R =•ar'► � �- _�i far^ 7�l���y����� ��y/�/�/���i�f�r7,�� �r p.��"' ����nv��- _ (� ETAI _ - � - 11111 y "Ale - 44 7 EA I _________ oa .../ 'NM�v� 1 Sr DETAIL 5 �� ��� ��q( . 1.0 IL ���i'1 � � ��ai�y VW s 5 ii J -, , L I RIP RAP ♦_ 0:6;o: D.V .0' .• `-• �� 7V • ANDARD4 TONS 2 SE DIT ��� �5 ITOINS�P i � ��� �►�� � 1 :0• I V S: DETAIL 8. � ������ti�� -"0 •��� �\ r --kN),\.\,.\ '' I I- P' 1::, EXIST � •C I� � (� �����i � � � � TJ -------\ / "2,,, viiii ,._,,fr T T• E. � ' - � � , ' ' ,',)Al liki S. �I W IL 'D �/407 av � 7---0-7 RAP r ilpip 1 } ._ ,it SE'D -L 7 Y Aiim _..--lii.-:••..-'''' ------------ ----1` ,.....,:-N•Ao'. '\,, Art „ie.-liavitTy �, ski ft a � � *01: wo/ulll° � TIE TO Er, C. 4 tif o SEED L 7 N �. tiotmem WTAIL DIT c/T./// DENOTES IMPACTS IN /// SURFACEATERM \ I' E'S E DE OPM'NT a PA �\ D 1�- Cj.fl ' -*‘ 'N 1 11 DENOTES TEMPORARY A� Il' 'ii '`Il!��' _ /i�� '// IMPACTS IN SURFACE WATER ..AINAGE .T .� jj'rr —V 17 E. PIPE•UTLET STA:ILIZATIO : a .. oiririr v W/CLAS I RIP: iff aI Oab..... ii lik F 'N r _ • f C _ _ `IMF -a I C . /►''t. +8 P _ • l8 ...65. _., (RT 1 = �C�Li s ��Q1 �.�+ ��� 1 v4, h ( '\ .„):: I = - 8 88.0 I - 45'10.0" % = I'00.1 � y�.,c• \ \ ,/ - = 3/6.46 'k 8:.23' i T = 76' � ) ,,,. tiiiti, 7., •1 498. 2' t�:i �0 ,, , $T o %S EXl T D" (. Ilk\ �' /�! ��'e ^ *, 50 25 0 50 10 _� � \ /\ „ �, � / �� GRAPHIC SCALE " N I 7001 Morehead Square Dr., PROJECT REFERENCE NO. SHEET NO. Suite 610, Charlotte, NC 28203 /-5819B 20A NC LIC NO. F-0165 RAN SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SITE #25 INSET SITE #24 INSET JB w/MH �i 15 RCP-III - SEE 70 i2//� T0NC dt JB w/MH ZCP—II - ,_ 9 CL I RIP S3p3S4g„ �� i� _ - z 8,ww \\ �16 TONS 1 S Irc minion - - - _-- __._._. . � � C ` +5(�. + F H W � i .� 15" R_ _-11J � - - c�► \ A • 119.69 ---\�_/ TAT S U '0�\vi • 211 HL GR i'�r\` \�ikkatp C SS I I RI PRAP ,�.� HW _ — — — :� �� .�w/ rrnnrrr�iiii/ rnl�rrrrr4rlrrrri.::1//IN/NM/NIINN ,����`��, SIN 04W Tn T( — C � nmrmm�nrn///r//iNrr// �n�// — - - 'r��r`��'►� - S\ _ _ _ r }�• PIPE OUTLET C HAN N SFB W/NOISE WALL „ nnn I STA B I LI ZAT I ON �N _ 15 RCP-IV '� SEE DETAIL 54 GI �� '_ -� SU �� II C L I RIP RAP E HW �°n \ 24 TONS \ CL II RIP RAP T T T T T 35 N N ' N S 25 iq DI \,--,,\ 0-5 TEMPORARY IMPACTS DETAIL 70 IN SURFACE WATER >_ 'CO N PIPE INLET CHANNEL STABILIZATION co Nc GRID NAD 0 (Not to Scale) Natural Bed o Elevation DENOTES IMPACTS IN o Natural DETAIL 54 SURFACE WATER Ground Natural o Ground 1.25 �" / EIe;tnio PIPE OUTLET CHANNEL STABILIZATION a (Not to Scale) Natural Bed ��/ DENOTES TEMPORARY IMPACTS IN SURFACE WATER Channel Bed Natural c (3 FT) Ground Natural E) Length= 12 Ft. Ground Type of Liner= CL 1 Rip—Rap — Keyed—In (No Geotextile) —Y S— STA. 93+79 LT 2 —2/ a E > Length= 22 Ft. Channel Bed a (Variable) Type of Liner= CL II Rip—Rap — Keyed—In (Banks) 25 12.5 0 25 50 ;,� Type of Liner= CL I Rip—Rap — Countersunk (Bed) (No Geotextile) 0N� ` ■ ■ ■ o GRAPHIC SCALE — INSETS Nj°a =Os " N I 7001 Morehead Square Dr., PROJECT REFERENCE NO. SHEET NO. Suite 610, Charlotte, NC 28203 /-5819B 20A NC LIC NO. F-0165 RhV SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SITE #25 INSET SITE #24 INSET �.—r,_�— ��� m o `A� ti •� �►. r 70 12//P Nc wfMH »� _z limy 01. S Dilitu*4: ''.1 ,fr ?(D 111111.. ,IM.Rt , � ��-A ,,,T 15 RC -11J c N ) 4 , V D// SU . . . � boy � .....riwA�,ilk � �' .,Imo'+-�` �� �.T�_� ���• 1./11 "Ti_..,..-T �,�1�i�irs�\, - - — . �� J/////1// //I //III%%11111/11%11%%%%I`II%%111/ molt //% I\��'�� �I���\� 4 , r �1� 11IU�Iy� Il - 9 �,I��Il1ri1\\\, t a �����}�.i►••.�.— __ (KI J— PWE %LETCHANN SFBW/NOISE WALLD 15 RC , °�' ., \ S— U - ° ' S 'E DETAIL 5 _ ltiri fi w %`;�`► L I RI P RAP m i ►r I L to■.'.' ► 4 TONS • \ . 4 LII RIP RAP N tk - 5 T E W'" s Sf 25 _c TEMPORARY IMPACTS DETAIL 70 IN SURFACE WATER >_ ' 5 "' PIPE INLET CHANNEL STABILIZATION NC GRID NAD 2 m (Not to Scale) Natural Bed I ElevationDENOTES IMPACTS IN Natural DETAIL 54 SURFACE WATER Ground Natural o Ground �� PIPE OUTLET CHANNEL STABILIZATION a Elevation(Not to Scale) Natural Bed ��/ DENOTES TEMPORARY Ec lss IMPACTS IN SURFACE WATER 7 Channel Bed Natural c (3 FT) Ground Natural E Length= 12 Ft. Ground Type of Liner= CL 1 Rip-Rap - Keyed-In (No Geotextile) —Y S— STA. 93+79 LT 2 _ / Length= 22 Ft. a E > Channel Bed a (Variable) Type of Liner= CL II Rip-Rap - Keyed-In (Banks) 25 12.5 0 25 50 ;,�o Type of Liner= CL I Rip-Rap - Countersunk (Bed) (No Geotextile) 0N� ` ■ ■ ■ o GRAPHIC SCALE - INSETS N°a L''Us FERENC' . / SITE #8 INSET `��GP r NV11) .d;'6 1111N0• ,1.7,s;,a, Me=Na EB/96 I=a E� 1 Q/ 7 G' J+y G� O J�1� rF100'4 — 0* F?" TC' ' O o��0 MATCN(lleft 41. s�S 6s°y��ti el 14 • STA • It �������� ����� ry �� SFF SHF �5�00 �� �����0 •.�...w�,�•�,•�.� .•�.o 7 LINE S S PS4��c f. 0°.� 1�1 . O. p Y RT `� O 9` h A. h�Lc/ 44 v ST SEE SHEET NO.10 �, �\,:ts.t?s,iik`7":: ' \\ \\��` =a.o I�It ��1'�4 .„7 1�.41a �®® PI r• `,�/` ® P+ 4 �J � / ,, v.— , T....-:: ''' ''1'.%tDiaki ' -1:7:11 ,11 ,_:, il lot /07f,#4,I:,,:(4'; ' ,"7 - °- c'.4.'44, _; \I\ 1 .7 ‘vi 11i!alit iii®rill.,. � a/' a a aE9 I ��, ll l l�ll lI � �°� ���: \k p o o° a© o �' �� SITE #5 a .$ s r . // �f } 7— ,G� j o o ipo R �� L au SEE SHEET 22B �♦ �� \. - y" _ /// _. \ 4 ci�� l ;..,►go 4;,e�• �' -/ as �i �� 15 RCP—I ,\ � �� i21 I'�441k if ►����1.�1,�� i ipi iiit ,:. , / PLR.. , 7.11,40/4 t7 /I 4, I 1 WG I * ' ls,, .::•:..::::......k.,:-...:.....•:•......:..:•:.:::•:.•:.•::.:„ pr,,OV4... A .4 sc-Aike:It .'41,1 IN, I kl:W v���� ���� �' , irr+i \", '. °1 s� L l 1 l•'jI I c. �' Pa PARTNERS.LSO \��. :64 0• r SITE #4 INSET n\ : • UTA Il� 1, .# / .a .,�� �a,� � _ .. +���ti� a ��:,�::a1 =` I,;� I � a!'-% ©� ° \,�'�� ����'=� �I •. \` 0:'c�'iI' ,a_ I of l l O a -rRPDO- �� ����� e� f r r l ///y� L>. Pl Sta 14,2403 Hs Sla 23+T430 PI Sta 26,439] Pls Sta 29,0394 Pls Sta 3049594 ���� �=�-� �jj m 1� r'ss 1l1�■�I 4-�ilI ,`• '� �£;Sa 0-23d02.3,RT)Bs=4'52'55Z A-2924IIOfRT1 Bs=4'52'552'Bs-4'5]08.4. `r��-��� -` I M.\ t...ttll 04 or ., j N 1 f I/ �1 yyy �' •ark:•• /ry © L= 92.8'I8' Ls=149A0' D=6'4d' Ls=I44Od LT-96 4'' \ -� --1"-� I .4 \ •�•$�•• • • �.�{777'f// •. / (#.41 �.. �� 3 0 L=3928d LT=%DC L=43364' LT=96A4 LT 96A4' *�� 0� D or /' �_�! \ �� •; I a T=9.000 ST=48A3' T 22IJY ST=48A3' Sr 48A3' .t �.������� r ". •::• >'P�{ i/ / * ©a R=9NC Dd R-845Ad '��������� I : \ \ • h�diy� r a s .a. E=NC SE=06 ��:11.0 17 �c \\.'.'• ��l,,,, .•I I yi I • _ fl OS=50 MPH OS=50 MPH �...1 �0 I `l. 4a .. e SW,� I// I ` 41 *g PI SIo II7*6863 YRPAC- Y' -�� ���\ • I •l $ `i PI Sta 79'382 7/ l =fir= �V 4 �'' "4 d 11 1%s.r. 5Z'l53.6.I p l3'19'8.5- TI \� �� +I,II 11 4'r a a a D d29'536 . talk. .M. - -\ \� .-��P il Ij �. p'�� cL' a a L IAI4.43' D 2l4'48% } Y' ��� ���� • 1 / .fig o a 0 £:+ L 59315' ,� ���, �1I, �%/ L� a a R=_I5I500LV' R=25550LD' �. 1 M Ts/ .' r .✓ ��� Lfl SE- C SE 09 ���� �i �A �ytJ� �!/f 44 A „:� Os wMPR Y' ���������1 1 yfy/y�,�` ��S�I i'/��• l a,e�, a a Y1T OS 50 MPH YJIT YRPC __�-�=-�-; prOfi��A\r�' /�«�, a Pls 5/a 331+]38l PI Sta 334+8661 Pis Sta 23246232 PI S/a 23549232 Pls Sta 20,2504 PI Sta 244669] i:011C116�� +' 0'��;_ I M. 1 l a Pia Sta ze+srA3 �����=���� r {{ VVV �. *� 0,=Z3.r 419• A-8'29438'fLT) es r54'355' 0=Id0Y59TlLTl es=457'08.4' A=5037'2491RT) es 45]'08.4 �------�-, .. r �r�j•�L 1 v��� Ls=18002' L= 44.82' ' Ls 23334' D=/5.34' Ls=I94Od D=36.00• '/]' Li rs"' �,�� LT=IO2' L 4 LT-/3334' L 5253k LT=96D4' L ]3 L• 457'.•;... �#PI 7LS '`• O I€^S•; NO'eL carvairy `�'•: //��'' /�� I / rill, ! ur DS=50 MPH DS-50 MPH DS=50 MPH • !'►4�' I t \\ rvsaoqanprM[xl`•+` ityLF"L± � ' '� / src oe.r s_ ,� ,6— a15�" RC-P—II 15" C ' A ''\\ � 1� �iwHc. ������ �� w � `!�"'�#1 SITE #8 1■I sM ` CIS r �. rs* \\ ::.^ IIII '/1 '1iP /fru, a QiaGRAPHIC SOLE-INSEIS \ FySEE SHEET 22B ►/ F)) .' �/$Yam.€` "�\'w `:®u,., - _.,o, ,14i + /� / F// DENOTES FILL IN ®' " \ o / . P /// WETLAND �� lli 11 u. ,l, t l 8 \3rW1, �\ _ ,, + Y DENOTES MECHANIZEDNIZED W aA. "SITE #b x Y rvR��,a, _ ., �yl N s" ekrvrv°�g,l I �' �.9q .9.Iq�f�Yl_� II „ p+ ` / t I �` F DENOTES TEMPORARY ' L %//// FILL IN WETLAND `bo DENOTES IMPACTS IN I iI % `1 � , ,.�� �/ sNUE u ure\ SURFACE WATER 1 I 001 n *cam • e i 4 N ! �' h /%�/\ \ ✓// DENOTES TEMPORARY pl / ,. �.=rK= "�, i� '� 41 0. , •qt ai ++46**� / ' , '\ \ ��° /, IMPACTS IN SURFACE WATER F'SS V DETAIL IS E. / Alm` •a�d„ i q ®sy� �' +1� 1:Ia��yi_� • SITE #7\\ ,, i II,:i i.,'1 re. .:kit t ::::,.. L .,. ; 4,, to., 4;,...v.vo:. doom;lirl* ra,-- ---,c,---'-':- 13, n Oro HUNE T wir.ji,://:4�ftV3K,.. �� ' �. 1 \\ \ a STA.80 00 -YRPAC_ S i/ \\` a\ ;:o:it a Ncl r, s SEE SPIFFY NO.21 SFF SyFFT p NY S, rifle+` . �i//j 57At \ �v�� a . HI �O•21 \ �= _ o a Nry a a o,� // v / X,al' i. e(,tP ST "l I) s.;',2 iiC'rvo p 0, ;md wo:el 389B I sx22::o. SITE #8 INSET ` ��� yy�e1 // spy v;1ry o /II �pp�h o��0 M �N( „F.4f ��s X"sO. / ;x x° dl.� AT NEST �. yFFyF• 9 F. �: r r S A2 �"'iGf. .p r� S P'p`�`�� � ��� ����° �r F SHEFT �5+00 �0�iio �'�T'o C' "� LIN S'C '< NO1 Y RT � iii��i� R O9�' TCH E 2 O , /ti4 1, �4 �1t d .� % i ..�...A«,�.�,.�.� .4. � TA.669000YR C � 1���34w��/ � "N� � ,�' lr1' ii%��j� 1��7, � �ii vS SEESHEET NO10 ` 11 ��i'!� C G!It/ aI �i� ► /l1 �i��� ' :'./ I e �� I ( - sl/fin. fitl �� �:;♦ �%/jai%j �► ,,,�. r• -,4/� illr a.....e„,,,,,,, �.I�. ;>•r,�� yeys / /:,�j�j�! � ,;-s - a/ '' _ v • c� � ���� �� 4) 0 :yoitsIrrsr'",ZL:k,r:*1:11:::,, ,.V�\\., � ��1!�i � �I�/�d ' .%���� � �sly�� ° � ) i e/Q /� �%��\I � ;` ,\\\ r�jl�! 9g21:ft f itoritr . .0r i ����=t�" % ice �` * R ►� �� ���� , p III �1ls io / k 2G' �,...1. �a✓ �47 ,�al ' 1 � ° V.1 i".�J,/ .arc y/j� �` µk�°°°y°* �' II 0 4 ifr �r�® SEE SHEET 22V ILN I k �F �. j` : F3r� �°R — ` , ti�i�+'�� ), , 9 0, : 4��0��`��r 3 ,° ,t " O rr � :� :�•.,`� �l r' � � f�Yi-#'ll� ►��� �/!�f o, � ,� � Ti"y'j 1.�� ;°� yip �ij� \ :b..•' C•,• 0./� J���1`�'�/I.Q �" - Q104'l {sY�,': �y",/�, � Ak* ,I.•0 .�FLR.. i 1i�� ��. rsrpl,, . ���'t�vs�r� N, ‘,, _ \ �i1 l Yr • �� a � .—! ��� b? /P ... -°_••.•.' :4 `.:•:•`fit• :,,,p.-+!i0 0 , roy�. 0d'` d ','h, rq' v A =4 y;'� �� ���, & '%: 4 �� � �� SITE #� :�. '-�+ � �. er7,j'/, '�+� i7f= ��� �y /i. •' 'A @ � � '�'y +�` ``p- , t � PRE ���/ �ti �. 'I 1iVl4ld �� -"411A a.ii1 ''9 ��,! 'll a. ° 111 a���;' .��� ► , ' �o ,fd�r "" iliirl 4. : 1��� © �//�J/ JJIItJ1.�'JJlll/!/ ; - 9 D ; , �� �� '���t .•°'. •'.' !► i j :Y .Ii �� J I ►• L.. w ��III ►rjrf, �., �C •s• a/s os sa 4. i C 1 �� ����p'��� g �`�.. ®• .`;`:•'- ••' �y1� .y�lp�v► �.�'°� ����11���0� 1 4-4l� ��ar�� l�� c °"`°`v -�•I �' . it1. �, li{' r Et7i91-Ili;II ,��/ R. i,_ ,tom =�����= � It • •� rdr� fj 1, 'J r l a �I � �._� 0 � ��'���•,�,� �` \Q.t• � e�jtf��>� pr TA �tl � n� ;NSF o;;„:,.:63 ` I �• ��� ������r \.4,•a i ,�,y�/1I r ���� 'NI 5 �+ o • zla MC �. ��..�, z` ,� *try/�4�/ . �;:��iOttk ., ; �e: )>r� ° OS ;� O D M. ' '° \�� 1 .- .4,./ f j5� ►• 9 ' / � � .q�/38l r, iqq..6 p ° E'7iiiiii7D+25D4 QPI�24..v�. isSf01:�+•.4��, ',� �\��'� °��� .11G1�� O�Yr {����,�, ' ifr / �� • � \� O.s : ar. ff ' :� -6V'���������■ �I ;: i sir I m�, Rtt •� / �/ f iSPCD3������w ���� � �ls''A�a �atai �I� ,��p��Ir d 9r �� '� lao r s :rla:" Y sss'.� cfis�or'�����i�d�' 1 �L % ` Ta��i a ���i�� A /j 1 fis kddilt di, 1, e <r s �eos• 1, k Lp ' ����io .�' �� ��:•:.116 :'�'•. .,, _.., %.T ,�E� > `1!S �� ,ems (,/� ) I - ,s r.. :lises�.1-, „ ,'' 2 01111toNAp �.' : >:••• • {'� I �. Y� �I� ! 1 I��I: :. ,' y�, • !� � V J y' ems• 45l'.., ,y51'08.P -95 1LT)Y' ,������ �■t���.l' ;114 _ `�'.ye fl,l �N�•� �iY 'h'" �i" �;� NY 'V. it 144s:� @.'•rD `5.'r� �i�ial" ,)1 a I� + '/r/ %i p�4,� `�+1��I.F9i J i ! =aa•� (.4,- , . . "p�� i SOSIrc_... awcA' 77• l n II .� .�J�I'i T► 1 \�`�Y\e :"tifit v,y)111 I81 A, %� , t fr/iii WH TM p ..�11����1111�r�PI !li II a IS n 1 \" ii:.,NN1/4. 4 s�t�sia�A/ffIJ � (;, �/�� /^ , 1 4 . t 1. 1l" f '. -la1 , U 7 1.-J GRAPHIC SCALE-INSETS / ,).) pliotib:46. �.* t. SEE SHEET�, it , ,rl�� (if r f/ Qj�V �� ��� oeNo r ift, NOTES M,.R h l✓ "A. A. yq ''mp_� L �i IiI�Ulfµ '`:.74#/ / I/ -• , �I o %�/ //! I�� or.s aoaAR /J IL,IN ETLAND .a. ' q i t I / ''C: ' /// /. �A �� :as't 0 xo r/// D NO IMPACTS f e1� itt I s Q /i��� ATER �1� 5�a a= 1 e./\ a(�i� /////���`���/� �/ /�' \ O �� OO ORq'R VV "�� 0" 3 �m`R,1/II TC��/ \ \ ���% FiA r ���IJ _ ✓ �!1'� a�`L��L��t °po 2}° �JS; •i��t.�a� ITE �� 0 o �, ate. MATC _ aNalll�.. llr 1 .4 �za 3 , t ►1 7114W\ \ Q c� �7 0 4 �o•. s SEE SHE 720 ? N STA.80+ HLINE- '♦wa� "»y, ,�, 1► o� 40.00 -YRPAC- STA. TCN(( � wt; iE.'1 `» �� a 4 pco,,,,,,... ET NO.21 F 2 FT l S a r p��I� 5 ,, ,� , HI SHE, NO 27 \ .ez. \� /��0 % O O I PROJECT REFERENCE NO. SHEET NO. INSET LANE XX� ) 1-38198 228 RAN SHEET NO. TEMPORARY IMPACTS IN ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER SITE #5 SURFACE WATER hr) WD TEMPORARY FILL __ I 401f1 0 Q' %T� QWD '/ ���� / ' , ic: DOCUMENT NOT CONSIDERED FINAL IN WETLAND . r �• e ie.:* ,� ` ` � ' T UNLESS ALL SIGNATURES COMPLETED 0:44,„ sit �`' �'�, (RESTORATION SITE) �� �� f '►, ' : -A ote, 4 4*AV. T .* lo fra 01 4' A�I► ' SJlifrir /14411°F;a4011444 :4140710 e,- , . .. .* : , ) -* larior AkT.* i 1‘0011,Pr 4 - �li � ; � ' ;.0,141#0411**91474 I4 � SITE #5 . .itI .. -* % i 11001 re4OPITA T Ijilt t T '' T T ► T - ' . I0„,- , :, : 1 . . 0 -0Tio..."r ITT � y4410#11,1 , 416‘. Y lm I ) TEMPORARY FILL ..* 4s'A' < 4 00°'' .* '* 4r4tr • ►. . 0 ;. TEMPORARY FILL ', . , i -, , r �, � �� OWER RELOC /1641 s I��i� �� IN WETLAND TERs� ' '' IN WETLAND ���;�;, .� � � ' MATTING FOR � � ,� � >I . ; . /3A, , 0 ' (MATTING F O R fiti CONSTRUCTION � � 0 CONSTRUCTION: ACCESS - BRIDGE T i ►, � ACCESS - BRIDGE STRUCTURE 10 � '" l�a OFWArroo,ird 1 # ) - I!�► ' 40 ' ' '* STRUCTURE #10) -o I �I t t y, x' I' ir ,iw _ i ,-* - : - . . ' �4400i , � WD N , A A A Jr: , .,� rAt A „,. . . * , , � , I f, � ,.,. �T .' PERMANENT FILL AND 0, J i1 I MECHANIZED CLEARING T T i �I ©��� FOR PROPOSED BENT (TYP) !' k7':- T% "Opt f -. ' Alettal A A" t ii,, , i ..n) , ' -* , A A. Afiii ei , 10A4tItjaltie 4% I A 'T 4 //� DENOTES TEMPORARY � S �� i ,� ; �* IMPACTS IN SURFACE WATER I�1�,�� 1� T � F j , DENOTES FILL IN LI� ��� 1. �� � �3 �� 04 . . + WETLAND y © ' \ 4q 'A T 7 I / * '" • • DENOTES MECHANIZED o + : : « CLEARING � Dv \ LNONEWET APODRARY TEMPORARY FILL IN WETLAND (RESTORATION SITE) 3 n, TEMPORARY IMPACTS IN N oY 50 0 50 100 0 Ul SURFACE WATER ` i 25 N r GRAPHIC SCALE — INSETS LANE "s I ) PROJECT REFERENCE NO. SHEET NO. INSET 1-38'98 22B R'W SHEET NO. TEMPORARY IMPACTS IN ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER ASITE #5 SURFACE WATER 03 440, TEMPORARY FILL ��� ,, f` ,4 - / 0 .. . i , i iw w:7 774111k ' ► fr �I I N WETLAND otit.,���0 �` 4,4,0111 -r DOCUMENT NOT CONSIDERED FINAL _ �, - UNLESS ALL SIGNATURES COMPLETED ► RESTORATION SITE +d % ,l� s '' Jr � • • r rtrei‘A4 �r �" 11� ►� . Iliim klikiiliON: .igra 0 it) ikteit#134400:49-41.Ilt��� � INr. FA440_frA s� itasertf,'' ,,dirApie�;Ordrd. - 44.44 -....,iimistiwo., N-*04,‘.. rardrirolikAft -411,, ii4 ,� � �'Ali , "Otattp4904:41 NV . -4ISPOAftAPAPIP :4#1, --,e-fitirgi . .14,*41;4.-4,ifitiritil4:4 iiiwororp '' ' � �► , Ao-epi . l SITE #5 * -0 . 4.,414404"-AwAy%. "*%-4r4r-rx,' '', . tr0;,; -, ,r/ ottair#41111 :, , a. T , or`s ee .i'i of#, 404$*nr-It°W1*. 4 - . . 44-miii0 s,15, . 00% ! likiLl % 41t l'Hirl I Trow4,14174$041.* i TEMPORARY FILL I < ,' -L .' � _��,�,�: I, 1,. s, TEMPORARY FILL '' �rr��. �_y �j Air IN WETLAND :* 6 ERS r 414/ © IN WETLAND * ' : 0" " `" y�' (MATTING FOR , , j44i!*4$ , w ► �I (MATTING FOR O '� 01# � CONSTRUCTION : : � � � CONSTRUCTION AC lbw CESS - BRIDGE, %ftSaAt l' 4 " ' iti40 STRUCTURE #10) STRUCTURE #10) - rif, i ,-: - �.� WDN Amayrt.--,„.. ;, PERMANENT FILL AND OF AO �I��,� , ��' MECHANIZED CLEARING N ti0 Itod al , s � � FOR PROPOSED BENT (TYP) A0044'' If1r 41r4i• if444.4,1 Al : . a ( .. , s soir� r _4-nolopt f 44r .sir. 101 !I 4 ,wicitoP:t400 , 4 Ai, III 't . 0 HAN zi.j, DENOTES TEMPORARY cj'-' ' *1 I� I�I ,*� - IMPACTS IN SURFACE WATER '' � o A� QAil F F DENOTES FILL IN \'�� ode . / / T WETLAND 1 * '. 1. 1 " 1 T ' * * * * DENOTES MECHANIZED o I" T ^ T / CLEARING o DENOTES IN WETLAND FILL TEMPORARY FILL IN WETLAND (RESTORATION SITE) 3 _ TEMPORARY IMPACTS IN N oY 50 25 0 50 100 SURFACE WATER ` � • r 0 UA GRAPHIC SCALE - INSETS " N I / PROJECT REFERENCE NO. SHEET NO. 7001 Morehead Square Dr., Suite 610, Charlotte, NC 28203 /-3819B 27 NC LIC NO. F-0165 E', SHEET NO. __ --- ---- \ ROADWAY DESIGN HYDRAULICS Z ENGINEER ENGINEER O —i— SDI i CONS MTL r- O r W m HW DOCUMENT NOT CONSIDERED FINAL .� -. _. ._ .. .. UNLESS ALL SIGNATURES COMPLETED . .. 2 - .. - N 8„WWX X 40 X Xt X N N . 7 .�� >"I T GOFORTH FAMILY " LLI I— °R IEVOCABLE TRUST " " Z PUE Q RAMONA LOWEWRISQ µ" �SN /-- r V SR N 1 I— y O GOFORTH, GOFORTH & CLINE, LLC s 7 f WAB Z TIE TO EX.DITCH I Ass - W/TAIL CH END SB WIDENINGRESURF. 9A: \ . . SEE DETAIL 77 _Y_N- POT STA. 205+15.43 '` w 720'MEDIAN WIDTH TRANSITION (LT) �_ INSET W 300'LANE ADD.TAPER o ^ I LATERAL'V'DBCH TIE TO EXIST.FENCE + W/CLASS H1 RID DITCH END NB RECONSTRUCTION 5`�1 RIPRAP • SEE DETAIL 78+65.43 +15.43-Y N- SEE DETAIL 87 N _` 101.06 _ — BY N— POT WIDENING STA. 209 50.00 RF 5�� I Lu CL B RIP RAP Exisrwc R/w LLJ --- x ..x-^SBGr•, X 1fe ffs.: e' :� + 48"WW X X x X X48„WW X- / s X �.ole; � :�� X— �X X � X X 1411 ���„W — ''WW •I '� 48'WW ND CONSTRUCTION ND _ iv►`� `ir#f. y W .. _ .. EY N—POWIDEN,216±79 00 _.---; I ��i���=! W F 'EUrem _TL\10 I` REPLACE CONCRETE DITCH T M ��\ T �TL� -MIL_ Z —�-t, i5:r--- r ■ -- —WHERE-FILCSLOPE-CVVCN --- T -- — 7EE� REMOVE HW REPLACE CONCRETE DITCH REMOVE CROSS PIPE X-CONCRETE --- -- EBNTRAETAR-TO-EDNPIRM-EXISTING--- 0 W I `O �MHERE-Fitt SLOPE-COVERS EX.HW - END SECTION /RETAIN RETAIN I-U y FLOWABLE FILL EX.CONCRETE SEE DETAIL 79 P/ PIPE INVERT DURING CONSTRUCTION �JJ, o x "�TRENCHLESS SEE DETAIL 79 d PAVED DITCH AND CONFIRM WITH ENGINEER I RETAIN CONCRETE CHANNEL I c 11 o Z�Jr-/-/_ ---- •o —INSTALLATION- RETAIN _ _ —RESET-GUARDRAIL FULL OF DEBRI --- /,L L _ --_ _�- - —'f /, �, -- L5— _ � ` ATE 1f _ &TL'L f i t 1 1. 4TL.1'J_ i1- - -—TIE_flJ U4131)_ _-EXISTING-- — N .v F :.,.. C. r� IC "I`� T uI T rT-R*°r- rT T y-� T. TT�7 T r eP NCr T T T T Tr Tiiir TT T r T TTEONCT T T ' TTMTL Tr T r T rT T MTL-T I T. TFS T DI T T.CDVf-. T T MT TT -F T r T rT T T r F- '0 '' , r c•. ` . . REMOVE EX.24"RCP ->_ CONTRACTOR TO CONFIRM EXISTING E. 0 i�1 / ASSUMED 18"RCP LOCATION �o TO BE RETAINED �w ,L. CV"),... 1EPC' — AND CONFIRM WITH ENGINEER I• - IIESO_FT DITCH Q _ /TAIL'V'DITCH . 1 ==� '/� -(.I OR I -CONFIRM tXISIING � =� SEE T)EfAIL a,AJ ii; iiipm ill plio• ` pl' INVERT DURING CONSTRUCTIO""—I _ _ _ ` NLLI '7,.ND CONFIRM WITH ENGINE•' .�- -"�"- - -� L L L L L wM=86�: L L L I SPECIAL LATERAL'V'DITCH < 48"RCP III�OLLR5"RCP-III TB 2GI ' agillinWAPI _ +50 SEE L < <— Q48'WW v 48'WW x __ ::7 - X X X T, y�_ _ `-� —CLF RAC ` F F F F 1B vrMH .j f � Ts Z TIE TO EXIST.FENCE 0,0101,LI-I Z c N _ I� �" a„ �•.eak 1 TONS 5 SY _ PROP.CHL FENCE 18"RCP-III _ f) >!/— ii•f f f+ - © �/\i o iQ o _ o Ini J LL.I r .,3 ETAIL 38 _. .•v^'.. �= w® .. .. .. .. .. .. .. .. . f7r'7'.T:' �a1�' CL:-R �..�- - '`7P Irk.. ���yA._ .. .. .. .. '!���c, W m 15"CSP ,�=,�." GL B'' C f -, m 6 TONS 20 SY f ` WO' fIri - SPECIAL CUT DITCH N I.I..I +74.17-Y N- 5 TONS 14 Sr 120.00'RT - +50.00-Y N- 98.86'RT 'V W/ELBOWS 20.00'RT- 120.00'RT SEE DETAIL 72 L N 1 f�\�� ' 18"CSP /\7� r Z PUE 'UE PUe PUE D,f,,;ll� PUE PUE PUE PUE PU .7 PU' „dELBOws PU"-�_ PUE PUE PUE PUE PUE PUE PUE 1 PIPE OUTLET 'o�n 4'BASE TAIL DITCH PIPE OU _ a - �- •ar + f f -Y - �0 520'OUTSIDE SHOULDER TAPER rl J 120.00'RT CHANNEL STABILIZATION - W/CLASS B RIPRAP SR CHANNEL STABIL ION . '- 152.89'RT e • m +15.4 SEE DETAIL 73O nl = 150.00 PDE J SEE DETAIL 88 SPECIAL LATERAL'V'DITCH CL I RIP RAP SEL I RIP AIL• _ OE PROTECT!.NS +•4.f -Y N- 92 TONS 127 SY H CLASS RIP'.P W/CLASS B RIPRAP 120.00'RT I I� V 25 TONS SEE •ETAIL 31 s SEE DETAIL 74 o D. NO DISTUR:.SIGN o a TOE PROTECTION 15 0. 720'SHIFT 3 720'INSIDE SHOULDER TAPER ,F. n - 7?0'LANE DROP TAPER E WITH CLASS B RIPRAP + SEE DETAIL 31 + 14 L I �j5 SITE #27 NC GRID NAF '5 Is"--- ,, 2 SEE SHEET 27A 7. a0g DENOTES IMPACTS IN RETAIN GOFORTH FAMILY REVOCABLE TRUST /// SURFACE WATER rl L/ ss //i IN TES SURFACE IMPACTS MPORARY S RFACE WATER Y U N 7 C U) U N a 7 a 50 25 0 50 100 0 o ililli � f GRAPHIC SCALE 0m 0.1O6 N O U \'-U 2U_o Ili __ " � I IOOI Morehead Square Di., PROJECT REFERENCE NO. SHEET NO. 111:7 ' ��__ Suite 6I0, Charlotte, NC28203 /-3819827 w. ap 1 re....-- 7 IL‘7 _ .� NC LIC NO.F-OI65 RAY SHEET NO.ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER . Va : � s :' .--L-- Willi DOCUMENT NOT CONSIDERED FINAL ! UNLESS ALL SIGNATURES COMPLETED i Vili LAWIfill 7,.. ,p- 1 GO'ORT. , °R oc. 'WR am oee I k , • ,N_____/ -„. ..- s9 � WAB N .---- ----/--grto_..........,,.e..11:: ._df_,„_t "Scagr,isi Z ... : Q4r, tan - TIE/TOIL'V'DITCH e CHD 'i Ill. D u, __Ari I--. DEVIL 77 111.1 _ •TH NSITIOy_L' 1,1; irilW , ' �T : , . w 2�, D- 1 1 = TI TO EXIST, Ir/ N6NAL 101.06 _ � _ 1" \��il SlfirLi I, y �� � �, _ II Z N1L1 III `S T�041W O9Or@4 l•a it . iiiiiiii �— —':c�� � 4 - )`� �'1%� �.15 J• ___1• ► fir_ i•��7 le: i' 7'r-.i� 1 .—�d73fl�iir - - s.anrc•1: �� ma 's''.- _ _A'.�A�.' Z �� •1—W � REMOVE H f � REPLACE ONCRETE DITCH � - � VVtN 0� `• � � A p LJ,J _ II♦ `V REMOVE CROSS PIPE _ • _ I® FLO`•BLE FILLA • h wvERs EX.HW END SECTION SEE DETAIL TRAE. L L� .CONCRETE RETA INVE' DURI G CO.STRU ION 0 f- '- HLESS DETAIL 79 -- PAV • DITCH�\ , D CO FIRM ITH E GINEE' '� RETAIN dire--or FULL OF DEBRI'\ __ A . ,�\_,-s s=�>.s1•zZfl B.wdmi.. ... „ •Y �u4_'+,,....-. _ _ _ .vim__ � - _ _ _ - - - �s11�� � g -02s._ - e,.,, ors'! !a•i � �S 1Y�; ?: ���'•:!�' sy..,._,,11..'. I� p :.���^a,.- l__7.,ii r.�-�i-i,i,:saw•—r=i r i — au�asi=•s .>,si_e.'�:o i ! sa uias-= s="'�r�si � •-511_r Cl) CONTRA _ IN yy ,-- MN � _ REMOVE '•' ��� ,, ° •�� •]CON-IRM E AMIE � iv� _ • 'd.��3 1 q . I writms � 31 P ANQ. • m�� a �-. _ e INED it13`IfAIT•T'CL�•7 11111 Q M M' I�c':� ;;__ ,.�:,..:.,Fa....>..., I� � L-11. - T�z r im I- ,_ �Ci..._ IfF • �l:ac•>!Y_1:.d:Tsa':nc[.71J ., .I� —-- — ��� - N N ,.n='"v�r� y cep'-w o, e _ _- =,,�F w m� - Aso �,,� I _ �. NW ii � �.sr- _Ari s .+iPR rfQ�.l�i!'\lam Z I--- l �fi3►' i �c , E�1L� yT•i �. , .c • Z � I � .�y��w�j '�'�' �..;� � �i, , '� • .r -r ��aw..p ,-„ilr�1 ����(�,h�I�!� r � _ '�•� �� ��I������� ��!��r w a� o-_ �/') ) Itrft"."0(...) kg 1- \ jISAI!/ I ,D J jib' \ E: ET • frirr R :„. IRI e - E,� • PRO ECTI _ i 2 1O,r 9 •N.• C Sl' W/CISRPL' 'ramn v • ,iE'AIL 3 SE DET"IL 74 �r r N ,e�� a ~ 1 ,O 'R• .ON `` "" C3 ��`1 720'A. 720'INS• SHOULDER :. .% ♦ _-_ Z,0'LANE D......ic.';__ q IT • • S : RIP' <` •?IL 31 % 0 i I h 'SITE #2 7 W0- � rP:, NC GRID NAD 8395 � SEE SHEET 27A ..%,, , f ( // DENOTES IMPACTS IN M RE -.FOR AMI RE CABLE RUST / SURFACE WATER c //i '/ M AOCTS INEMPO SURFA DENRY o CE WATER U N a 7 // ly , U ✓ N O a i a ' 50 25 0 50 100 s `1i11 o �. 1GRAPHIC SCALE " N I ) 1001 Morehead Square DY., PROJECT REFERENCE NO. SHEET NO. Suite 6/0, Charlotte, NC 28203 3f3/98 27A NC LIC NO. F-0165 R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DETAIL 4 DETAIL 31 TEMPORARY IMPACTS PIPE OUTLET CHANNEL STABILIZATION TOE PROTECTION (Not to Scale) Natural Bed (Not to Scale) IN SURFACE WATER Elevation Natural 1 O tls FILL PIPE OUTLET Ground Natural NATURAL SLOPE Ground GROUND F� CHANNEL STABILIZATION d DOCUMENT NOT CONSIDERED FINAL 1.5' UNLESS ALL SIGNATURES COMPLETED GEOTEXTILE SEE DETAIL 4 d= 1.0 Ft. Channel Bed CL 1 RIP RAP Length= 22 Ft. (Variable) Type of Liner= CL 1 Rip—Rap — Keyed—In (No Geotextile) Type of Liner= Class B Rip—Rap —YRPC— STA. 16+04 RT —Y_N— STA. 210+35 RT INSET - .N. Ai. *aissiiiii - - eVakill ;', =t- h-14 — 6 - 8 ' _ JB w/MH 8 WW L All!!. in. itdriere -Alt _- 411-"\,!4\ Maar nnn A IX" , C P E 18" CSP PU ► Ir' PUE PUE w/ELBOWS U M 2 N \_ 0 O E TOE PROTECT! • NS SPECIAL LATERAL 'V' DITCH M WITH CLASS B RIP P W/CLASS B RIPRAP SEE DETAIL 31 M \=")---- / SEE DETAIL 74 ,,,,- 0, 7 N Y U , NC GR�N a�5 03,cSR DENOTES IMPACTS IN 3 i //// SURFACE WATER �� /as DENOTES TEMPORARY $ ///% // WATER TS IN SURFACE / 25 12.5 0 25 50 jor Nu NQy GRAPHIC SCALE - INSETS �/E 2.o " N I 7001 Morehead Square Dr., PROJECT REFERENCE NO. SHEET NO. Suite 610, Charlotte, NC 28203 38198 27A NC LIC NO. F-0165 RAW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DETAIL 4 DETAIL 31 TEMPORARY IMPACTS PIPE OUTLET CHANNEL STABILIZATION TOE PROTECTION (Not to Scale) Natural Bed (Not to Scale) IN SURFACE WATER Elevation Natural 1 O tls FILL PIPE OUTLET Ground Noy d NATURAL ��� SLOPE CHANNEL STABILIZATION �/ GROUND d GEOTEXTILE DOCUMENT NOT CONSIDERED FINAL 1.5' UNLESS ALL SIGNATURES COMPLETED SEE DETAIL 4 - d= 1.0 Ft. Channel Bed CL 1 RIP RAP Length= 22 Ft. (Variable) Type of Liner= CL 1 Rip-Rap - Keyed-In (No Geotextile) Type of Liner= Class B Rip-Rap —YRPC— STA. 16+04 RT —Y_N— STA. 210+35 RT INSET ._...w-ori,- ,- „- nip,maziii„,...immw. . "A NE-Ai ao_lia .-_ al,.-&-_ ..M. -.11i..%,•_'" Aiprjorep ,- _. ..fift„,_ op .)11,.. ,,,,,. ..„,,,,,,„ , t a a , . III I I I 0 I li 14.1111111111&1111111111y-wL---"\ ___)-- - - - 4. ' ' " �// ,a• -14-4--V_ Fr S.,...40 r � 41101, /4:1 ---- -Alukftimit7---147,....,wmp, -40,,E-P ,..„ 1.0°),31,147-....-40.-74-1,11-0 a IA sr „2 c, ., 7.4.0"-:-, .,it,..i.41, bireitte„ Pr "Alt A \i, Nrir _ __ ... 7idil I 0 0-gr ilea ratint - la rp _ - 0,, ,,,.. 11... 6) Art': a S P N6 AT--� ,T ► PU ► PU E - PU E er EL . OWS i ,wiw co-- ! IV jog 2 !' ' ' - VMOE PRO ECTI NS SPECIAL ERAL TCH LI erp ��� WIT C ASS RI ; a�� W/C ASS B RIP ' P SE ' DE 'AIL 31C' SE DETAIL 74 Y U NC GRID NA1 N5 E'c S R E/. # j DENOTES IMPACTS IN �" /'// ///// SURFACE WATER ,,, k _ RARY WATER a //ii / IMPACTSS INE SUORFACE 25 12.5 0 25 50 jor Oa-' NQy GRAPHIC SCALE - INSETS �-'m 2.o WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 Site 1 Eliminated 2 14+00 -21+50-YRPCA- Roadway Fill 0.32 0.09 2 16+70 - 21+50-YRPCA- Bridge/Stream Bank Stabilization** 0.02 0.62 0.02 < 0.01 < 0.01 42 20 3 15+75-YRPC- Roadway Fill < 0.01 0.01 0.02 < 0.01 206 10 4 24+00-YRPC- Roadway Fill 0.02 5 70+00 - 76+25 -YRPAC- Bridge** 0.03 1.81 0.05 5 72+70 - 74+50 -YRPAC- Construction Access 0.23 0.02 77 6 121+50-Y LT- Stream Bank Stabilization < 0.01 < 0.01 12 20 7 120+90-Y RT- Stream Bank Stabilization < 0.01 < 0.01 12 20 8 19+00-YRPDB- Roadway Fill < 0.01 < 0.01 9 28+50 - 34+00-YRPAC- Roadway Fill 0.40 0.08 0.07 < 0.01 747 10 9A 28+10 - 28+30-YRPAC- Construction Access 0.01 50 10 28+00-YRPAC- Stream Bank Stabilization < 0.01 < 0.01 25 20 11 27+50 - 26+50-YRPAC Roadway Fill 0.19 0.02 12 149+00-150+00-L- Bridge < 0.01 0.01 10 54 13 167+00-Y RT- Stream Bed Stabilization < 0.01 17 13 167+00-Y RT- Stream Bank Stabilization < 0.01 < 0.01 44 10 14 28+50-Y- Stream Bed Stabilization < 0.01 < 0.01 17 10 15 33+75-Y- Stream Bank Stabilization < 0.01 < 0.01 11 20 16 37+10-37+20-Y- 54" RCP Extension < 0.01 15 16 35+90-37+10-Y- Stream Bed Stabilization < 0.01 < 0.01 98 10 17 37+70-37+80-Y- 54" RCP Extension < 0.01 20 17 37+80-38+50-Y- Stream Bed Stabilization 0.01 < 0.01 94 14 18 47+50-Y- 54" RCP Extension < 0.01 39 SHEET 66 SUBTOTALS*: 0.97 2.66 0.00 0.29 0.00 0.16 0.07 1409 345 0.00 *Rounded totals are sum of actual impacts for sites listed on Sheet 66. See Sheet 67 for project total. **Temporary fill in wetlands includes impacts previously classified as hand clearing, changed per NCDEQ comment (matting for construction access) NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 11/02/2020 IREDELL TIP NO. I-3819B WBS NO. Revised 2018 Feb SHEET 66 OF 67 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 18 47+50-Y- Stream Bed Stabilization < 0.01 < 0.01 33 10 19 46+00-Y- Roadway Fill < 0.01 34 20 68+50-Y- New Channel < 0.01 < 0.01 13 10 20 68+50-Y- Roadway Fill < 0.01 48 21 70+20-Y- 3@9'X11" RCBC Extension 0.02 39 21 69+20-70+20-Y- Stream Bed Stabilization 0.08 < 0.01 137 21 22 71+30-71+90-Y- 3@9'X11" RCBC Extension 0.02 45 22 71+90-72+89-Y- Stream Bed Stabilization 0.08 160 22 72+89-75+10-Y- New Channel 0.08 225 22 75+10-84+00-Y- Stream Bank Stabilization 0.34 901 22 83+59-83+85-Y- Stream Bed Stabilization < 0.01 25 23 87+70-Y- Roadway Fill < 0.01 33 24 93+75-Y- 66" RCP Extension < 0.01 < 0.01 49 10 25 94+50-Y- 66" RCP Extension < 0.01 10 25 94+50-Y- Stream Bed Stabilization < 0.01 < 0.01 21 21 26 116+70-120+10-Y- Roadway Fill 0.09 0.04 27 210+00-Y- 60" RCP Extension < 0.01 29 27 210+00-Y- Stream Bed Stabilization < 0.01 < 0.01 19 10 28 24+00-Y15RPB- Stream Bed Stabilization < 0.01 < 0.01 16 11 SHEET 66 SUBTOTAL 0.97 2.66 0.00 0.29 0.00 0.16 0.07 1409 345 0.00 SHEET 67 SUBTOTAL 0.09 0.00 0.00 0.04 0.00 0.67 0.03 1804 126 0.00 PROJECT TOTALS*: 1.06 2.66 0.00 0.33 0.00 0.83 0.10 3213 471 0.00 *Rounded totals are sum of actual impacts for entire project area NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 11/02/2020 IREDELL TIP NO. I-3819B WBS NO. Revised 2018 Feb SHEET 67 OF 67 0- f ®L I�VAV�� A y STATE STATE PROJECT P®BRBNCB Na STATEID OF ������ ��h SHEET SHEETS N ON NA N.C. I-3819 B4J-6039 1 DIVISION OF HIGHWAYS V AYE p� 6 4,0, Q' / 7SPATE PROEM. P.AROLN0. DESCRIPTIONO Rojo BEGIN PROJECT , 0119 AO i� 34192.1.2 IMS-40-2(124) P.E. 34192.3.2 N/A DESIGN BUILD 7 : ��� IREDELL . COUNTY iti : ��� : STATESVILLE .46 �'\'S�~9 • SULUVAN RD. 2, IMIT 27 • �� ' �SFpP 77 ✓ .�et.x \ t 90 P� 9y S 0\ a ���; F�R�, LOCATION: I-40/I--77 INTERCHANGE INCLUDING 1-40 FROM WEST OF Pa ,` = SR 2003 (RADIO RD.) TO SR 2158 (OLD MOCKSVILLE RD.) & 1-77 FROM SOUTH OF M� ` SR 2321 (EAST BROAD ST.) TO SOUTH OF SR 2171 (JANE SOWERS RD.) 2, ®.\,;." I � 84 `'°" 00 R 3z, TYPE OF WORK: GRADING,DRAINAGE, PAVING, STRUCTURES, Natolk .?!„,, 40 • • END PROJECT" - RETAINING WALLS, NOISE WALLS, AND TRAFFIC CONTROL �� L i Vance BEGIN TIP PROJECT I-3819B V >y /�\ -L- STA. 7+83.00 et`t ''a' ea T�N 1�IIIrill / �'// 70 Vim, rU�o9y END SEGMENT "A" _ OBEGIN SEGMENT "B" '`b� �j VICINITY MAP c -Y_N- STA.175+00 �QO THIS PROJECT IS WITHIN THE MUNICIPAL - o,,-S" 0 Plailli BOUNDARIES OF THE CITY OF STATESVILLE ‘3 , \ .c AND THE TOWNSHIP OF BETHANY R ti''. V ti> ii END CONSTRUCTION /`Q �/-.0 r 4c� ti i ,11�� -Y- POT STA. 205+00.00 �� '1 50 25 0 100 200 BEGIN SEGMENT "A" 10'9 `5,. ` , ,►s `� b G END SEGMENT "B" t1`.� ti 42 l -YRPB PLANS -L- STA. 92+00 \ ti5 LCDWB- /%i ' -LCDEB- �- \ WETLAND AND SURFACE WATER IMPACT PERMITS 100 5k 15 0 200 00I 4 0 �ki..., 45. �b �/ OVERSIZED PLANS �Ip -YRPCA- DATE:Nov.2,2o20 -YRPC- (Note:The sites highlighted in RED ` �.� -YRPA- are modified in this submittal.) SCALE VARIES ,�`♦ A \ -YRPBD- U -YLPC- t ge,, j o y o INSETS SITE #U-2 it .�``. T t BEGIN SEGMENT "A" nA Ems 64 �,� ' � �-�-�7 -YRPAC- „ „ �► �;. END SEGMENT A END SEGMENT "B" E BROR nazi �. �� BEGIN SEGMENT "B" -Y S- STA. +00 9D sT yr 40 V s -L- STA.178+50 ` ♦q / / SITE #U-3 � d 'P. ���� SITE #U-1 Sg G�S�lyi� ! ■�■■ / �i SITE #U-4 -YRPD- ,Af, 14 � 511411 ��� �irqt -, Alli N0 ��,r. 31 ♦ O� * �M LIMOS /��fYr BEGIN SEGMENT "B" ,� �,����% �` • \ -L-END TIP STA..219+ 00 PROJECT I-3819B �,. �1 ������*+�,�`rt�R N -Y S- STA.2 +00.09 Z - Ls-) • CLEARING ON THIS PROJECT SHALL BE PERFORMED ,e .', �'�� Vka o TO THE LIMITS ESTABLISHED BY METHOD III. ���� � ` ro PO • , S <, U-6039 ''1NS,.,0 o N THIS IS A CONTROLLED ACCESS PROJECT e� 3 0\ WITH ACCESS BEING LIMITED TO INTERCHANGES �oNe " NO IMPACTS N N,SgCF� LANE 1 o INCOMPLETE FLANS U DO NOT USE FOR R/W ACQUISITION 1) O DESIGN DATA Prepared In the Office of: HYDRAULICS ENGINEER DIVISION OF HIGHWAYS • • GRAPHIC SCALES 1-40 1-77 PROJECT LENGTH WSP STATE OF NORTH CAROLINA 1001 Morehead Square Dr., Suite 610, Charlotte,NC 28203 0 ADT 2018 = 57,300 62,900 Nc z1c NO.F-0165 of xoetp `o ADT 2040 = 72,500 77,500 LENGTH ROADWAY TIP PROJECT I-3819B = 3.885 p10 c,'' 2018 STANDARD SPECIFICATIONS a a DHV = 5,800 6,200 LENGTH STRUCTURES TIP PROJECT I-3819B = 0.124 `S a P.E. a �\ SEE ABOVE D = 55 % 55 % SIGNATURE. } o` 07 % % ** TOTAL LENGTH OF TIP PROJECT I-3819B = 4.009 RIGHT OF WAY DATE: CHRISTORPH�EREN DAVIS,P.E. ROADWAY DESIGN `�e f .`�' O T = 16 19 OCTOBER 30,2018 +'r o� .39 ENGINEER oR TR�ws V = 60 MPH 60 MPH 2U? **TTST 13 + DUAL 3 (1-40) LETTING DATE: ERIC W. SECKINGER, P.E. L1 TTST 16 + DUAL 3 (1-77) OCTOBER 30,2018 PROJECT DESIGN ENGINEER a mc%» \ J` CLASSIFICATION: INTERSTATE n SIGNATURE: P.E. P.E. JL STATE HIGHWAY DESIGN ENGINEER NC LC O.A 65 ° �\ /� �-MATCHLINE STA- 19+50.00 Y9-SEE SHEET NO.28 ,„„„,,,- „ ,„„„,,, °�° � �° ° v �g Ti I�ul °I �__ SDOCUMENT NOT CONSIDERED FINAL -� - -�—__T= roz UNLESS ALL SIGNATURES COMPLETED W' '' ° v'I 4�!1flEVA Ak - i+er i• � 'iT c1F„„ .s � a� \�� it I `..—'-- -^.s.----'-.:.• r-s7 ° ."" I se 4s.S"CY©y Of -/1 k,i,, 0LUNUo,rx.n ?H4 I I ( 1F , ; ::a ,1 L 1.„ 1 tSjCi t N « . . DENOTCLEARING NIZED F '�91��`.r`Vy,7 £� \ !! t - F`�• y.i I III 1,ar^�7� ? .,. . r — s„H i,,,e t. ° .' $ *�* *rt+ s° : so 100 „ x „E 1,,,t_i_ I -- t\`' $ GRAPHIC SCALE MN, Sous is \'s. ,=.J \, � � � \. \ ( �NIi1�m�o\��� �•;"��Ir �• + Q_m a Ems^' mx� €—ta ,, I ..tee.'.---\r,''Skni: 0,11kt,' :74.. s srv. — 4. BOARD OE EDUCATION '6 H .D WEE.- R.L.DERMAI -"./ -------7F----.ArZ.* ,411. .....„„ ,,,, n3 � 1 �i�- ..—..—� N„jet..., 2:. '�.''P' ar c °,s !} o-. ,o \ Ifl h` et y _ a4�:y.A pn 1: �E --6---PDF 3 /L' -ice :"'\ \� FEW-ss # '��' Bi%' \ ,I� ,e i �� o ° ')Z\' a,"7 o, PS`:m * d'f: W a°BExr\.FRB.„ :::'," P� �a' 1� ° w° '`'� o� \ .'s• \ q t �� $ ,.. c w ( ,? 4� SPOC li j . .. �.`� 1 - \',. �•'® �' „0„5 � �1 °�_ N li S Ct 'ry8 ` '" .,a .. aw:„�P aAP R ` II''( i „ 1 1�._�':� \\\ s BD„BD a DDcwRo• I $ .\_ �, {; + we D• o- ' a+ 1 //ems/ttCis �y .ro c,,.. ° , J®irt 11:en I:; \`��� /�N��uX uL F o.,. „w xJ. • , .l — ya' .: ' 'y zZ T�,,, , _' �J .• ,,, m+rwimym mem rooK e °. \ \`... .�x , -°o . \, 'imay■ ::, z ,76."'Drw wozn =„' ! ,, :$RmrA d+' _'.-� __ �j /' '\. \ + #�w". - „ W A W ;: 'v !I!• 111 No, I IB 14111 � Iilj L o j z _\ ' rr W r. VP i. . iall €. �„oN.wu,„w,ro"° • �- a' * _ ... .. �.�®E I° �i 4,.. .i - \ „oBPw, "" o,AO O W vrV ' �' -.1 ,•. H�ul IR���;.. -. •.� , � ��.-_' �: -__ a aza z- i 1 W xzzu. Ya.A i ,■{ 1 lr�.w ,o ' �•J3,.� Si xl�i.. J'V L—� �J 1 I i •ok. e cI i }I -� a Qay - - ..- ..n .w> y� - „.\_ _ P;,-..,�I Il.il:iria ..n ce _ ,. 1 IIIMIIIIIIMIIIII w o I "r4 .� ,wow Di ,.,>e,ym, ,wow.. Ir::,.�,� 1 I. n��nn ��1x�� �- r. W �imow. 124 c _- r F j .� — _ T„T r—• R.II if __4z9.ReD---_— —Zi -("..��7011141PH` ^' _ - 7''1. Fs.~ s -i'- „., rsD,: 5a .y P]!`.__.. �"- i11Rf}l.�IIIIY��IYI'A I�J.l�r., + •�. aaaz....g�E7R �fiR3t y .TES—E-IllE1211NUS:74::- .. _ Ja L , % 11 W_- o c ,,i ,s,""1, . ° i.�\' :..1 s 4s• a I} ..`.ern "d` -•s S 1 —:: -\ \� „e. x +'l .$3n•e,:u;.. _ �, n .'fin+ -�.f... �:. : �/I k f.,�, i, _ - - = .- ecwz _ — !-- —m...ii _ pus i q.a+y,•;.._ \ ((II°I .1/I ovv� -e: kd `1;-, . i ::'-°�-''."R.,� -..- '.):� :.Ta © . b ofNP w�_ .:. _- I::'// A .a.,;,,.r ,�0� .' w i, .5.....:.2...P .....,,:.,. -�+?nit- ... „rErzBurE oE.xLaP„E„r ca. =X „ \ 1 ,�` S LI zr.„w.-DDcxu �`�\ , i,., \` //�:I,.r� s w-o,,,.,.,.: e® n. r,. _ip� �E - - ' 3..-�:n „D>FLsr.,Esw�LF _ .....:I $ „ 1� •�` I fi'..'.� _:.. � � =A A.�e� � ., �e'•::�®d .' I +v � �IIR 1� I ,il :,.. ... :�." — ao �iI �, �r. 2 .G D�wED x e1�fi.RtlS7w w r _ 1I � ;�i;;; mF+,. �� ,.,E D ��i I wD„x ' 1'' ��6f� i ? P Jg-` I� /[=1 j p G `,, �. 11 { .GNr :D.S1, E \ I� I !!IIr 'I1q u \g � �� ..> . �- R � h�t \ �. I el / off• ° 1" �. BwB�BLL '' ®,� u��Jl. ' v ,di�';'` ,ED�„,,. �.I J.. `v I */'''a ..I P 1 4 'll ol:� �''I I t THIS SHEET '.� r / .? . \�'','" k ! % 4s II$$ °R Y9RPA sT „ \ -'�[ce �•i,rowz i,r r' 111 6 tr.. ® — a' .p _ I4 "'""'s a Pl Sto 12+5005 Pls Sto 16+2770 PI Sto 17+82E8 Pls Sto 12+83, °� I �It• I�® s "' ds o rzzlzsrRl es a4a24.4 0-Ir46zzsrRl es row43 1C F R �111 D=a40'26B Bs=T09'45.4 D=TOY 43l Ls=2NAa .'" ,} \\ ',a i •,-, ! z /L3Cn.LWj�I®I�. 9 S - I _" _ �i L=49996' Ls 200Aa c=169a5' LT=133.44' 5i�•,�D„ \ �� v v�t3' -E— 1NA�f1�^ gg s$ T=250A5' LT-12T]4 T=8272 ST=6677' atiiE ,• \ �81® :� I 3 - R=BNC Sr=7253' R=BLgAIY ''34%or w ' mgsB .. oPP ND 31:, Z, 5- I / ' SE NC SE OB : x .y,x �-� ` �, 3� (- — OS 50 MPH OS 50 MPH �I �'• wo \\ wcz s � ��n�w ,� @il•^E Ns Y - °$§ $ ', zsz a Pls Slo 19+94L ._ .4 I J u \ ikk ` �� _ o • ' // a Pls SYa 19+3158 Pls SYo 21+98.92 PI SlV 23+5920 T \ �Ie �RYI +� lF�i . . .. -z000a33 **x ' '''II'��. Z ' \ \ �.iprc � 4 I [7�i ivu. zcuCgm4'3r -z000a3v o_12rr�3'os�rcn LT -133Ar *: *'**' �y.I ,c \ W.....,. �_ �� 11yg '� — ST=Iffin Lsrr669r T-1a9644r ST- 0� * *`* 'A'* *,#* V�. s • `H\ / I 111V S1- -66sr * "'�`*'a S* P;�` ix ir•' I _ ' �11-1III � !1{ •� An R s0oca 1 �'t#*'f 1:K*•* ir. ® / _° ° s� r SE 2s MPH ** 4* * w ° — y Jet! '�i 'W I �l o. ,� _ r II c3° ouP Y y Ip �i l' I 1 Pls Sto'30'55 P15ta 14+1429 Ply Sta'30'54 Pls S)a I1+38L 'jem p _ !le K� 0 i 111+[F41 - ' Ls 343d 55.9 0 343039.9' LS= 0000"559 Bs 95/l'3 ' rLF—° �' +1111 9 s",. \ 6 . 0 LT-11335°.6' 3021d 559 LT-113355.96 LT= n II NllMlhHH.I .IIIN SITE U-4 R-166L1J' MECHANIZED $ yl ST=69A6' T-214.ir ST=6906" Sr=T09Y I n I �j� G INTERSTATE DEVELOPMENT COMPANY n1 �1" N "! I ,. V 1 II - rvr II111 OS=PS MPH I flN% ' ^'..,\, - 39�1. ----'�'. .DI I _ �I -r9- - CLEARING Li t l � Y S N P1 Sto 21+5798 Pl Sto 24+/333 t' iit . T) p 403'4T5(fi0-f 12'042'L 3389'a=4no.Ca -% 0S=40 MPHSE NC ACCESS ROAD _, -MATCHLINE-STA 34+00.00 -Y9- SEE SHEET NO.29 �'� ,r 4° �g ,ouno„.�n nr e w.D nmr GRAPHIC SCALE-INSET S nv„o..lanvP ccurm.DZD64 ni 7 A\SI) 7;2o3 'VCRET'' 7= -MATCHLINE STA-19+50 00 -Y9-SEE SHEET NO 28 , . ss: \:•‘;11.7-:-. *‘7.4 ' '. 1110-4-,445.11"Nao ' r; lg. . -,* .. ) .0\;''\"ktariglk14"&"*', -,,;;I'N't ...'qi/IF i ii 1;. _‘___ °,z,_ ,711liabildo: 41:*..*._*.pr_sr...A P.,.*,1,-141.1-juroje i 1 1 t imirlitta6,1167117,7 wifirei '''''' MUSE ALL MOMATURES COMPLETED ift_uffillaitiroitRa-wm,k,,,t,--A' wra 0 '1*-?- 1/4‘ ;‘kwil0\41,04.1ft.i:,% '4.,4 VilidativOirtzit m,...717/7-NIISAVT411011 ' s.- of st.. ipir ,.• %.41idt„-----„,..raolfifiimiat, ,Ifi 4 515: 10 ' V.\\ N 44144 ji AN4\ \At . :44V ill i 1 17,61141 .110114601.1.2Llaill.,4..-.01.".''7 A‘01 741' i 1 4 fiko.F."*N:\ L=9 GRAPHIC SCALE 0 ' , N, A.V.,, ,ftE VEV, \ \ '•...No\ 411 t 1 p/ tiiirovi44 -,iii "'"' 4, A il it 11 i,mporoleiriLtit,1/4„.....-1._, ________ , 4....., „., 5.,.... ,4., .. k'R," VI I E M I `Alb...•,•••1. • 612'...- ..,- 1 \ ,...--,==-,---,,, p-critt...4 •,, ''--_- 0 Nalopii,ilitaii-- ...4 ---14-4P-1,,- -----.=...--..„-----,--_-_--- --,e,--444 ofit 4(fie v.,..,/,....zv ‘-,-... - -06,ilapAn.' ,• ,N40,. --N., t.,....\ ii.......-- % L> vil- -...11 ..---_ , j L 40.111-- --'w 'tily 04, ) nisitirli_ , ''.;hirtlig i now.Lb-..-,__,,,,,,,,w-....-------- ----a-4e._ _ffeF16116.erimerP--.. ...--4100.---...„,.. ----- ktWzitia: 4;6%.il ,..ine, .1 - -_,.,-_- 7.-- -4,,- sTiairkWisVreZ11-4 -,1...,•, ''' -5-.,,,...-ki..•-. 'N;St7141,... 1111111 ,,7.:7, tarrA\I i-rs0r,/ ‘' -- • ''''ti,° ' f'11 a‘,TA•iiiiwAlearrefirmor____. - 4-0:-----,-i.-1„,.., ‘,. ...._-„, ___*%,,-,•.„,. A,..1k IL t r SPO*14' ril, a. ,n D Oi STATES,. , 0....":141.71A,g11.0.1111F;#41. ,- 3 .-- ' \\\\ ''''';'7 ".4, • , 2 :j /Tr 4'i ;I IFilrfr 900011"' 4**.r"'t'ir* ''''''''''NN *'''''-*''C 11111,V ''''''E''' . %i,A, 4iir At:Jr-1priter 0 II littff Ic i 2 • ' . \ \C'S, ':•AMIll Or. Ili )1 k NNERT 4 0.m.. ' HuiP I i Ai .7.- .`'41 h'''' ''''''- - "1/4-- ''''''' -'"--- ".%. 3-- 0'. 1 - -.".."'AW Z T 2 *.51, •.,,_,`-`--.. ,„ /6"."410 k 14,7;-' -----.---- ' \*-'4-- `'''-\\ U"4b.._4)1* ' '''' ,4°*A"' •• '•\1/4, . Za744e w' ''' INSit•e 1),iiiki.1::: -14,k- L'd h so , -' !.-.:kkhi,1,4**, ' t1( \i I `01 ,J, A dolv .,--,0 ..• tilit *I ......U.'..--- -,,_,, -'-s,,,,..*St.Nt,k‘ , - -ts\L' i•-#I.-= _..-.'"',a-A.,a,IA,ZAil' I' 01`.---. adlh--am- -,..,..¢. ..` _miI0:4141-4 .7-4-*:' I 0, d'-rr,st A 44.41, ,, 4,kr: -,:_:---,Lzt-s-.k.,'N, . . t .-mil„..,,, , • ''" IF 0 i \ !,‘ N.A...i fil fri40/1"-,•", sri is di i 44.- • '• ''s•A‘,*••••1,•1° '' ..,i,..... %- ,,..,'..'\--"•'-=--'=-'-=---:=;: .=--- -'-------- 3-14W'cbt - ‘\---------r----r-------------- v" ''''''n g i z\' ..._4,N14,,,N:\8‘. . , .-`*4•"v ''''' 11 t't d-------,--V. #* ‘-1 ''' -i k*04 4ivaidgii,/,.--'-wv. 4.-yue,1„,--------,-; -, -,,,,, ,, -.or tp".'012 §2M-11-',.„,_`-:"-z4,-1-4". ,_ ,...,_----------.:4-74:----- ----zi=- -,,......,=w--...--.-Air.-- -- ---,z-----: id ..,,it.., ----- •\, 4h:. N\‘‘k :el: 1\41tArgia.frit , •COP- i i titiVOIVIPC VW jfr.---7-,W02,W#4211111/... *' -.all',,IV401114,.‘-'_‘`- ' --11 ---*,14,,,,,,,,,. .-.,-.,_-.._--.. .."-..--, : -- 41.- -----"\-=--- -------- -._4,... 2,‘ni g it .N.N4.....„ Ilitylk0 \i'' .:''.'' , ,../-• B litikt- -- '‘ -111 ' '''' Av, 11001` q Ll' '.. --•"Z-Z---'--Z-• -•....... Ws,s0,‘ ‘1.--__ _____ ••-All,-,....-, --110p..... '4111 it,s ittit.„ . _67---,:ri 1--=-k-- - ....___.u....--__- - ,4 '''. O'-..N11.11W. Liej-; °u'E' Aiiiii"g"Imit--Am''.---- 1 - ----e9----- >TI ...„,`...N, ''''*vz,=•-g..-,We.lk ..s _ .,., nr_.•__ ..--,---_____=.„ ., r5 till itAilienotilikivAt ---,, •a.4"11.-..._._:___ _____s______:= • __ _______:_____ ----------_,_---____________.______=---_ __ ___,,,-ki____..,.. „...... . ._ __ __ __ __ . ._,„_,,,_,,,____„,_-,.. ..„.__,.,,.,...R-g.;ii-1-0,7„._-_-........2, ...._.„ _.....,._ 0 t! ,.', -------------'.:!rt-a--- .,--- . . lilt Inman • .:---- --.'- • - ___... . —.. Ihilill - -• ,L ° OW!, >7 II j __•,_ PIRMiiii/94W1/..--- .. t .21:271V ----•-= 1=- _-__ airiP9146 ,-tormanIMMIalmim- • s•--- — ----- - vv-.-_____- ,,,,i-z v _ - — , ---- -- ErilLIIVII ''_ ", 'amiljlINWIlliker."1°'•°'==_-_1= - • - -r- -_-_-- -7---', --- . --i-z-w.T.T...-- ,,,,-w4L. - ,9--.4,--- -------- .7r,...- 6- o=ANSA= ,,, , ..•.-,=I "..i.P i-...W,, ,. "E C .---- ......, -!.1.71=,Millall,==••M-=--- - _______....... '.".' .n-.':7"V'' -' .' -.' -'" - - 44V.,>•;}--'•f• -,.444•••• •:em... _ ,.„_....4;:f,,,,,,.4-'..,,44......• - * 17, ,16 ± - .1 .---- ___........____w...-.•-__......-- -....--- ,i _--. s,..7- .------'-77-'-, 11W4M11°_ , ,,, „,,711!211721111M ,1<!,11U riaillWw _ _ ,----- _ ----- - ---,;-. ,,,--.'-r=,,v, . -7i;77, ''.----- -„,,Lim-z.-- ,,_-__..-<„,,,,,..„4,-_ -441., LL _..... ....-____, -'Eillr- v,v4 ---0.--,,- -.....,1- r.• ;e ii ,1- --...,-..11M'- '•W 411111 ,-_- W IIP". 1;.-e- ---- ' . ''''"• - , -^ --- --=---=----:-.---- . _ 711:\a"- ----J-7..7,,1610111.'--•i"''''14 tr#A-S- ---"--N--71,71;":" 7;',*''--- - -- ' - „-----m-----_ ; ,,-t_ ,-,,...,- ,„t-----,-------.---t:-- -,,\--------------------- - 46-.-------------= ------vro . 'j1,1- ift I-UNigi (.) S - 1••• -" 1 ''''''444..:INik.W444."---•-4 .,_,_-ft,,._ , 1 1 ii:E;47,:;:7111,1,7,, . , _L , 4'... ,_„_ ,t . - ' 4. lft:'-04%*.-iiii, lii4 " 12 41Ii4 Wilifi '4'''''''''''"1i/it,' -s----,.. -**1117/11 drst4 q' (,1'W.. .--;..lit MI AMPOPI*31 ',1 -A - - 2-------- -- Z-i-..,6 ,--- -, - ,-*-L--------ziu,*--Z-4--------4 0 fi lir •E:ri tit ,”..... :iiii:obso- ,,,y-t.„1.kg,371414r --.401 i4,', 'tid,,,:-- — ( k Iii . ' ,...._ .- - ,.;, -41 _..,.• f--"7::•. -14'- ..,_• iY_........- - ****Ait,k* . ii i., . E, • ET ik,- --"r---,------.. -,,, ..t.i.„_,,,„, , ,,, .%,...*4\ sik7 iti I • ' Al, • i.\---,---\.- kaLl11.741.41M:VON \-.. 4'NibIN Itki,. 44 44••••1 / i c .. j I 1.1 444.43 NMI*.4 .,1 WW/a. .6..,. - I I WY \\ .„__.....,- — WV, . AVON ' .-. ' 4.4.,,,‘ Irti„. V, \t tx.Amm..-:,„„ir ,,, /4 1 • 4, - 11'. y '; 1 \ -...•'ihz, ,-,- V .i. ,,, ''',,,, v - . .... . DS=50 0 = 0 PH X'.?'''... .feratPitlAiihth•j••••WO'F ' - '.'%•,- "Tglinclo.,-Z r-r ..',1;:A/.,Ail,\r 0 :'•:,1.:,.N, NN ,i,,4,,NNNz2 , ! '''''... j"---........s....„7.424.15*Z.....7:- .,-.7 .14.1 44 ifiretrear- ' ---- es i r e9'43 es- st.1 6692 -.4 Y _?..g, 41111ftairdir 0, 4*4*•* fgF= **-**Si* .,. Ok \ SITE U-4 _- t II 4_ -% '''''' ,'* •:1''',,,.Irk Jo- ------,:7- -L- -- ---7--N .....4.4., -*1'1". - I. I II '11 ILL t ; ,..„.1144 .,.....„„„<„,-,,,,, ___ _„..\\ _ 4, ,.: ,,,„„,:,,,,,_„..„, , , ,40,:fi . ...„,,,. , ,i,,,,,.i .„,„1. , . 1 LT-13596 ==RV =69.• MECHANIZED . N„..--No.:N....---N_._.----,---------._ - .,-A......N._''Ams••....4,-,ompl, 1 4 ,...„-N1/4 ..1, ..... ,,,.., ,„,0 SE= o {%- ' CLEARING I • , 1L, 1 1 ''....---'-' ' i ''',I;V !:_ile,wit% r."21::": "' :-7/2;,+:4 ' L:rj 9':U•3(L 4 :,04r2 _r_.________ ...... 2:--- ---.., j -UTILITY F, 1 trAI,IP". .ithk'',\'' A,,,,. ' :tri7......111k'''''''., :.4' I liil 'Jli'•":415.11.116, ,'A ) 17 1 ACCESS ROAD IP/ ':. ...r , mit.- 0 tie 4 41116, v -..- _, r--- To N N 7 ; 7„ z : eill ! (I(1 c // 1 •'i ,' .•.0 Allirrigh',...4.,::1 Al i ill • JELY:.''.7:411 o -MATCHLINE-STA 34+00 00 -Y9- SEE SHEET NO.29 GRAPHIC SCALE INSET cEscAcc RE c nEvc a 1) ;/) ) / l' U(Olil if IA 11 �� G le J i, "S I) s';'' SF43``p wesaioz Ma,/-171 - I rs�z2-. :4C;PQ'.:!;.:.:•;k..°•ItS...i....*\4*4'()..::.}.:::::..1 OFF�4,7,?tyTOhrsNa".rsa .Na:"rs..QMATCHLINE P6���1.5�� V• ��rV\ �� SEE SHED23$+pp •Areiy�� ti���A 0 iIc �. P7� 1 NO. )0 ,yRT ` C O9. oPTO OON YRPA p b A 1� N ®�I�/ � �` ?i` ,.....w.,,�„.., ..,.°STA.66+9EET N0.10 �� ,� A \\m 0 ' �P� li l/��® G /,� � �,�JSEE SN a 144 � � ® /01 �// ��/ �.e i''. ' ':0-04' ' ' !;•,0% co rvuU"LIB AI ...III -, III -::, i , p c ©- .4;'II Al i'"II"' 1 I it i 0/ Aft7" 44: .- - -.. . --)_:v . z„ *.. 1'- k ' IIill II Il ill 1 _ II//IIIII ia�.�r'- ca\ •III / � I I I `�I��✓' _� __ \ o�*: �a - �. :o� /y :7,777z /Z.`• \ 41:4:i z O 6 €9S41 ''',:)'''') \ " gut ��� IICUUU�.I :;�� ../ �+"P .® A ��� � -.gp 46 °ira A I 4 4/41 I N 1p / , .- - 40! 40/' , -.7 ., Al... '---., •:• \---N•....•.'.:•:1.-:,::•.:::••:••.::•.•-.•':•:•••.:•::.:::::: 1, ••••••••:•::':.•\\• .'::••••ofilii•\ l'/I ljpitg 1 1 4' ', #i. hp" • • x. 77 " �.. i M *+I' µy P1'' I 1 x 4 „ ©� G> -YRPOB-\\ \�a • '•. •. ••' •Y• 1/ fll I PISYa I4,2403 PM Sta 23+f430 PI Sta 26+439/ Pls Sta 29,0394 Pls Sta 30+9594 \xqe� -- '� '."•• • sss 0=230'023'lRTIBs=45Z 55P -2424IIA•fRTI Bs-452'S52'Bs 45T'08.4 \ \` R� • �� toNN' I.j s� /l^ �' �r Q��. D=O'3B'lI% !s_149A0' D=6'46'50.0' !s I44A0' Ls I44.LV'...\c \o-\ ��° '•� -'11{*® f ,. I �, I I I / ! c �.5 1p� T=3M643' T=483' T=22I]Y ST=48 3' T=48.03' 3- °\\ \�\ \gyp' • " •: ; _ T ., . •;I -T 1 L,.` .e,P c„..`-' R,E_9 AaSEB0i ��e• \ ��� c \ .• % I y<', fl �„n✓ OS=50 MPH OS=50 MPH J I \\ �.\\ 'f� „ \ 2 , 1 I .. Y� PI Slo T4+0/�l2R4Z lBDB'lRTITMspry \ .. ill , �+ .'yJ © Q© E}Li DO'29'53% D21448%'\\ "� \ �. iIII • aiasios.r. LIAI4.43' 0 l3'l9'386'!RT) uc. \ fl , ICI �� / •. #pLS dLQ £:+ R-531 T=829I92'g� //JJ C 5p0 R=2g550D0'xc�. "�' 6 \\\ I��� - : 's w © fl a5 NC PH SE=09S NI �� .$§ \\ Vl:.+ 4.4 .. u, Q OS 50 MPHi/ \''�' 1,\\ ,��. .. / l�♦ � S © fl Y1T YJIT -YRPC- i �•)r '",:`��s�• �'� s L PIs Sio 33I+T381 PI SYa 334+8661 Pls Sta 232+6232 PI Sia 235+9232 Pls Sta 20+25D4 PI Slo 24i669T Pls Sia 28+5/A3 fly \ \\ ,�4 ' � �� �� �/ �/ ii, bR fl B =Z3441% -B'2943%fLTI Bs f54355' 0=I0'OY 59T lTl Bs=45]'08.4 0=50'3]'29%IRTI Bs-45],, I _Q-"'"W"j \\\f� II��1 I I 'rs .�.r���� v /I T_2�OLm' �-49482'55' LT 23334' 0_52534' LT=l%ON 736.00'lT LT ' \ r�. jf {�'}i P'r' �\ N� I 5T=90AZ T=22282' =666/' T=31300 T=48D3' T=39391' T 49D3' f ab� '..\fl -?i `�S"/' t \ •UDC Q se 300500Aa SE 30A5oc0' SE 833Aa I Y i il, MPH O6 t \\�\\\ WD e , \ • i,4 4.� Pls Ste 11+9335 PS Sta�i0T3 YRPO Pls Sta 16+I661 O iSta�22MP1/ Pls Sla 3I+6693YR�5Ya G+3283 $H x \© V' �lj,� • ,�. 1_____--.I \ PROD' : �'� J' //) R=B33AD' R=T810Od axux aeyµ— •.:•• €^S'. �•/ /I�„�4 III �/II ® :;. I IFER s "°" SE=O6 SE NC E=8303601Y / OS=50 MPH OS 50 MPH OS=50 MPH V"'„+z=�N 'FOURTH CREEK \V� I I U� � suu vur x°a°...TMms uc V�;. SITE U 2 l � j wH � ;� a�vav SEE SHEET 2A� !. , �' I r *i.• .1 \ / G<1, t 11 1 ,/ "9ix p � �®i INSET ;1a LL�II F// '" G+x�s.°a ro°° s' -�` '� ��II �� / C� Wfl / ///// DENOTES FILL IN / O ry o"" axis"hN wn�cr'I ,.. 1 IWETLAND �"' ' , �. '1� / ,,, ::::...: � , / \ �/ DENOTESTEMPORARY w \ T\. ��O�'C �/ � cure\ /`. ///// FILL IN WETLAND � �� 1 'a.�/.,,'°�'FSaiy�hr��Q!' hsH� ' '2GI�0 ;\,; \ . . . . DENOTES MECHANIZED/ t, �7 SITE #U-3 ..�. iii , SOk ' � '+ i��! t / (/\Jg'/�\ 15"RCP-I 4 /". .pt: a..3 S..• +�, 41� .i ' y 7 C: .\ �,fy��//� DENOTES HAND �I � c L o �4 � �.����,�� / t.,.°,r..,r. an*\ S Ie O .V //// CLEARING s,.°�.,: I ill A p p�r.�.<,y�6'1'e.,',♦� Q� �a�. . ii �YS F , \< `< �� � . �,rr. �s��va��Q �:#77-7-'a-::::-----:::::1--t---5 �. A SUE p �,.. IT W�eslrl,�`�Np � •rF't6 .,3r�t,, ��_.��� � � �� \�� A CLEARING m.°xMATCHLINE— I�N��� r °.m N.STq.gp pp —YRPAG- „' 25 12.5 0 25'sSEE SHEET NO.21 SF2 oTCH(I��n�`� `;Md� ��`✓, \\ \\E� \E SHEET p , S . .�{/ _�� I .E,�®r. c rums No \ GRAPHIC SCALE - INSET Fe_i •27 ��GQ J,�_9 "S I s"``xc iic"'rvo`p Dies aisa Mo„/-3s/9eF""o. SXzz�. Go 1 yk1� � s�9 y1ly t o p p. . ��., F n'i xsb f xS�p �A MATCH(IIVE ST � j' X6(* \Q �`� !,r� \ ►yamn _SEESH 35+ %�iip// t'poS�P'p.�`� � � \ III��° ` EE N 00 ,y _ ice/�i �'pT'°C'll\ CHLINE S� S< O \o a + ���V : r. O.70 RT i�i�!iSt- 1 -\�pT YRPAG : - �. l�, ��� o i..... #/ / '��O • ......w.,�.�,.�.� ..�.o +90.00 bSTA.66 Np,10 p \ ��II�loa f 1 r� 4 1�i � - 0, :;0-71, e, '''_.0. SEE SHEET �i. �� �v°,. �� �11 /�!+ Jll �` �' l� %%jjli/F. o.,�••;:.�::. � II o �� , �� - .'ems l I �r� `s �� o - '.� : p�i�1 AI s V.47 g414//1 fi�iM7�Y➢ °l --: 4% ; r.` *. d© ����� �„I��•���'� r� �o �Iiiiithiritsg-F---71-740."- ®�1 Gtv% ii/yv!j, '� ; * R�,*� * * 40.,� \ •`e � ���1 '' ej s. D - .09 �� �7"' • �, � 'i'*** O©qt �• a� - ¢ ".,t��\ s a .� f t� )•-, ;e t_,, �q®9� ,�/i�4 T Jf�� (A ' ,..".- *� .... **a 1' o tt ♦mac I " a���� f��/ y•�•Jr/`,,t,/j �" .) % Ilk 41/ ,44.. �* o boo Nort �., ail , . , _ ` , , l y��` )// Ci' P o • f . :� 41i rah **w, '\x� r�-�4 \• ` al irk �k4 -.n�i71 ,A�I �� '' �`/ * atei:Adetwrii'l fill Pig !! s.. 1 3 ,rk 411e J� �.. * * T 91rk - �� � 1� �,�: ��� �:, 6p, III s ifir: � 1pfr^ efl' ` is, 'I; Me\. �_- y-} l.•'.''• � •' I v !"e' /. � !' Ak £9 ►/ H'1.(143 /3•.Bls4j .4 -. ,*„4 ' �_ ® ..: rot j�'�r f\ Ij 7:c4 ,•ti7f4��± � * °„0 a�' 9s 9.0 it 1 J / �\ �,i�I•� Y``` \Q' � 1 �'a i I It IrI C�� /r p, 4f J: 111.:6WAAPP3 'l Slor'• Ir V I ��`� ti� �'!..` r 's \ I �!- 'Iky kil y:. II: :R!-y�' J-���f ��. w`s.... s *^' o:.ne rrtn o -'4'' • Q Y `��R� L I/4. TM.o ,,,n li \ O d� r ;��/ I 0��,/ Y" ** �x r-s3r. .4031114 fit ir ID �'Cyy'✓i A p �.;.\ .` �, y ,' s�'rd �\p:IQ ��r�I�.p,� 7/ ., �r / � �e�, +/sal •c, +q..s/ , o e� ,zo+zs.w rl�z4 S: ,7, 5 �.-^'.1��� ..4i.� \v 4I�,. +ram. ��\ 1!•` t���� / \'� 0% aH5•/ z/r'//• , •irwi 5r o 2 j l �; /',.'mow// it ` 1 r . I -T // _a *. -...y '' ; �':, . 6�Id, - 1P IP'�:� /• ©, sr �'^�+' lao. ' ,-r S Lr_/3: - .� / L. 36 w.\4� crtP 9so4' Q _ •" /:.• � �._I I!I �.�. vat �N� �. I 'I '. !yr / �''. �_..// � ,'2' .;. 1 ,.Fj, a �::0' T 393� ST 03' Y ° \ 46 \ m ds -�" y rL: \I't ' ���t tor,�� ` o ^ ..uu ��-/m /sti Q ate Jl ® i\',... �.. ` \* + ,'. _.�;�� .j!s��j, ,, li'., :/��0� '/ y -14a.. - .. a / 1 ar•' dl 'b., \\a \4:.,. �,a,��tf�y ffyyl+ f fr It, s:/ / V. it 9s. ...• L d .k'oiv a� ,, I ,� If ,�,� a 1GtsCin �' _ Weir • - a �"o � moilk.,,. \ eF , l ief �' trbit fi / �`° w`SITE U-2 iti, /J I �F Op J \ o `.. SEE SHEET 2A1 p41 .11l/ ® r t:��1 �•,. D \ ` , AIDal ' fr 74449/ if/ l ig, '. �� A / �' \ • --� """ Y. ,/, l / - ^ INSET t" • \ �j' \o°��� '� . � 1,�� ^!��l' //l l/ 17�� w e+\ v DENOTES FILL IN c \\\ `� •`\ � �R.r �F / //,.,.+ /I .� *w v D 4 WETLAND.1,�, //Y/l £ ,.,� �� �tpe�.oEa,,, . W� ��� �� I I � e �,• ,�� .".. ;!FiTd ,a ♦ .. DENOTES TEMPORARY i / P \\` III IIIIiI I� ��`•''. /�/�/ / ♦, ...: '��. o \ '�� /;. �; ///// FILL IN WETLAND A• a Cp� gg O x i @e l t ' ' i glI4 1/ sH 4GI� V DENOTES MECHANIZED YYY w, I@ SITE l 1� .O.G�II III�I/! '�'/ l,J � o e'f. �� � � '' �*; � �V � .". . . CLEARING O, aY ��+1a►I�f}tr� \ 15"RCP-, A `/ ,fy��.//�. + I � ♦44:,1„k$fit / i � C \ o o �� .\ ///� DENOTES HAND 00 _ ,` 1 G 4 �� v : ea,,�// �,/ A � „ l _ / CLEARING i \ 1\ 1 �\ - r(jr,_;:kiell:AfrINIII6W, 4.;',. .--.7"..7,--*.f3.0 .*.v 1 �*� ., -AIM. ��� �I�� ._ \,\ zetel'*:��'711 "E'N.��: ' .��� \ O!y O F }-ems �. a»�r tilpinh l ��°'� ' 1, gam► HAND STA.eo rHLINE- S ', III►; �� w �-'" \ ,. . \ \ oa / CLEARING R. +40.00YRPAC- T C*a. A`"n �i� l o .." `�\ ., \ 25 12.5 0L 25 Ca„I. 1 s SEE SHEET N0.21 SEE.SHE+Op7Ny qs'c ...��fi�� 5�`�.. . • I FT S o —�� I� HO.27 \ o `� GRAPHIC SCALE - INSET moo. oN" a o,� LANE XX N I ) PROJECT REFERENCE NO. SHEET NO. I-3819B 22A RAY SHEET NO. ROADWAY DESIGN HYDRAULICS SITE U-2 INSET ENGINEER ENGINEER J, k N . * _ .k * , * *'- *k * * ' *k DOCUMENT NOT CONSIDERED FINAL - ' -, k * * k k k k UNLESS ALL SIGNATURES COMPLETED * * * * * * k k * * * * * * * k k * k ., „ k _* k k k * k , •k k k k / * * ( 0-'n) k * * * k k k k k , .,,,, 'k k * •I'S' k \ / k * k k 0 k * k k k k k * k * >4 49 . j' k * k * k k k ----‘ \\ k k k * IINI41'1 '•.-441kW k 6'.* * k * k * k kk ''' k k k k k ' k * k s, k * k k , k * ' -- _,* * * . k * , * k * :k %.**: .k IS '' j,' :• k k - , &• k, -, k * k -* k k * k .k ' k k k 11: 11% 1 '1 1 I i el itotA„% & , , - , * •i - , ,,,z,,,,,, , , . * - .\`- .,,,,,,j._, 1 I . - „----,'-- l*IL 1 IlL' ' ,L k .k-loyil '.. * k ....i IL / * "174„iip 4 ii**• . ' , * , , , , & , . , . -, , .. . k TEMPORARY FILL . * . , . , , , . . , WETLANDS IMPACT / . . . " * , 'NG* * / . 4* * ' * \ \ 0 • \ , * * , * * , * „k ,,4,... . , ,,,,,,,Ar, 41. •# , 400 , , , J, : j, * , .* , 4. k r) /co WD c ' \ .' \ .* , '' .k .k -11Pw.474 •k Ai‘* -k * , . I Z-c - .k ,, ,, •k , , ‘s, , 5' DIAMETER MONOP OLAR tfEECTOWER , . * . , . ._ ,z • \ \ ____ . . •k , , , 41VOW ' — . -o k .k , -k k ' • 'Of (; , ' _cc7MiiCt.Lcsn,,,Oo,,' --', ).. , .' \\\<9<,, ,'\' NORTH CTR A-N,S'NP A D'P-x'i P rAioRATi •kfi"" ,, * '**" *, / // / DENOTESEA FILL DLN L DIN ORTMENT , k DENOTES TEMPORARY A RY k 3 1 *,,, * * * DENOTES MECHANIZED AREA WITHIN 50' OF BRIDGE * ** ** * CLEARING ALSO COUNTED AS TEMPORARY FILL IMPACT IN ROADWAY & DRAINAGE PERMIT PLANS , a EXISTING TOWER 0, OM_ N 0 0 TO BE REMOVED 50 25 0 25 50 LL,0-0 iLlatilliftft.--mMilli ,0_0 GRAPHIC SCALE - INSETS LANE "N I PROJECT REFERENCE NO. SHEET NO. 1-38/98 22A RAY SHEET NO. SITE U 2 INSET ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER N * 4 lyre * * \ E *s �. * * \-* .* * , , .* ,.,.* ,,,, ,,.. ., .* .* i..1b, / ,. .. ,L * .* * * * (r' * * * * * * * DOCUMENT NOT CONSIDERED FINAL �� * * \ 'L '* * * � UNLESS ALL SIGNATURES COMPLETED ..4 _k , '-1Cir , .* '* ,L _1, ''''' ''''''''''..„,,,„,„ ',., . ''''' .".4.4.4 N1/4 lit: .* .* '* y, * .. J, .*\ ,E triihaL - ( . k •* .* * * * * �� a.. * * I►CI * , :11,10, .....„40‘. ., „ . .* ., - . , , , , ! ,I if P14' igN,, ,,, , . . \ All, . , q - a\\'' , * , - * - ' , ,> ---'-' ...i.-----viirkr- 1, r ., 4 ,,1 , .* , .* . * .* .. -.4 . .„ , , , , - , , , „ .i. - \---z, ,......,,, .... IL _ b..' , . - _ . _.. . '1,-.4.. 1 N7%.41* * ', 9 - ' ,ck % .* ' - . - 16., 1 PiNirilillk:o I 7 ,,,,,,40‘ iiik% .* 7/‘ Aff''4...t*.i.: - :- . . -1'.1.,..,_„„_.„ , . 1-c....,,,, 1 N\ *lik . .* . "k''. : .* - .444,141 ki‘i .k y5.1 . opt „.., , ipoiVAlt , diwil , - op k.„., ID,_ / - .„,,, 4,1 !!, dilur Arf 'k b' .* ' relka 111 IL / IL: '. .4"41 \\ ,,i , , TEMPORARY FILL IN , 74044 � t- * * , * * �.�t ►�'� WETLANDS IMPACT i * * . * 449 * . . ` l� IMt \ 1 .4‘, tit' .* * * . �I► _ , , * . . , ,•,1 ,„,, i i /Po ,-*iiill ' I if:: '1.44 \ .k , .* Alik k ,L •k �` \ . ERMANE :T IMPA*C _ * I . L * * * * * ` Ail* k* 'At** N z B \ ' DI TERM * REt� . R � * * � * �' * * � ` * * u........, . . e:� , o \ 5 AM ON�?PO VN * � �: . A M ‘• k:s' a \ , , , \ \1/4 . . �G \ \ * * * * *,___, . .* , . . , --,,,,,,-... �I� l'IlA' //\ DENOTES FILL IN co NOR, \ \ * * * * J, * * * � * * WETLAND \ \\+ 14\ \ CARO oEPARrMENr e>�\* * * *� *& * ** *dill \ DENOTES TEMPORARY co �.: �o� * * ems_ j //% FILL IN WETLAND * * . DENOTES MECHANIZED AREA WITHIN 50' OF BRIDGE * ** ** * CLEARING ALSO COUNTED AS TEMPORARY FILL IMPACT IN ROADWAY & DRAINAGE U PERMIT PLANS a 03 EXISTING TOWER 0 oy TO BE REMOVED 50 25 0 25 50 IuI11� �� GRAPHIC SCALE - INSETS WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) U-1 31+50-YRPD- Utility 0.02 U-2 75+00-YRPAC-** Utility < 0.01 0.25 0.02 U-3 18+92-YRPDB- Utility < 0.01 U-4 91+00-Y_S- Utility 0.14 TOTALS*: < 0.01 0.27 0.16 < 0.01 *Rounded totals are sum of actual impacts for entire project area **Permanent Impact from a single 5 ft diameter monopole foundation for new transmission tower location. NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 11/02/2020 IREDELL TIP NO. I-3819B WBS NO. Revised 2018 Feb SHEET 8 OF 8 /z d'- I _ !may % "SE I Sx eF610.LIForNo re xNC N 03 rewow�Ii orsicBvrvInrow.uu�rvo._ /`�.(� C C O.P-0165 FFw sxEND RAM"W m 7tlj,'� -Y1T- -YRPOB- spanDews rco0E., -YRPOB 7+87J6 /% zxzxExuxwEo P/Sic 334+8661 Pls Ste 337+9863 Pls Ste 344+90J2 PI Ste 346+I710 P/s Ste 347+44JI P/Sie 558+84.78 PIs Sto 58+3520 p / ej 9 \ per. e'"+• ,•"'*x zx .�""u. A=62643%(LT)Bs=234'4l9 Bs=257'489 0 21917A'IRTI Bs=257'489 A.=I8f48359(LT)Bs-4'57'08.4. / f S ,N +` `:n €+°'•x ,sou. 1 D=f54'35.6 Ls=270Dd Ls-24009' 0=2•28'102 Ls=240Dd D=952'4/T Ls 144Ad YRPOB-ST ESYo.59+3IJ6 - /' // �� £�Ess, L-44462 LT=180A2 LT=I60.02' L 94L40' WI `/ �� / `' w T=222b2 ST=90.02' ST-80A2 T-4lDY LT=I80A2' L- 527409 LT=96Da / k R=3A00D0' R=2320.0Z ST=80A2 R 833A0" ST=4803' // �,�Py f0. Q a;'ra'>=°o` \N�,a 11� SE=05 SE=06 SE_ \ %gsod / Z� Z .. '",<.:.<�a OS=60 MPH OS=60 MPH DS=50 MPH _ g / P /+s •� �/ •••• $ -YJ17- -YRPB- % 3' // '`\ // pt1 /.. O Pl Sia 235+9232 PM Ste 239+2099 Pls SYo 246+30J1 P/SYa 247+6I90 Pls Sto 30+6810 PI ste 34+24.03 Pls Sio 37+6624 t� sunwz II. /i / // ,�' SA4� f// / \ rEl U, 0=ld 0/'S9T lL7J B =f5a 35% Bs=25/'03J' =23251%lRTI Bs=5'3a 389 A=2805'2l%lRTI Bs=d2d 187• © \ // / ® / {' \ excess au awxnrvxee coxnerex D=f54'355• Ls-Ma°Ls Ls=240A0' D=227'326' m --: \�//r' $ L=52534' LT=133,34' LT=160A2 L=1036d Ls'220Dd D=504'I35' B -504'l50' YRPB-POT Sta.29+15:_ ' ��� //„ `coriczzrt wrnix O �A� & _ LT=5'34' L=55398'2805' Ls=2CAAd / c wn R= ST 66b7' ST=80A2 R 2330LtY �-P01 SHIFT+r LT ,f / zn onus,s ry QST=73.4d T=282b8' LT= 00.0d " / 0SE=60 SE=G06 OR=1J/1 i/ ST=7090' { j J � EXCELoe,ro>PG,xs NC OS=60 MPH YLPC 05=60 MPH OS=50 MPH _I Sfa.29+2136 �` / - \ SE EXIST.lOA61 � / � pt.,Sta 1I+989] PI SA,18+g4D8 Pls sto 29+8077 i I i � @ )` ' //// 4 / xz.,ovz �y�._ REALTY must - Bs=I54820% 0 232/d 52.a(Rr)Bs-1548'20% o / / ®� LT=1p7A ° in n2sd' Li=ll�a7A9' %� l{ w, -_-� £' �� H/. ✓ , a /i,.�j -MATCHLINE_ Sr=53.72 r 5922r ST=5372' / ST R29Ap8,(p' £ l +P�e i i ii c Q ° a SEE 247+00 DS=30 MPH I 1 f w, n / -/ . • ✓�,// p / p oV�.^F, w+ SHEET tVp 'Y RT- II ,$p'y I p L_ 0 5_HLOR WIyDENlN6 9 ! f d//// p p _y-LT-CS f3\\♦♦ti�� ®Fxwb�■1 MR 3 CEx uC /` I :I eia I y / 0 0 cr tl ��// /f p %� �' �E-iS Is' I i s emsw w - 13 I -- -YRPB-SC Ste.-+4136/' /% J / A� / /��/ /f p \��, �I/N(,i 1 �LAII ✓ u naooaaz src 0o g V �� y 1<,x rLLD II av� -- pro / / �cA P ��// � E -y 7-s0 sro.s4s+o�D p�\ ,� /� �• 1 1 I I-Yasr ., Ili �(JIow,E> n °� ( =n • Np \ �� p / � ��' ; � „ / 11 11/l p �e r. -I 1 ��a°piles 1 -,� I W �, ° -7<� /� , �� zx�.,eII�I S�p � y I3 o �L _-7rs�: II Pi 'E'bf ..cs o /s a / p /,.-' �' \ \<.e k�� + "'.1�• I �I o I �El �I 1.�'� 14 �'. :-. v5 q" I l ,, o/ BEGIN APkOACH „11 kr I x '.y e = �� it m+ ""`{ _�-�4'`� ,,,,,,,I.,-�_'' ® � i Aux w.w�.zss c, 1 I'tilt' I II I _I r i:m X /°ANN'S-PT Sro.76+6992 / / RPA Po s; I $e Aa aro cossra ss I 9 a :m g Ia dx ,,w_u I -/_._JnP �/ j r / STA56+3328 /'^//, I ��i 1' Pin F 1 m 1 Ir 1 r\h �/ Rrcn fziec C +LDONB Sfa.68 �e'o„liar _- _<- w 1 /� �� �u/g .9leeeri II _ .4�zwce w •-__�� =OWB _ % BEe BRIDGE '1 END APPROAC I . -Y_RT TS ••'.L2-44+70A9 ssr onus Q %Y .Ewuw i u c\ 1.� :au a � -__awn �wc" ,"H9 -- �z I Yl tF+:>•5 .ROACH SLAB \ en ,-I- v . nry1 l ` YRaB1cs s34 wo �� i sA6+72oe i"g//.���cr p ®e � 6}hREL.ua /` ., xnnx ry \ a 243+9933 5 7I s° ��-- •. ofl> �/ // ®� ® � n� p e,►y I I �� eRrocE xr onxr„ 1 /� w zo I - 1 5 .� =m« F \ 1 �' I-243 75P Z 6L•5sel ub�(� za:ac 31 a mes> rm.w. IA�� m> ozE cw ��^.v mm mm,�nw wszsw` / // �i�` \\, �/'wan._ \\ p E�BRIOG �r •1\I _ �� . aGIN WB55HIFT `� O 9� % Tw<�' �' k`--w +,c ,w.� i� _ "..` e ® � /�'ci _ _ �. `�;\. `:ory s �, •�ve�-�D► _ m:.,rn: snrec, '-r -_ .x.ry,Ph vi 4m i _ _ _1T_ z. / L•:.. t o`� uss uv r parr�rr �y t/ F - 1 �- o I- N 1=1 _ /I iE io _ __ f_ \\ p r TS •SYo.343 30Jr�w.�� .iw� \\�►/�.. __ 21CT� ` F r w ,>Qs. �,. ,. b.<. a . ,.�I - - _�jutiufFt •sarx•, _ �m :n enn.> 7 zw-0®� Dave-:rF,r: T. $,�' .r --_ �' �0���N 6-0�r pbi� w N ."` ., •--=z-r ---..�.,..��_ _ _ __ _-- - -.- rasoe.,ry��„ _iiiirEr ��� _ __ "4 :e:`2 w.o. B,�"!51`e'aC - N w w - - ---- --- ---- - --- _"'� "� oo n E=MIf/4//YE xr<-C v��, _ , 1 _ I Ps/�_22 ET. '.'S a �M w :p LCOWB-=� 70+00 Enux � II o... ... =i/Fsr �`'$ =I w=rss G7 1'G G:�Ti�x3 s� h, m,z c - _ ------- - o,� ''s �i !!s �-rrii w ,lws nMill stlATIIMMCE'iii��o�s> �_ 1 w J �1=26BTl04Zpa3 11 --- IGGL _� z.., �'s3- GGG4'JCifiS KGsiss Gl Gex"GGL - --- `s- la '' LTiel7� r r..e.�em�;arirri__ O`_""'^ vll• �ra� .._. �� J '� � ... • ---- - r� L h-„ram.. irr�:-- _ - - - - . t8r 0M4ArrN =.r^• r�,- r..1� r�Era 0 -rxaremri.rxinsaa _---_ ® �t a•T�®�-e> r, SIs?.s 3_ .. � sT.rlEM/l1MM!c!• �=� 0 -- LZ GW INII Aiiiiilaiiii.sssssssl MIAs fff sssss sstM-11 ==1=1=== c s�� _ ls1!yJC GGGGssf GIItsEif GSJ� SLT S o En -yam > - H� f - �3sGC :°.L':�-'GssssflLGSG_Gi"' ' �r',: 'n os®s®ssss®�' ,e� i z.0.C,.TO wzc®_ IS..c.., :- -- r�®p z.,.m, --- s,.:: r 1 rine° e® -`"" 1�11 -Lcoee- _MIEIPEIMINI - = s19LGi�_. Sell Msssss � el = -... .•"• •,� ------ _ - .L LE" ".3 „-0� llEVMM�ss�aTMsifirAgVEG7sdi1i ..Van,'♦�NEE?PO r2il ssl®sY "a<„ -rrnPR-Pr = - .EM°„ �" ' 1 -LCOEH PT S10.79,15 , x +i Eu i=s21r\\_E��� "^'•�a 1 Q = � .: Sfa.63+50.87 c �. � �66R- C -_ _ ems%/ _�sY� 1 _> p��c¢w� Q N r�.� W TT... E , - TT 'I'RPCA-PC sro.21+39.9 �F ur - _ � + s --F//s � � ® �"fiu ll .` I►�2 1®ifl ® p \\\ \ In i�1 � ,a<,ry F `4aS`�'�:-� ---__-- �� ® �/I 1 /�/% .. _ _ --_ rs. _.` l�ii i,l •r _ - --mac \ Si 7�3663� _ a Try y -- Ucx �r� w Fn � 1�1 r.d_- > , „ry,vnu.oR< �i e// / ®,ae„',r � :clry€B sllrP£i Z ,.9<�,n a,Rip.., .G 1 1►Ya -F / brow, u��w.*� ♦♦, .e.wo„<,�ry ® �2:1, / / ��r: ` I �I WeGIN e-r.' .,+...r �f r,Gs�l � �i�� A» rro w.n.,,.Ex„ .1`♦♦� onx,w ,e�., .y1 // / �.. Byro�wls9 -.M IIIJflW ��I� �- LE r.ro.r b+ .-. Z „ w�E, a liQit ` �+ • �^ wwwwwwlss.s��i-•11` ..... ,,,DErn.r. r�,♦♦♦r 'a:, r / // / -aeGIN APPROACH. l II , �1`�BECN JwPRoacH sLaB2aRr�r a � • ,.. •,,''::•• s's'+`�+� � 1' °�. �_ �i♦ �� zcw. -YLPC-CS Sta.24+27A5 -lr 340+J ♦♦ �'� ` / YnI IIa• ft -vr srsro.z4D+sa�lI ,u`x i I �� h ( ' 'c 1 an ( iV 1I Fws , I �. l • .:•aPRRb'w sLPBr ® i� c o.•' / p/ /1 -rLPc-rs se.ro+9/68 ,U�� ..i l -,• I\ P . wLwOzur, 1i;11 / fØ. \, *• x«, rox,,. \� Y, ��aao,� I ,, �2� g p 7�U�♦MIS; 1 ' _ �F s c waeow: p \ Aj•a 0 a P and 4�,♦♦ SEE SHEET 3.,FOR-L_WE-PROFILE a o o ♦O♦ --SEE SHEET 57.58 FOIE-LCDER-PROFILE - - L• - ♦ Rr.x.c SEE SHEET aa FOR-L ELI-PROFILE Lcave \ ■ ♦ .i S II RIP w ♦♦4 ill al nn s a, b m 47 1 5to �. c Y 2 I 3+ u,r �1�e: B PI SY Pl Sia l•+ ••PI Stc 38'12.46 PI Sta 0,612.1 x Z �.♦. �� Wx,I orv, 5432 (.S SEE SHEET 56 57 FOR-Y_LT-PROFILE I13+9/b9 7174O6 1:�, p p /�I♦, trig 1 =238'13zlLTl 0-238127•(RT) 0=238'12.7'ILTI D=508'07'lRTJ \ �� �� is i�. �a'' c uP5 - + ♦�,. ♦ 1 I c orvrsrD=d 2d133• D=d 2d133' D=d2dIBS D=O'4207% -YRPC-CS Sre.lS+ll92 \ � `; 'k©70;,.,'iv Z -YLPC SC Sie.12 5IB8.♦���♦♦�♦ yI I' z a L=78237' L=78237' L=779D6 L=73159 '�� �1 1 j p PG�♦��� 1 1 Ir�I7-39126' T=39126' T=389b0" 7=366A4' \ 1^'�' ` `�♦�Rrcv,�i ryP� _y �yff,Ai�J I M.. p R=/IAOODO" R=17.00OAd R-16928Dd R=816000' \ . 1'c ���;� ©p. cS Sia.3 9Q•y �.� 1 I IsrE sxrn es roa verc vaor sE SE NC SE=NC SE=NC SE=NC 0 i 1T- ♦♦�, IsrEsxrnFbroa verc<vaoEsesresxEErroa nro�vnoE seE. sEE sxrn n roa raoE,E :# / 1:EE sxrn 73 F R-APE-on.a �.: '� © x'�6 G��x i ♦�l 1 p J EE SKEET w r roa , ENVELOPEOS=60 MPH OS=60 MPH OS 50 NPH OS=50 MPHw p -jL1e` ` rm'rsA.y.,�` p p p p 'IR*�,- �'1I ` 1 -CCOEB- -YRPAC- -YRPC- ® '"• Y,/�\'��, �'s� �. _ L�� ♦� �� 1 1 /�1 p 9� PI SYa Iz+6433 Pls Sfa 15+5995 . • \\� w, •a♦�G,..0 t♦���'♦♦..„ / * 7s Pl ste 67+4378 PI Ste 75+2615 PI Sfo 58+7499 �as\ � ' 1 II p If�I /� 4p A=2'38'127•(LT)p=238'122(AT) 0=I1925'102(LT; 0=33/239P MT)Bs-5,57'08.4 \' ,;a \\ ''A'R� `Gr Mr S �Gs� %. 1 1, 10 p p �ql ' �°G.. D=P2D'082' O=Old 185 D-6'5241.]' D=6'524LP Ls=I44Ad cnourv°ow Ir gw q�\ onas�av f/ I /� L-785.69' L-779.06' L Ib9258 L=5/l92 LT=96D4' x ��• C cus u EVE / (,// 1' 11r. L} p IR o T=3929Y T=3896d T 1344D0" T-26433' ST=48A3' vx • ma �1 �� elk \\ C / / �Pu... I p p pS� d /-n R=0A720d R=I6928A(Y R=833A0' R=833A0' au ^' e\ w°_`Y""�9 //i,`.% 1 p arm SE=NC SE=NC SE=06 SE=06 a r: „® q I I p Lv { 3 DS=60 MPH DS=60 MPH DS=50 MPH DS=50 MPH +''" T N \ - ••I I r 1 �s�•/ 567ao 17- �� ror3✓'-rkPe 16+5592 ��� � 1 •" ® _ { 1 % I A p p �16/ -rRPca A / ,,, %�` ' v p p p p aired c [ 9T Sr91 Pls Sfo 3146693 • �.,�335' / / 44 1T TI1b / \ 5400 \ ST •���� \ =O6 / _ \ v` / -. eo ♦ id 1 uw,rau s wse g 57200 45.800 ' 72500 51,7O0 DS=50 MPH _ �y�QG G►9v1; F da` l'1 1, 1 pn o 1-40 ,i2 0� i6e \ I' 4, ��/ G�J , l�tit ETCH(/NE, ,�, fF \ �� // �® o p SE STq• 3 �� 1 j ,eur,o"...a AT I-„iNx.<x.NGE a1 � �� i {\� Iho o� E SMEE•? 5+0 R;. zi 6z7oo g gxt4�� TNp 22 ,y T n500 2017 ADT >y '�\..... a LINE- P 1•c, rvo ,,,rcomae..,on, as n 204o ADr \.�� \\ �� j� ppgTCH _YRPAC-5��P'�k GRAPHIC SCALE d \\\�\ '\I i•;•:.;., �+ STA.66+90.00 Z 6 S so ss q so qo D''''', o.: SEE SHEET N�.2 CHECKED BY ,WORTH DATE .,,°1, PANS `I lg,Mor°ien,Square rvo xxsr mncr ° "l SuireAbcacicarxorgr oies 8io3 PRa I-38I9BE x. sneer/xo �r y ro �r xr N xro V ���ti MpTCHLINE- SEE SHEET NO 23 .• ` i6, 'w'i`u7:A4') ‘` "`"`'°r,��f4 C''`c 00.0 aHaE...aa.mH.,v.E,aa.x • / , _ b 1,9.99r,AIA...A.�.w / 1 Q Z Q• I ��p,(CY\�'yCL C 5� 5� \ssii - ' .r•.,,gI/Ax50QO y ✓3 . \ \ e. YRPA-TS Sta I0+9264 A � 4. .'f 1F `^'+rq,�\\ S-(P• '�x�SGfG'(�O \ \�- \\ -_ 40. f `, ono.es -rRPa Par sa.rD+DOm � + l.. ' /e "`""+�, \`\ •J ` \ • YRPAC-ST Sia.38+78J 1 pr,,,.,,,,,.,''.', :',:.•,:',..'7••. f r''''' .---a---- SAP SSE�'N j�e `,A :. WFs° y +` °'F o,a " y r� iti,,,, ,,-N,,,,,,,,,,,,,,,,,,:: 04.,.. .....„,„._....w.-_,0,,,p,„1„...--_,,,,.. `\\ \ \ "> \ e .•H a- n YRPA-S ./2+366. . sez o s-. Za��3 "° ij `p 44\��\per- �� 7 \• f� ► V i ., �_\ \ •}e: pV� •\ \��y,~ -YRPAC-CS Sia. •3itrz,31404t. • cwxaE ''� - r::i:Y D �• 4 r . lir �i V �� 7 NX 111,1, .'y.P.T t m_ -RPAC-PRC Sto.18+2533 a ro • ii.».Yawn y \ \ wx ii _ 1� '''"L'" t 1 \ \ >�® ° i_°ow: T ...• fillif e\ ,�h� • � rf,If,l ° a ° - c a © ry mxcu• n STA38+5525 "i�, - a S° ' - - - _ --\ Q , SEE a�>.., A/yri r cif of i�� _ _ \ , \ \ \ \ `.� �\ �� �� .awvE a %x�a�a4 . mf@/- ,r fRh/4�iiirr r �C'�pE .��.• ✓`-'+i1 \\ _ \ i \\-E i \ YRPAC-TS Sta.34+8874 °� BEGIN APPRO ,q �� \ _ ____\e � oi d-,„ \ \ � w� rm' \ -", \����� Yp ._`+ • a r�I 'union" : � \ Z os l.o -LWB-POT 139+4.' \ u'au cur s us' - �\! - - Xz11°^ ' 1 °lN AP•RO H �� SAT.'raE wnry % iomn ,.- - END RECONSTRU, ON, a cuss a II"' - •\--�✓ ��.4ry ,says11 x•t' f11111 - k - \ ss,°Has a° urw Tr - xEn.--c<qrs, vfY1 `�l AMP*o litiiij. a.r�': L,POT I50+I630 e BRIDGE --- • - - `---, W a �/� \.„.: - A, gill ; :EGIN RECONSTRUCTION / NO WB� ������ 11 , m L-__I 150+54m --- -- - - i_ - --- N •_ , _ c ®�•..e•Ez s., . 4'-�. " ' END EXIST.APPROACH SLAB //`� %_ \ �L •••iin. i ,r ri!, wnx �' W -Z-_ SIEGE:EATER:.MEE o,cx a L_WB-POT SM.7 YOA7=�-�` _-_ ----- 2• • __:__ --_rlfA' i f 11 am °. F�/esa im Ra` i -LWB POT 140+6263 :s csE YYcusz:umnr /Nj L-POT Sta.145+60.L0�--�� - Yi' -fir_� W°�s na.- >_ t �� -hi _ `- \ w:-P1 I.1°.+.:.f4 '�.aw: r I i,,,nri� +�f uom� - -- x -'-e-c_•'. _ __ s __ _ tj`` LO :]g nor:. . --- 10. e o N l it I �!1 - .....- ���` 1111 ,R/Il�li f!f F ov'�o a.eu Ci ®A J ■11®i�t•�.._ �--.-. �- -,-� _MI. .. sW w,o.. :s.a .:: A�n 11/I ° ._ _ F�J _ _��"` . .._..`�xiox,Fr"a":. Lae v W - ® C af$fm)1 .... �....y.I N i �.I f -rr/rrP fi •• ems... _ _-- �'� 0 �H� _ M w ONiI�Id�m 14!34LiP _uJ- ��� 'C�.S,imI �' it MVP �; - - -- -- `" ■ @111�ii Eo 'it ` ® ��,EwINIMINIt=��� Lt'/.mN@I11 aaa„°<srF la..�m `11,02 _.mmm®mmmm��i//P ti� -fry .Y loom rWIN- o m• N 'o Y Jer, intrismii - _ GEE - - - , ® r .n wE _ - �€�.:�wc rz i % ems- t • �. + 'r: --I rl.�ii 'Yr L--'SYT3 - ']�f •ram it.�1aT���. - : -u =■rye -- r 15+BB -I60+E� w� uury e , o sew I45+00 �11' , •,,,fffM/ - ox 2 0 mmnu�r ..,,, , O - P 2, 0 �uMmn mmm111�L .E,o.E,a _ =ra -- a<-Pli'Iilm%%/ssainiNIEMI V�'i*--+-. . r rx-,. tT x .-u=. .r,�a �, e�i�i:7.' `J'7� --••ems _ - _ urxmo_- .�-• qn 7*�`c'�- - H _ ��yyyy a, r zra r.. RETAIN -LCDEB irri•�AD Ai i1. 4 °a umma :r.. �'>'' •Y+Se - ^_ .zuov`-°r,. is a�.sx sir.ate xwv--CED N M ®® nio��mseaimmmm�`�,�1 Rn� ow e�i;�6 moo.. frr�[-0@ 1 E,aa,-rano wz��r rsv!*2'rsi•i�urer• .... '" m I • //II.Em!Up�.�mim 1'A1� �„ Girl4 _ fi! -n. 1 I I _ ssaffsss� i'I�hn,riml> i lirsiul�/I� � a,sri�-y '�i�ie � �I ®"� --- - _ Z - 'r�� ii54.19•-PI Eta 99+1o5nc iriir1111 y ! F;WP'F' M. Q 'Y..Y . ec. .. ���u i - 6 Sta F F- ® €m E�, unm ,, s�.._ o jj�rr�_�rs E .. r' _ _ - c - -��- - F- \ is ° F°xI `\� I "'r43 °P./ F BEGIN RECONSTRUCTION ENDER SHIFT ` 3` ,x v IIYIII ro,i .�_�i� -- _ - -mac __ aa"zr,aAaaE• - = s ram (((' N �\ -� F INNDN PPP,STRUCTION ' r No XIST.APPROACH SLAB -LAB-P07 5/0.145+EOA7= - '''"- - - �_. "'-- � _Af� .. .. .® a-- -!s r _- I -L_EB POT 140+6263 -L-POT 566145+60M(24'RTl r z _ _ _ c-� xw - sz'°nnc i --- W -LCDEB PI star-92 l.ft.._ ' I" \ END APPROACH SLAB a e ®� w y+ /I y--------(. ..," r __ ,..L .. i- c �-c� Z " - w so°. LCDEB PoT 94+1a55 s rams°sr sS oE, - ,i 7 N" u A Y.. B+00]2 YRPO-CS Sio.38+g953 ,ra, - ° = BEGIN APPROACH SLAB zx.°mrvno uxry .• , __ za azru,v ' e oEFa„x szs °" Pd/ Eeo`vs �• !I ` END BRIDGE ovnsr au.z - ro \\ �BEGINBR 92+4g7 ir.c 1 1' :_' LEB POTI40+3897°. s'EOEr..orv> 'o. ` o� ` >+° FY' �z,s _ -, ° t '.a:°,a �$ _ _ - "r� EN�ar laarvsvoxrnn Nana 9 V \ 1m+ ,.,s.MH ! ..®'` '®,s. .,,,,,,- 1 ,- - 7 I y, „/ y `-ma kR uA'g:.'�, - ,<x i \ s" \ -LEB-Po l39 1A.47 / / _�� s I f ry ?Be (�Vz N� s"� Nap wuxE wo.:een rc°eP a" f oe i°x x�"L". Q \. \ s°v�.xEr vim/ / i o /°w. +. How.,,s rE�///�+f' Si"' �g• Ifl v �� '• s� ';°"°a14,,,,, .-,___.___ ;s�.'a�Y .,� `H '�f*� '" (( ,cpc as$a� .cnvna;Ei" �,N a \ / / /; r \ �..RI,/+}�, �! o� i, NlEps as (, >ERE ::, �,�a,:;w.� `as �rI ��,,iM/ / it y\ / i / `�>` 1 '' I A' _' sS + Si PlSia/S+CS PI Sio 22+59.42 Pls Sio 35+g476 PI Sla 36+83.48 Pls SYo 37+g216 4/ / / / �. ,; BEGIN BRIDGE _ $« 8=iC3507' .Q p=P8f548'350(LT) p=605'5/b'(R71 p=605'SIb'(LTl Bs=407'3If p=54634P fRT)Bs=407'3/J' /•� •• \ 'rx c/j -- • r' " -• -LCDEB-PoT,OI:•°99 �� ftligk* Ls=149m' D 652'MT D O'57'23S D=d42'I0.9' Ls=144m' 0=543'465' Ls 144m' z / xc.zMmxr va'j:mws� ' // a 41131. / / /•' '•;' ,� - �� LT=%D4' L=2b4326' L 637.48' L-86136' LT 96D3' L IO139' L7 96D3' /J / i•••<.\•. END APPROACH SLAB �. - c 57=g8A3• T=5274087' 7-3I9A4 T=434A9' ST=48A2" T=50]4' ST=48A2' •'`/ c o '\cat -LCDEB-POT I03+55.44 bu3-e. R=833.G07 R 5990L1Y R 8J50Dd R=l,C(gMP l / °.°o ao r seur'w // �'�' L�\ -LCDEB-' IOI+19.42 SE=f16 SE=RC SE=NC SE=06 / / E°nui°zz°1+'��ils°.cr �,r _ END BRIDGE `°•'xc.,L�- OS 50 MPH OS=50 MPH OS=50 MPH DS=50 MPH % / �, / 1pt� ��� ;�� � ¢`.':. g A• . .. -LCDEe-Par 103+2524 w� \ / / / 4, do// R; IH R;N R icy PI Sta 4/+3283 PI Sta 48+6273 YR�PI Sta 52+9B36 Pls Sta 55+2961 Pls 5/0 11+g8/>7YPPSlo I5+26D1 Pl Sfa 20+6I50 / u/ .4.40./ , - , a. Z p=9533'l53'fCTI p 29'Od 00A(L71 p 2223'554'(L71 Bs-420°32T Bs=407'3IJ'p 32•l6'41.4'(Rr)p-34/2'02b'(RTl �9 X ,p .r. �J/ j/ aJ} Y• D=652'41.6 D 543'465• 0=601'527 Ls 144.0d Ls 144.00' D 5'43'465. 0=644'26.4• '4'y \/ a' i,ejt.i.„/ YRPD-SC Sta.28+79A8 \ Y--:-SC Sia.3241E40 L 1.38922' L 506J5' C 37/38" LT=%A3' L7=9603' L 56336' L 50738' / .s JJ��% /'� ° T 833.0 T 10000 T IBBOd ST=4803' S7=4802' T 2893P T 85000 / fir% e+ r�� .• O R-833m' R IA00DO' R 950A0" R=l,C�m' R 850m' SE=C'6 5E=06 5E=06 5E=06 SE CG /' ''''''.0.,, P '/ /'J.-jG � j , � DS=50 MPH DS 50 MPH DS 50 MPH DS 50 MPH DS 50 MPH ft / � 2 4 j,/%'f'�0,'"' ,/c/ iR / ''' TS SYa.27+35A8 4A f�'+� sEaxa�•� PI Sta 22+111/ Pls Sta 28+361 PI Sta 29+76.04 Pis Sta 31+33.02 PI Sta 35+0961 PI SR,38+4514 Pls Eta 39+2954 °x`u'i'iuN xi wuiold" %�Ji� f sE on"sue ¢JE • A=519'050'ILTl Bs 607'31J• p 604'351"(RD Bs=127'43.4. p If 52192 MTIp-2'37393'(FIT,Bs 643'079 o�_ E. / ssE°nnc:s / E° d ,4 °49 D=U43'40.6 Ls 144m° D=643'46-6 Bs=407'34A' D=701'54.4' D-2°5Y 532 Ls 120.00' / j � / O 4 T=36 5d ST-4802' T-l96% LT=183.3 T-2932� T=44.46 S(=40m' / �� `.4° we np vpgrxEaS uc i�' ' R=7870m' R=I06 ST 60b2' R=2820.Gv7 R=2AOOm' 0 14 SE=NC SE_ SE=04 SE= 5 ® e, ....„,,,,.../ / ,400.frer:4"M4 �1 / 1✓ anv OS=50 MPH OS=50 MPH DS=50 MPH DS=50 MPH f ...44/ �'"- �� �/ zvaa a \E f r9 `/1q Y.� Js 0-0 �ti T- I �ax PROFILESEE SHEET 40 al FOR-L Li-PROFILE SEE SHEET all a9 FOR-LOMB- SEE SHEET 61 FOR-3RPA-PROFILE 67 FOR PROFILE1 9 // yip a..'°: a ,a'EE'?� ` H °p,awp_ o-rAOFi.E SEE SHEET 3a-1 FOR DRAINAGE DETAILS SEE SHEET 71,73 FOR-NODE-PROFILE GRAPHIC SCALE s�arvEa... G.o owls Naxsw PLANS o..n 'l +~� 1001 Morehead Square Dr. a O c� q O PIPE OUTLET CHANNEL PROJECT REFERENCE NO. SHEET NO. .q' �/ / 411, " � Suite 610, Charlotte NC 282'03 & 38/9B /5 �0�p� /+ q0 s z I NC LIC NO.F-0165 IRREVOCABLE LIVINCgMRBELL `"� STABILIZATION „ W kW SHEET NO. SEE DETAIL 9'. t: PD O �\5pp0'1 +/ ss�9. WILL 07E pG 177TRUST 7 NS IPy � Ej ROADWAY DESIGN HYDRAULICS Gam. --w-- 'S. ♦ ENGINEER ENGINEER n 90 j �j �^ 11 lig „roc' ,,mn „ JB wMH ``�,l ,,, CARq ll / /// � Cli) �y• .. � N CAR"'0i o i /F°///<E + It.L .. 351:2'LT �.`_�:'pE55/p•;ti. . O• SS/ N9''.. a 5 9B� / / / AO +00.•4-L- _L /� . SEAL :4 et n �P/ +pg/ _ ,^ i� 328.35'LTj 335.64'LT • //� I 033007 ° $�L f1a yY / .. . - / •. 1 E 041292 PGe7 // „�"//� k �L\ X .. / // /%/ �8 ,',9if.NGI NF,I'., .`� �1:''FNGI NEE' ` `✓ SR_Yl5- POT Sta.30+07.88 • �R- '� Ptj> CN' / /jj ///� - /.. // RETAIN "OJ •.C.••`. • END RESURFACING /RIP i /jam/ r�� `$° �'%��PHERa„o` YlSRPB POT . 8+00.00 2._ „""\e /ii//4 / /�, -I-�: J. DONALD CLINE �� / - / //� DB 2397 PG 355 ', iil k,,• 3XI T.LF NCE \ / // C - 36"CSP e J�� DOCUMENT NOT CONSIDERED FINAL / 'FV/ e '/ DB 776 PG 152 \)s , % / �' W II UNLESS ALL SIGNATURES COMPLETED /i// /i i/ -1-A' X�- �T IN�� ��/_���9�// /j// C 'cer,.� 36"RC-II i P4. Yl5RPB ST Sta.17+45.68 R/w �� E // RETAIN //// 24 , :x�snNc�7CiT'�R'._ 01 _ 0'F'�v// 40'51.2'�/ / B, , JB H g, o / ._, V* / N6 , p65z7� m Fo �7%�y SG�e' // .�av ,,. -Yl5RPB- CS Sta./5+45.68 219.21 b 6. r.== -Q \ /-1// i/ c \ N < r Ln Z •pN <1514> // / $1 // 206.60'LT ,AsnN.. ,.. 2GI-D \ /// /// G� • ii/ �SP 2. / ,P'/� 48 WWI - \ 18"RCP-III / / // -- \ • 0 O C // 'I-a0 E // C ,n, D W B RECONSTRUCTION\ ;III 4 z / - - 1 _ s-.,N /%/ ��/ I .n.., Q i:.1 ND -..R•- - �, JBwMH Z JQ 7 7 �',A PT Sta.27+18,05 +4730 yY MP z' `j.• ,;u„"";i L,7 TIE TO EXIST.BRIDGE �527� O / t"i+18.91 164.63 - Wg RP �-'� i• G -L-POG STA.219+55.98 W / 170.66 C Ar. 40 C TRENCHLESS INSTALLATION `-� ,/�*, DO NOT DISTURB ;i� ,� <7515> „i, 3'BASE SPECIAL CUT DITCH -� y ,(./ III d' '' _\ S BILLBOARD SIGN E �'" +QQ I , - O I W/CLASS B RIPRAP 36"WELDED STEEL - MIL -- //� 'T V � ,.-" SEE DETAIL 43 J� r ,10 ,7`.I C E-C .-iR•:. RCP-111 rJ <1501> i I REMOVE ��� ,/ in► ,.*"; G 80'LT ,S !,.. ,10AWiirl ' MOVE ,, g, END RECONSTRUCTION ' I B MTL AI u - i MTL ��� GONG BRIDGE C C ..� - 4 - PROP CHL FENCE 161.64'LT 'LS 8:1 BEGIN RESURFACING a m0 I �� -Fd�.i/ N O_------ Yl5RPB POT n 585.9T MEDIAN WIDTH TRANSITION _ Z ® 6412 /�Sj Sta.16+00.00 D =ONC.PA ,� RCP-m .► S a e corn � �„� 2__ ,1 118.5g '1B vUMHwoorm_jonowarm ��I-40 WB /ly 051m 18 REMOVE GREU IL-3 8;1 �a-� '�_ - 300'LANE TAPER WB INSIDE AND OUTSIDE LN -- .��PiK / l NJ (n W �,� -- viA N� 'f rV i + 300'MEDIAN WIDTH TRANSITION (WBl N<1500� r_-,- W®� _ MTL `p / �J I N�BM � - _���- 0 ROACH SLAB,n r I5 CABLE GUIDERAIL _ _ il ��.. ___ -- _ -4 218+92.9 -- ti +00 __ 4 1,L i MTL 8:1 END CONC.', '/ / O 0 LLI �� \\R, REMOVE __-_ _ 55a- ,�.,�.we Ag S--�- - it- C' - ���,7•�y���'yy� Sa �'c N 6 _- - _ -REMOVE - _ _ _ _ - - - -0 _----._---�ro _----- �!" + .. 1 _. ' 7-4T543y-Q--24-RCP=1 'MiD 2GI 1 �-.,4-1T- 24�R�P�114 -�- - - '- 2 _ - -=a •� F -G"Ji /t\ REMOVE , gg / Ln ,• END MED.BAR. I REMOVE �y_. 2y c F Fcmn\\O INLET AN gI 'IPES d 'l' 4- ' f ND EB RECONSTRUCTIO4. 77/pl RI , L FS END APPROACH SLAB N \\IDGEf / //q�/ 1 O n Il o __ 885'EB MEDIAN N R _------- ---- iL-POCIE TO OSTA.219 28.51 I I.. • A, ttn our=�1 c \ I110weEmuma 1_40 EB RAM.,,.. + RC �//D 1--; { I „CSP eF 36" /<7528> / m1 /0-f=d --- _ C -- -----� C SPECIAL CUTDITCH , �" �� 1 ,�in M. 8.1 40IVial , F`- C F --- W/HINGE I CL B R P 1B :�,1n / Y(n'P) -;' REMOVE _' _ _. C SEE DETAIL 45 2 TONS 7 SY //'�/ RETAIN y0 /� 40 // / f 7' 1nRU_I 02GI-'�► �nn� Ca -Y/SRpC- �� , c n n OE; �� l VA /// o i /1 W �O 53 ,?4 a O a C + zGl �h� 4- c J i <1519> ^ //O /� \\\ /, O // Z cssiO ------ 162 89 C7 00 <1539> JS"RCP/II DL. ����=1 \\���C I/ / XO� / // I J C C C _ .. INV,g. �t �� I C I/// l/ c� // I RETAIN & LINE T "22t::f. -- _REM•'' 411.141W9ce` q \� 1 ���\ C /J�l • Q--- x .'sie - =-_s_ ,.,�1r�'w� �-. x� - \pa '�AfP p,,esr\\� l C /�/ \\ / I ; ✓ �V r NG R/'" O C a 0 •a' -Y15RPC- SC .. a.127'68.26 c x �^ ::.Fs tee• - =���\` /l 1 \ RCP`� y -0 -. Os BERM 'V'DITCH +...� x x _ ROP_ \ C ,yp // 1/ / \ t 10/ QS SEE DETAIL 42 -mow J,�} \\ R G / /1 ' / G I o e PROP.CHL FENC REMOVE `JM �p m \\ �,C \\ :11111:: .// / y/� �//"`\\ / IZ Q L,ROSERock HOLDI 750,TARN L1NF T Iiikery �+�q.\ -Alit :.P Rl a_ 1I, �� // l / L' \\/o /tD Dg 279 NG' LLC AFFR LT. . 4Ff 3.•• e,., C 48.wW �► �"�8a1_\y aw` �'\\ C // / 1 / \ )\\/% 1Em J 3PG �__ \ F// /I ��S/N 2474 - illior � / INW881.9 -'7. _ '0 yam\ REMOVE / \�-\i GRJ/�J = CJ Elir c,,y GI e• Ba -- irta, 4520>•ox ra, / 4// /j pG/END RECONSTRUCT' E p * ,-, u-`•11ffa7 � RCP-III 2GI-D / %/ j \\ aN"// N V ° a BEGIN WIDENING/RESU' * , a►.. aFMo • J o v'�7 Sl I/ I 1.Ao / c: a igik ,n� V 5 � + T Imo* a -Y/5 - FOC Sta.l6+ti.00 0 E c� 4a3 ov F `/ 1o'R ( � m; // \\� ,<e Q YISRF - ST 22. `�m L---LIE Is acP�n e\R ' ��`t Y j X�/ 6 ��y o Ir k c k P T 'I/8IND C� .TION Yl PC CS Sta.1 �22.14 o REMOVE \� Yl:°P '0T 'ta...k 9.24 u, c x c / ,. "' ,,nn,, a./ 0 �. C ��' �- \\ a 1 '-/�a� RETAIN/�, OB�2$2PCE6 365.63 C4W # _ OE �5 P Er � �"t _ - F�, Q +64.E C . � 3 ISLA D�/ l lS-,POT Sta.18+152/ / **�. J -Y/SRPB- -SR-Y15- W 400.08 P\c� ya=e�b'R /' o/ / * . Pls Sto 11+23.95 PI Sta /3+73.3/ Pls Sta /6+/2.37 PI Sta 25+32.96 * Q %�\°4-, LLAR\\// / // . "� * N 6s = 0'29'34.4" A = /0°22'10.8"(LT) 6s = 2°59'59.2" A = 36°39'10.6"(LT) * +83.48 7 V m es = 2'59'59.9" D = 2°59'59.2" Ls = 200.00' D = 9°32'57.5" 455.98 / /IG B°p / v Q Ls = 200.00' L = 345.68' LT = /33.35' L = 383.83' IE TO Isr.P,kJc_ s\C;',/ '' / LT = 123.95' T = 173.3/' ST = 66.68' T = 198.74' 0 we eE / / 4"? N /// * * _ Q ST = 76.10' R = l,9/0.00' R = 600.00' ROSERocK } / w' III / * * : \ . i `'216'49 3-- k / Qe4 / SE = 06 SE = EXIST. HOLDING LLc Il o DS = 50 MPH DS = EXIST. Q `/ Q De 2193 Pc 2474 Q / k / ll jll , 0_ Pls Sta 12+0/.6/ PI Sta 14+95.94 Pls Sta 17+88.82 PI Sta 2/4+8/.5/ Pls Sta 225+30.99 / a 1 k / / / / �// / Es = 2°29'28.0" A = 11°18'24.2"(RT) 6s = 2°29'28.0" A = 9°39'55.0"(LT) 6s = 0°29'26.0" / //// / j Ls = 200.00' D = 2°29'28.0" Ls = 200.00' D = 0°29'26,0" Ls = 200.00' Q ( ) / I l l/1/ m� LT = /33.35' L = 453.88' LT = 133.35' L = 1,970.3/' LT = 133.33' k ��l/ e ST = 66.68' T 227.68' ST = 66.68' T = 987.50' ST = 66.6T SEE SHEET 44,45 FOR-L-(LT)PROFILE / " / / /// /* R = 11,680.00' Dw RE=-2,�00.00' Oze SEE SHEET 44,45 FOR-L-(RT)PROFILE : 1 lei \* , 0 am SE = O2 �'I SEE SHEET 87 FORYl5RPB-PROFILE i 1 l \Cas OS = 50 MPH DS = 60 MPH -_ , SEE SHEET 88 FOR-Y15RPC-PROFILE / / / \ Nap w I � 1001 Morehead Square Dr., PROJECT REFERENCE NO. SHEET NO. Suite 610, Charlotte,NC 28203 38/98 /7 NC LIC NO.F-0165 RN SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER NYQ Ge o •••♦♦QSN••m Rp�'p ♦♦,,,,,CARD O, /// e NANA-f 3N .`•2:'I.55/0��''.� O26:oEEtS%pN d✓'': z/ GRID NC '' SEAL .y SEAL''i, 0� //Q ro ',V R 041292 of 6`:�9g. p�Q ///� y/ \\ _ • �gti Xsti-,�.. DOCUMENT NOTCONSIDEREDFINAL zN UNLESSALLSIGNATURESCOMPLETEDC & P PROPERTIES A 30 2352.7g, OF STATESVILLE, LP o �57g• E II -Ps-4 6 J• DB 2439 PG 433 sy DB 1833 PG 329 N mN2= 6'CONC CURB CONE _ / / o V ©# I o ti /y " R-I iSfST :sy s�. ROMAN CATHOLIC DIOCESE o N 6^CO 1C q C� N j5 m .". // 'as.-,,o-- OF CHARLOTTE, NC / ISMLT&BK / F DB 2439 PG 431 �' #'� i( #X,} ,♦•yam�, STATEsvIL JULIA A. BUTTON FAMILY TRUST n �� m .°',e 4, kt*,o + o MONTE550RE / L / _ SCHOOL 'x DB 1 179 PG 1480 .-%�' N 10'37'3 - BST ¢" . 05/ DB 1179 PG 811 �.. �z"E / a +� / o DI S ms �m // \\RC:AN CATHOLIC DIOCESE / BST \\c, ,1F © �� Nm"' rn° 03 17 • 70 OF CHARLOTTE, NC / Q #* * -IF ENERGY �oA rn{ If- THE MAN CATHOLIC -•1F *.;',),:;Zr‘ • # DISSIP-.O' ASIN #2 +87.32-Y S- 32 c"�� m DB 2439 PG 431 +..{,. �, ST PHILIP L/[1 RIP RAP 186.95'LT- �C�➢ can 1 +11.86-Y$ 25BK --/--,1, O• © _ A L "gip I_/p 198.06'LT ROMAN CATHOLIC DIOCESE / @ DIOCES 30 PG LOT E #� • THE APOSTLE 159 � J Z NW16A _" _ - OF CHARLOTTE, NC o• CATHOLIC CHURCH S.•DETAIL 32 1 y �m 51 PG 523 Co 0 Z YE#• •• DB 2439 PG 431 /*'-'''' NN�y## zD mA ' _ -" T• a ECTION OUTLET CHANNEL 176 965LTY_S w-� n 2, \� r�,II .° , = N Z STABILIZATION Pe +55.48 �,0 720'LA• •ROP TAPER L W es.°.#F +�� AI 1 o SEE DETAIL 31 RIPRAP SEE DETAIL 101 S: 115.00 - - + o^' \ •E PROTECTI• \ .- ,n m r W PECI TERAL CL 1191TO P Otp E 9 / Di ` . •:. •{...�� z� _ W N LATERAL'V'DITCH \ VV TH •►w- + ;ASE DITCH +:L.i -Y Q j�- SEE DETAIL 68 E m +82.48 +28.45 i2 y SEE DETAI �7 , , W 41 END ra -+72.72 124.98 ^� �p : •'IP RAP I n wdCLASS 1 RIPRAP 133.40'LT may" 777 / 147.97 \ P'\ �l tl '.i,it CL RIP RA' o ��- .. .47 WALL SEE DET - -sue .� vq,. �xi2! /, _ 140.37 _ i�� �C` o im BEGIN SFB +15.45 c`,x F TONS 5 SY i 1 TQ;.S 5 S T Cl) -:.., �; ._ g`yr � 11 121.96'LT - - , _ _ +oo j12 { yN END EXP.GUT. 54"RCP 18 HW% 9 le2t�� • _S ANDAR7f ♦ WALL W/ARTH 8�` � -- _ B FB +50.48 -��i 9iy:.>.a'�N �_s•I W i 7i .gaW--® '' •EINFORCED SOIL SL PE • --- 00 Ixe _ �9y'�`,`, :iv/env SLOPED AIL REMOVE y I c u < MAW\� �V9 it P � n ,� �" L __. .NJI III 3 >r j'a s- W W � • ��:� TLR Ur gy .. .°.-- ' c iLi/.!A - �r��'•a:.., ___ 48"CHL ^ • GTD .. x w". .�_ X 1 x48"CHL � � _�__�.� ,Y01P .�xSAND kfQC1NME / JP BOX)�-'_ 48'CH�� \ - .- p7J• 'J� 'w f 15" 15"CSP REMOVE HW 2GI LAST JOINT //'COLLAR -15 RCP-IV 1746> N N ��1 v• �fYP n�v REMO 11736> T: 15"RCP IV - TB 2GI `.77 + - TB 2GI - - NW N .----.��R•1?: ri. 41. _ a,_ v) COLLAR lytyp +o53i l EIaaMH�7oa> `� COLLAR / .. ,� 1/ -�/ 1 =18 4- � o -viva y y +05` O "'\\ REMOVE 2GI // EMEI Se 3 R//4= 15 • '-III 0_ ---- 4iiKE302GI 43 .19 ' O Ih 3°.]aC� E MI: --r- Ilir,4 -r--- --rMTY-s- - _ MILT- T MTL T•^.JMED.BA-R. REMOVE - - T .1" �'il4Q d - O �,1^T�` lam. cola. - - . r__ T _R6._Y� ...172002IMTL y - = do t IIMEMEINIr- ,4., O REMOVE // 15'•RCP-IV 0 0 ®■ a.// \\a REMOVE REMOVE CB -ME O N , --- '/ . °° �M� OVE HW a;/ `TB 2GI TB 2GI .I "' r - v --r-- _ - --- -MIM A% ' ♦��BG W ;�I707>COLLA - -- - --.--z-- �73917 �P r 1�1MINA a // MILT- MTL i MILT _® '" 1710� 15"RCP III 1END SBGYL = �`�N._ _11. _ All-- V ND SBG TIE TO CUT DITCH /� CO ► ••..4.,--.�..V41rD.O''.❖A'r•s'> i�CO W/ 15 LINE WITH \ G739> 1B w,AAH •°4'CONC NW R.OVE • _ Q r CONCRETE BEVEL (1713� F F�j�'��a����n r "'LANE VTLAP�E�R R o CLASS B RIPRAP t ® 2GI F B wNMH ��� r-, - s( �.. i�.6%i� .fe.-=. 1- X -- @Vf-- , T. \\\ 48'WW ISBW REM• E HW W' WW & ISeW Q _ fb - 4A�W z Ise {gg�\\ NCP" X9�-X x x48. x - /Iti�V� � Cm_ X� - - -_- ° FOREBAY W/ Me�.:,/ \8" J�,, 5,- �s rn T, �.oi Alb ♦•�� "O X ---- n• • i CLASS B RIPRAP IYI7/ ,.-,..-W CP Fes_'.. N INLET CHANNEL •CP III �_� WQV 2,562 CF- W &, Vx C �X�JJ� / i - .� i •_o�- ♦ DRY DETENTION BASI qg" } - d1iiii • ~ Y/ i"::;,,. ROT ION I _x_ INLET 4 , ,� ► +80.48 ) BASIN VOLUME-2,662 CF €� C � .�_.-' bites% " -- I C - D IL 50 ca,�•L:I 7.55 �+s•• ,.,, TOP OF BASIN-877.5 I♦� '` 6 P' D / 24"RCP-III WITHTOE P CLAS'B RIPRAP _ C _ �- CL I RIP RAP -. - i .'.'07 7I' �`��.Y // 3 / �� W = s-- Z4 T®NS u<�//_w i MTL�40.4B�� _ 50 YR WSEL_875.7' PROP CHL FENCE_ I1 .18_ X�\� PR•'C _ /^ RETAIN SEE DETAIL 3 W ❑- Z - dd TONNtt ,iI- ITOUTLET- -v - - _ _ _ ii��aii'a�1r�� ._. L �� - - --s-ma-\G .r PROP CHL - -Y_S- ST la.J�+1 7-DETENTIO -- ,AT--- _ e=Hl1J7.1;Zt1�t�... - RESET GUARDRAIL __ ' m (- GREU TL-2 J V 3 V DETECTION OUTLET CONNECT T v __ �rF> _„ STRUCTURE EXIST.GUARD @ J *It' N TAND.4 fi•&IL IT CLASS B RIPRAP _1 +60 Y S-r r. \ DRY STRUCTURE et J- .� FOLGER OR/9.5' _ STRUCTURE FOREBAY W/ '-3bTA s 8'VCP -_ GFF DFTAIL_OL`L_ FOLGER OR 20'BST // a_ o s END ---- Vile - -« en 6� _-- �_ -- -- ems-OO •�.F $L re�//- w ss•coNc s- m CO \ ss so' &G U (�np54 � ET�•N� ---- = - 8.VCP 30•C&G "" R/iii % J w Mf_6,36 '., e / 1 1 BST// I I I mT BASIL 870.0' / 1 / II �_ CLEAN O 5 501`� SE6 3868.0' / / I 2 IS'RCP r cxlsnNc a/w --, l OUT }y EXISTING R/w r 7 _n n _ , r+�, Phi II11 / W/FES bLr4L___V y,N 1 IIII I in-- I5"C&G - Iz'RCP IS"C&G exlsnNc e/w -=�=T:/ I �� I EXISTING w/-2/ l( II L� J BERTOLAMI FAMILY 24"C&G ° �,I,II II BLK Q GP I TO �If: �I �� �� `{ WALL�� 48"RCP (=�' I I C;y W �.J __ ry III I LIMITED PARTNERSHIP B� CLEAN - JJ GgxG �" _ Fv #, /„♦iF RISER ZQ��- II Li_r_______24.c8.- --r, ====zq&G�- �� - DB 1894 PG 1214 OUT u BST m I ^, 11 r.411 J C&G -� Io© �4'G&G n1 III - _ *t,� �r ; I �� all �xm �� ,F_.II o, NI 11 % I 2P-c8,' ja II ro� �� c,.. ISFBUS v / X. 24•C&c �, -axxxzx#s. ' cD II I� -'(] �C] or j• DI f 11 A I LG, II I In 0 9/ BST 1 ISFBUS Y ➢III I I: 24" c,Il FOLGER DRIVE PROPERTIES, L.L.C. m II Nr DT INVESTMENTS jI c m n / o c I w 18. DB 1189 PG 884 2q^C&G II I II �� II OEDB 1793S PG L876LLC i 11 ��II I I / 24'C&G 11 © ,Illy II�III� n� '�____-=====JJ II II N III III DX, II co - - Alm II oR< II II RAY LACKEYDB2211 PGR4IRISES, INC. II __---- - - Di N o E rn DI 09 o S o mI I - T.RCP - IS"RCP All IF m III __ II WIC° -pl z II FOUND i N II m ❑ EFOUNDT II IL II 31 -y_,S- I I2"RCP I II II 0_ Pls Sta 34+10.24 e �l "EFOUNDT Ih Os = 0°39'58.4" I \ Ls = 200.00' I t I I uw II m,`, LT = /33.33' III Nom ST = 66.67' II m I END NOT I SEE SHEET 52A FOR-Y_S-PROFILE o=< I oa& I I II �/a s 02'59'22"W II =,--3 R, �57.41' 71) ldsl M.reAe.d StuwreSuxeabcp�cic'rxo'gr oies 8ip3rR::;;11.!:::: zneu9xoqN. \� MATCHLINE F 1l.0 0, t f f t 1 STA- 1 + wx9 v 9 50 00 Y9 SEE SHEET NO.28 Ro. RRILGE 9 2so.iaws% `"B"x' q 35 I I ' ..NO -Y9-SIa.25+3858 /i.e.; 's� 9.800 ' �- -' ' - . 8 'a"«. I z _Y9-P Sta.0+92A3 C€I Iy qv 2�, elg I g `�!'� �l'g: °//``�oA,a+,!*\1V�p IN'..OT .+05.00 4 1IUJIBR R -Y9A POT I AO• � __m�"'" t "4 _ a '.y1' ' i� ®�OI�E r,x.:: °.I�. ♦;,, ;'.' 0,• xa�J3,, 33Cro 3A00 �/ . a 11.I :.,:- " .s 4, 1 I __ -�I menu�I'J=�' J\ er l-n q �/y�y '�' ''I n- ifir f b8 -- g �i/I .�',� 6IA00 3,]� �B00 62700 �c `'td ' h1'.aP4 Y'SII ���' �i __• j°' - -�2'-°-- -- 4 -��I������1-_c ux.sss ALL SIGNATURES COMPLETED ���//// ��yy. °. a Ci' Y! x� � ✓� ` .:Y '.J� • - $ IIA4� DE��� L 1 I S • -n MEW NOT CONSIDERED FINAL n3.9ca n500 �xy ®�9 R:� St-�+S� ,.-ii -T'- .z° r ' .,,,",,,,, ®�%O\M M11.1 =II.le=E • ®� 6.00 1 ' ros NN L °, a$A.I H `�.' i , .�. !I� I �i y,i>>m I II r =r9RPA 5/. ,....... " 15.' �' e' �'JLI•�����II���l °B, a NI 4 9 s. ‘tt oo�ova 111111INIfigni EMI zap zOn aDT rItift �t�vI � E ., a .B q � N 2290'*.2*?:"''''' d£ m PI B r9 204o Apr • h, li - SKETCHSHIP , oit* /. \ �4T.i-, / it - E.BROAD S - -OVER I-7 - ,w �I y �'i C; / SHOWING PAVEMENT/BRIDGE RELATION �g N I P. r �g 1T.I Yv) 7 I Y_S-) x . a'At 1°". w me 'p *WA I 414or SC SIG 22+64 9 5�j' °B, ft ,Pc,BB ♦. j o11 Y x , 8X c"a e ¢ $ k a s \'.. rs 1 Y9B PC 4,- ;-:• .1 W** - .Gil lF-il1Ml.,,It F'' - `Y :,J;�.� _¢ © _�i 7.1T , IE %' • x ,sos &Gafg L&� ,ece s~ I i� >.a� �i "'."3 1" ,�11.Y �' xt.' -20 ��� 40 17 a oe° E�%�.h: `;\'..v I'1C GRID N v°v.c zza ,s, "gs z x°°.» i'" - s e Vi � iii � dl � � „. rm fie..:_ ► �' Ixasx ,A m 's 1 LI r w •. mo.cn.xxc O r / \ � .. �£ �A=. � ¢V\'Y Y L����-''- � \ -9RPA- 0 cwau = .. •: acBEr+r..cEr+uux + I s,me' w ���\ 1 1 rr0 ilk'y r9l•A"�1_'Br��„ xoros®xwsmvu, 3 a.rm \�\ ':: I � :�7ac 15 \�� W•W _ _ • m.�� ' u, + - - I, ms°nu ss8 °aE I'�`s e z . e _-__- �� -.... • _ . 16€' vxx' x.e ,s J c 0 0 > \.. tea\ V.. +3 -Y98 PT Sfa.I3+8020 ® E .�' iir � �t- - _- , �Xu•c � e S ,/m)}. \ z ,A _� .N ,, •.. Po !; /« A Y• , ,T Si,.l lwovece --.w ii9naco wu i�d Q� LI• ,s „ ro 4 + �„ z N 2027 lI5 a°n r w ,I __r s 7 \wv _. • \\ �i 0Y9RPAss°CS Sfo.18+6481 t 1 � C 'ems ",ry^' } _ \ y �eEer °EaM.N , 3� I wog \\ \\ • `.. °� 017 l •„ r w arER,o,nxxxcB,v,z Pc au sv »3:II ' 'al ..:,.� -y`��y-. c \�N--... �,,,�- '� '"!�- iiL'z,�kr. N\ zse• _ iTsoxu.sa _ �' Ir 19 PoC SYo. +2591 i \\c !� \'4y\ , Y9RPA-SC SIo.l6+9996 8} �..%.«VIIC\- a,ewwnuecs r ' s 38 1 \' e . %x oa°BF FS H°x s� n.w� p][ �j°°}}t, C) .. °NwsE w.u: -- rrLiu \ - cuss n ur wO-Y9-PCC Sla.23+2591 ,{ !' A POT•a.28+I531 \ _ \ \\�� " *.;'., .css I \` K x ge`= - - n wi SP -PF : A6y � POCr o.23+52J1 � / ,^^.cfit\\Rz.\ ` ��•zzFs -Y9RPABZ CS SYa.l4 x 1 /0 �c Z , \ B�•. i 1„r,.. '1I.ill •LPA-P.41 _ -f1/ ]-SI ,,.00A6• I� ��\«.\\ `a le' mx„o�°`n� Tx!. 2'3';•, Z G u1f er, eowu,sr. ezwws � .e.m` p•.. -Cy xo e x r• LflB3iQdlI�IFiRld10 xn. PROACH S-POT-47, 8598(660'04 W .. \�'\\\ s- " - ,o �'' �' 22•- * F "°eEar a � •B; \- -. �J - ,,• .,. r�nsann.E.exd£r3 u.: •at +.ac '^" oe mz Pc oS �Skr eE 'a r,.- W - f @.91®i111�4rs xu , ° sY /rs ,�,c �---. "�5/m W x me-N lif 'a o W « / `a .c:Ni l A I�■i�li' } ��4 _ - xT l \\ s+v� toiletalt W 1 Wart �I rzcu o £ ... ' 'j�ny w x ` ��x '3- .I�I ��: :x i.rYi�`�xL„` R■��.[[yyy®�' 'ppII ,r4cw \ a ��1FFvr- ,n W - :. sv I iilL`Jile�ll' - , _ /�iC , .- C ���I� - l�GiYf�'2 VI � Rusk �,.,�®9a " AMP .w=� box.. .� .n�.� v= a e 11`-".111I°!'li2lii; � • - - °e ,. .- NI w o C r .,, /....o - iAmo .�� n o<.c i� %I�.O�AIN IIE� .I'= - O " x z . _� e: ° .....>. �. =-. rw'i I '� + pN .. g+pp s::,_.-�"x"°.` ��. ,,, a�x ... .� NamNRIRE - O ;:: �E �.�' u,AWW399-.-�-.- x®ienAlx��l0111E �s a ..-�,-'-�- .-� »-,-� .-lwn.-�`�ow �a�,- ��-.- z ��-L � ' dz O O- . nrr - -'-"lr N , _ xr= � -r� v _ w a y _ ,.s�.�.n� xrz - R O III l IN „ --„ +,,_ y ._ - .. y - ,. - .,z �.�_ r�71P9�nss.a °V` __ c � 'T�I�® ." 1 ;-7 1 h ° :,A>�x�P�;e�e oN 0 N N 5 z -. `4:r - r -+. °v.....Xe ass�i• /rl's^c. �_ a = t c rv�� ,°,: / e 5 - .,n erx.x. ., ._ - _ Lei_ H W- `.•� +,.ice.....: ce " a + .. _ - - - \ \ ,[mr �II S baa.•....a.k� ?yvn> /.'R'• •• 'y'x' \ „ II -.. .., �: P. '� ?•C•T $'y.a, - • e°a atlz za ,.43:§Pi• Jiwarimpansi � - f< ` W Z <:_�; t P / n 6 2ws a,.,,, ram=_ _ �'T r e -- ,• ,... I�1 / -5 SC ti a. f.„ !H .- __..____:-�. �'e",�-_. scua a �' +l•� c ! � ab"r aw✓'a .J•cN. _ _ _ .wm x°'ise',c cL�. ru _ � J ,,- •JJ - -. : IuSla.11+99'vi�::'' O���4ppp� u•u.a.<;btrva di � Jh mu.© 1 . Ai°I'� \ i \ /''�/ . 0..... s mz INTExsTnTE°E°"vEEovM _. nrorvsisrx+ww ens[oTcn�! ,.,.� ///! a R w r:: �,.SSSS� y, JP„ ! °B. e. I�R Il a ►,Illlarr. ,, nY aw 1,1" IIE. _-_`;-= /' oa 39°ao � mns;iopolki. 11111.11111W F ,r �// nm°uf - . elFffaIINSF37) ...,. ..sText <,. »ym: ,� _ .° a 1 / ,a ° �► \ '8` ,7 A/q�,)yn Ix�¢ - .. .ma - Q '] I 'es�sO _ • -_ � �-'�q ox 1111� .,En oat ;4" PI�Pa�y�IM7l1':� r Jm x" .. 1� 1 / sl n :o'"qII o, pii - - V ,s-�_ 1 - ��..1. �4 ,F sHaw ,, '\COov Sia.28W5b7 I ; ,Sze RG".der .clli I� , en X• '\, _ 1 1 �.�- �•. .�� ,q �1�� r 1. \ # q I II -�;' `• /` i 3•"'',,. € „� 1_ • ` ^a'.m51�tt �Blid� ig I ��u� 7•:-mot /I A .�e µae 9 ENo°"aaPRoxH sLAe '�I ;KI: - iSr „. f € 1I ��r` ►�f' ` a.: a1 a•iFr. !i s e "'p �c.': tt 1 o- ! Y9-Sla-28+69B3 � .. ° ." p' / �_, - '. wee li A�e t - 11'� ,.l III I"'� ¢ - Y$ xl I�s,; I 0, �, t,F- 1 �•,� O :j/ rm c9\\�n -•�• ,".:. �`.,� m�\��. �.�\ ... A -r9LPc srt8ra.n�ozse II ��1 !jlul 'rn t;n �� "x _s� I.� '� "� s In{ %• ��11 `I / \ 8 RPC-CS SYa./6+/0.96 r\en •e I'el I it 1 .:� - %' �mm e;.. asxxmn Y9RPA- -Y9RPC I -**, .Nrist \ _-- s_ li P/5/a/2+50A5 P/s 5/a I6+2770 PI Sta!/+8268 P/s 5/a/2+83.44 PI Sta/4+g/.q0 P/s Sta/6+7724 •x" \ -_Y9 f`.EMIM I)01061,13! ,I ,11W.. „ g '4 I 0-3'22'/2.3'/RT/ Bs-O40'24.9' =IT 43'22G fRT1 Bs=]'09'43P t1=IB 39'l95'1R71 Bs=T09'93J' s c Bsono STREET srnnoN ash e ��� �� Y9 La;.9'p5.T4 ' I+I�It�lz �^�,s� ;,y�(�'3 �I D 040'26B Bs=T 09'45.4 D=T0343P Ls=200A0' D=T09"43P Ls ZCgLXI" a ^ \ �" - �I !['�'f•, nixllf, I � L 49996' Ls Z0011(Y L-16485' LT 133.44 L=260.4B' LT 133.44 e \ -� ,As1'p' A �.-F x�x��tL^ ' ddr y �.°" 7 250A5' L7-ID7C T=8272' ST=66.71' T=131.4d 57=66.]7' I� sxow xc cExrtx ,Rc �„ (� `8- 7B i POT'S 6.39 • R 85IXJA0 Sr=7253' R 800AD' R 800L1Y 3 s' .. V ���y's'� A �• ��.,;ftwintomr. •_AIL r OS 50 MPH OS 50 MPH OS-s0 MPH I _ s i a. \ rwr � , ��_ . 1 48sluY r env . SE NC SE OB s 51 + 51'R �+a\" Y�S� --• $y�r� Pl a l9 44A9 PI 0+92A4 ±I� _ _ Pls Sta 19+3/58 Pls SIo 2/+98.42 PI Sta 23+5920 -200A0, D=If D'33A' ��` '' \�� sa!i�J�� �� c I �• �"' l/' Bs=IT Z7'33A' 0=I83M 439'lLTI \ r5'"'as y- , � "Lg �'ir12r ��► _ 71{4 .ME' Bs T09'43J' Bs if 2]'33A' 0-2l'23'059'1L71 -Y9RPC-SRS SIo.18+I0.47 t ♦ ` at1 � y END CONS�RULTIOd x Ls 207,4443f 00L4Y Ls 200A0 D-IT 27'33A' LT=133b/ L 161b9 ♦^II` - � Rg[I, pg�..��, �, p " LT 133.44 LT=I336M L 186b2' Sr=6692' T 8/56' o I i 3 t•• 4.4 � �'l1i9 f s•-._ ��N14 �"�" � 57=66.77' S7=6692' SE 500. �S_25 S�,pO'MPH I '*1 q V L,V, )si9 q 7� �. W l + i gy '�-0�s�-'..u`2®tx��Y 1 a�•.�. I 06 OS=25 MPH ,A // �cm�cr°:,x ra 11 }� /1�I� _ 1 ,°°,•,,'E l�l I -,er e 4 aE ® {. sa onu IERsTAT 1 II� III��I{'''�I II01I, Is 5/0 11+3594 PI SIo 9 29 Pls SIa l5+]l.]4 Pls SYa I1+38D4 Y9�Pl SIo 15+2433 I -_�T a� - b.caj°' r, f�j1'II' !1f4411'� u� Bs=3430559' 0=10428'39.9'!L7)Bs=3430'559' Ls= 0 00' D=4577137"2 37.4'!LT) _ 4 !s 200A0' 0=3430"55.9' Lz 2LUA0' Ls 2CV1.1Y D=45/]'35P •I '=q EJ ���q \ s$ 1 II �g �y�� p IIII LT=13596' L-30270' LT=13596' LT=13198' L 3033/ I I I� _ :'If6"E xr l� ST=6906' T 21931' ST 6906' ST 109M T=32426' $ �q T. 5 10 �' v Ih x 9 R=16600' R=I26.50" c --. \ ;I' , 6 III oa avz P COMPANY IIII OS PS MPH OS 20 MPH 39 is // \ 0.O I fgir:IJ %. ' II 1 I a oo¢ Pl Slo Z1+5798 PI SIa 24+1333 Y9 Pl SIa 30+09.40 Pl5/0 33+4472 PI SIo I3+37J1 ''' 1#lF_A a 1111[".■■ff M VOW � IIII p 3.09'OZ.O'(R7)0 304'02.0"fL71 p=3.59'323'(LT) p 403'4]5'IRTI =43'203851LT1 s°O59 N I !Y i.� ®�n p-rrroa2 D fl2'042 D=Tl2 042 D fl2 042 p=4 944 N & ! .Y I^ IIII L 25535' L 25535' L-332 79t° L 33827' L=90.78' fi 8 04 zb \\\ ;RFC-PT Sta.21+72.I6 "S,mi ti� y F. y�.� T-127.7/ 7=127.71' T=16625' T-1692M 7=41b9' R 120A0 P° saw. t!A 0� I 3�'lElk-Rt�i� - x R=477000' R=4770.00' R=4770Ad R=4.770A0' SE_ x\� Y� ° efs31 z' - c' ... .��....�. �� �.aE T \ v OS 40 MPH OS=40 MPH OS=40 MPH p5=40 MPH DS=20 MPH -MATCHLINE- STA 34+00.00 -Y9- SEE SHEET NO.29I. SEE SHEET 211-1 FOR INTERSECTION DETALS SEE SHEET S-3,SA FOR-Y S-PROFILE SEE SHEET 74 FOR-Y9-PROFILE SEE SHEET 76 FOR-MP,PROFILE SEE SHEET 77 FOR Ti I - nrN°-..m.. eoaaw.M.. SEE SHEET 79 FOR-"MA-PROFILE SEE SHEET 79 FOR-Y9B-PROFILE SEE SHEET BB FOR-rvc PROFILE GRAPHIC SCALE n.xee... �.o ax N ` so n p so 1p° a«ea.. o uNsLOAT o x .a a.,. _. PLANS `��, 'm / z �"'•,u 00 % _ e ? m 9'f d' g 59.00o^o al• PROJECT REFERENCE NO. SHEET NO. o • L v�_� " � I 1 1001 Morehead Square Dr., -2z51. s. O f m mx -x 'm 5` m m Ao°R/- z ',I Suite 610, Charlotte,NC 28203 /-3819B 20 a4 ° �' a I m>I n m m o / NC LIC NO.F-0165 ROADWAY DESIGN HYDRAULICS 118.9T E - o y DI o �. 1 /� RN✓ SHEET NO. 20.VCP a N OS'22'13" J Lp. o o - - 48 V A •'n w ice-_` 'I B 77.66' sE EN'4R ® O Fr,' a I5"RCP /I W o ENGINEER ENGINEER \ 3 B10'3]. R 4$eMFNr �` _ O 4. ssrW ®W ti , m 1 s9.00 W Rol // m go N o4°1rs9 E $ PRIVATE ROAD R/W® :E // \ pPO,q))) p,,,,,, y� y �. 59..0 i� 1 / �•��O �� 1 0 ,�O`SN CARP'),, `,H CARO 7 3 `O# v ��¢-`N w w 04'12 07"E ILli6") la"RCP �( S 72'09'S0"E N :kilt D _ � �r, ii\ x4sJ 72'PVC_ ro $39 �O pV .........li�. ��pP1;.........-/'. I5'RCP IB'C&G ) AD E$5/ '� $$ '1' • s cac i ac a°vcP / cg e Q NC GRID N 4 2;•oe o,P.-8 ,.i4�oFE / ''. 71.15' n T mil,' /CP ss8"VCP N 04'1300'E o VALIANT OR 22'BST /�No / a \ F- m /: m .p - -R / P IIII 12 52' �I_Cg�_-__ J� m \ k o�p 116:ll u, SEAL SEAL 53"E �s- o� 1 iy, &G �2Q IS'C&G ,4 _ ___�\ �Ic��S� - //Q ",y '72'PVC ~ 5 ii i4033007 041292 g•p81 - .¢ m �- = a0 PRIVATE �� -III- ) " z N2SFAPTo IS 4J 7.�'• F Q-i"�- 5 0 110 WCP �9\ 041x 00_ Q . � �S.c ��, //o30'RCP Ie+q �? 1` `.'� 0iF Ro R/W ® r; n: cn ':9'•.;1'G NE`c;.a F,VEE?;p2�Jo , -- - 4. // `' Aq o c*\ ��J� C�,ATµ 4i '{J2 G `n // II `•72'PVC ��y�OPHERO�` C. Gv,,,,/ 1 °,� DI s - 'ss \ 5'G ,o#*� \«5 ��. . „ 9 w.P. 1 #.. s7,S, mw t WILLIAM R. AXLEI+A um.o••�` ',, ).nu.,•"',,•CON Nrn- 3p. RCP c'ci/S+ l�o #c'B� #1F, A e cT 0� '"/ aF c' 'wiY 30 wv'�l \. 72 3S, B C& #~0V�9 ({,,`a\�q.n `rT � M ry e s.. W// of _ T,\ D1526 PG 1960 N, •o fRea:\.� 60 49• 6 # vs h/ems#' j F o a n ,n 2g'1 +,\5+ N' Lw. 9y A e {r•e a •' s TODD ELLIS BUILDERS, INC. ae%oti 2 e aA I �� c 72'PVC a �• D�1526 A�.1952 qo 0'7" o \�_ DB 2053 PG 1089 ?I•e, v C B l;f "''f s7 I//�' \ c/rs� . tiC 9 ��. # \` o ,00 a�, yF \q I i� N NM _ DOCUMENT NOT CONSIDERED FINAL O CHESNUT COMMONS ,�,� 2 'V�sl ti o TO 2 otiol \��. o�_ BST hcY/�' /�:a��.'� ti s `� e c ,: a� w o ; - HOMEOWNERS ASSOCIATION U h e <.> af�„M o, a \` I ,v4,© oo/ ,.j,° ONC//ec mop ' J �_ * y -�.- _ _ __OR UNLESS ALL SIGNATURES COMPLETED DB 1969 PG 2284 25 ° <S7' >\ c. �'c # J`��+,)--, O. hb o � „m72'PVC m. _ ' k �'' ON O M Y 2�Cif-2 A#' c„y CONC I r- P•1Ftiir 26 c„ti� ey. /^, Yt J 300'TAPER o `V,, Y' ,.,�R D NOISE VfALL w m C •1F .9 .- 4 N N ..��� S O d ♦ "'� N �# 6J• Q 0 0 �I# 8 W0 X / o'o O 2a 1�,,.� O -co22- 12 55=5 00 ' h / BST. T I 11 _ + RAIL �(� 111E1 '/ , tC242 2 03' 231g�f-)�`)o u02S, ©'_4' O�" +_ ;., EJ S3 N V ") IF'C&G =J u,� ,v �X_�X 48'WD HAIL I ., N i,.. g a- _ 1P I ?2. pNC O'CO2 yS• O •�'�.���J[� Ss O'2�. 2 r..k4 - .e##:v�� 1302 �L / . PVC' END CHL-NCE m ?2; ' .� 4a O ¢ '•• N Rr s*L�W4/0' .•04� 27.03 3.�2 4.11 o co.• RETAIN cP z�o: c� N:S75.74.13 00"W yt BEG.W W FENCE A\ r CIO!? , C' NC SF 2 �� 24.1 r�_ 0' -'( ? �� J �J _ W END NOISE WALL NW10A tiw C{'T ' Os ,5- o eg,• s2 ` • 4: ,..p,'F 9 2464 24.25' 54R n :. ,o 2 C'4 �p I 5 59 00' W :. ..7g S 4k o uV el 7^a� N {,\% N 04°Iz'49'E W TIE FENCE TO WALL r 'a - SEE S79?2•ate., ,79' 0 1.18., R f p` e'' 27 TO ,`l 140.00 A, NiY 48'CONC 104.00' Olo C.•CRETE DITCH 112.13 ife ' ,. I CL I RIP O S VC`,/1 qse Cq " 72• ro v}o 72.' + WITHPµ RI BE-ND RETAINING WALL 2A N N ".• m., •Sx 2Y�� ��o C NO . go, 3,2W Y . .27 g� pO'lr C o�)y_,d • I ,,EN 1 WITHE 'CLASSIL 5 RIP�P,.00 • O SE.DETAIL 83 SO D¢RETAINI WALL 2A 0 xsn cE . EXP.GUT-� \ 16 TONS1: ' V /•b� 8-_..-" H DFEAIP;CHL x- <Tsa�-2p`c . . l?:Amo.rfiY•}viiONC.. ' f=1 i k lJ I 9004�3'00.w�10.00'LT BEHI EE ,DETAIL:. 70^WO - S W C 3 TJGRETE V'.' H �'21_ia ti :� Y 5- I ? o IND NOISE W CONC 5 _: �C P+ - CONC 9 N �1 9 es.9:C m�k W OIS' � _rc_ -v_LE \.x- - .,o.. .. yi� wnannnl ::;4, •rt.-r iiiii __ v. - .. .. -. _ .. -. .- _ I: ,U�@ H X F X T'- '" �- 1)1)•i,1111111111111 - . W ------ �i' �- =r �� 1os o1 .....,..... ..,. .. - •. .� _ 2 o exlsTwG R7w X o - x C x 24 _ 2 • •.R -2GI C106�83 17 LAC �7MH iin�diiiiiiiiiiriii T C� 'r� a C � PROP WW FENCE �C "RCP IV G 0a { N 1377 w m m, _.:!! WALL •F •� _ - 15"RCP-III- ---------- -- _ < _ _ _ W 18"RCP-III ` •'7" 2GI,.��.15 RCP-IV �2� III T _ 1 ;n;;r�,vs2 GI _ _ _ _ - _ - - _ - - �2049j 24"RCP IVk042,12GI A�°- W SFB W/NOISE W � :^yyw ISRw _ N " �1 a'coN v� _ s : W isi -_ T_-�--fir =-- -T__=__r___T--=--L_ ,-- /_ __ T_ i ---- �EEM N " • �_y00, ---- / 24"RCP-IV --- --_ 44-- " W ��• - e aia esl 201 2oa1 i �'05f00� W I e4 7\°= ' 021j 2GI REMOVE 2. / .• ' " N iv Z \ OVE 2GI 4'PAVE i MTL T : _ _ _ �- O \ v <?n19�2GL��+OQ f �g � -REMOVE 2GI _- _ - - _ / S"RCI `S- MTL r I tr'• - � �« 9 _ � "RCP-III O - - - - -mil MTL _- TL - - _ T r r=-+_r � . _- __ L XiL ��L�J_ ONC.RAED.BMR. ,_ <2021Z-2Gh �V�"�14D7�''L-r--= r-_�--i-_, �JGIs MTL.L MTL -7-�'4,. 2GI L0� s-_z-_,--�-d Q - _ :_�.RtR ? U -- ---� _ REMOVE DI /� -R 0,, 2U11I -REMOVE a Slu. 8��02.3 .oa. �- // SSV END SBG' - 1-77 NB 375'8S7 m , /�-FLOWABLE FILL !E BEGIN G.R.W/ O&//A BEGIN SFB '"' T- Mil? ��---r--i N� ,., - r- - - MTL T, ''- ' ! �► , 15 RCP-IV N ,W � T _ „e.e._) 0 ._ TB 2GI SBG W/GUARD�RAI-LN y �,.�3 >T• 1 • .( ' li. $X 1 �� - ° 15'RCP-IV JB bb" w/MHRCP- �11 - -III ---__-REMOVE //JB vdMH END SBG 81•2 + O �'�', ��!llpA•7lfM , • Q -F . ,_ 11 "$�ww . _ .. F _ 48 ES_ �017> +90 .,..... _�yyyr ��r� i _ � W�M_- 0 . JB vdMH<201 .ti (n RETAI HW �F 4bLTs1 -'fi`�' -/ _ F-- F _ ` , �• g PROP CHL FENCE • S �z O • ``- .,r _- \ / VE15"RCP-III „ 15"RCP III --- yERs;E CHLP �� .i:` a•'Tg%' REMOVE�i t ` r T REMO I I ���� r5�� , C SS IIZIPRAP c F __ W �. �C�;� ' IN -- e_+•'� _. .. E .. .. _ E�-"'F .!9'f$) .. E D zI51Pc � , • LSU� ENCE C/ �_ 8,8--_ PIPE OUTLET CHANNEL �` (�' ms C)/ ' I v (Ty + x STABILIZATION PIPE OUTLET STABILIZATION +••• _y , •7;cG / n-- 1 . _--- ,-'-� Z j.1R 1 SEE DETAIL 54 SEE DETAIL 64 115.00'RT 2, 65 03 BEGIN',5' x / CL I RIP RAP CL I RIP RAP INTERSTATE DEVELOPMENT COMPANY 92Cp/�) / `�17 N = STANDARD 3' 24 TONS / 26 TONS DB 1273 PG 511 ` k� ' END 2'PS / BASE DITCH CL II RIP RAP + .1 1-V ` , •� '47' ' BEGIN 2'-6"C&G CL B RIP RAP , , GR ` L U 35 TONS 16 TRAGT No 1" 61.1T RT \u / ,_ SEE DETAIL 86 REMOVE ,�; y p +50 / 5 TONS 14 SV W 139.42'RT \ q �isnNc R/w IxAiI �� //I 1 �C / Q03X i•* WILLIAM R. AXLEY, ELAL -Yll- P7- Sta.22+S..ts /� Q, DB 2125 PG 5 225.01 30.00'LT Y11 I'1 p4 E ra• �� '�// , ! •,yOOS .ERE ilee l'k '. LINEG SI --- St----------'. tt�� TIE TO EX.DITCH $F TIE TO X.DITCH 01 �� ��- �' SEE DETAIL 77 �/ 1 TONSP5�SY Sf ITCH I / I /l/ SPEC L CUT \ -�StJ -- tl�f \�E \ / ¢ ryE,DETAIL 97 �- PCC Sta./9+67.47 END RESURFACING BEGIN GRADE -YII- POC Sta.19+00.00 a TIE TO EX.DITCH �C.7 W/TAIL'V'DITCH -a s SEE DETAIL 77 t, -YII- PC Sta./7+55.94 S INTERSTATE DEVELOPMENT COMPANY / co co DB 127 o.G " 11 v "TRACT No. 1" co 05 W �s 05 / m \ PERMANENT i.H' ' \\ EASEMENT !d CNI,P3• B OB 2151 PC 54 ��/ IN N 00 a m PIPE OUTLET STABILIZATION I -"o 00 W/CLASS I RIPRAP . `/ / SEE DETAIL 64 b /to I O m S n/ o Yll Y_S I l 31 Pl Sta 121-82.67 PI Sto 18+66.65 PI Sta 21+31.23 PI Sta 107+16.73 / ) F, -o A = 16°28'00.0"(RT) L. = 4/°46'38.6"(RT) 0 = 36°23'21.4"(RT) A = l°47'49.0"(LT) 8/ ' D = 4°30'00.0" D = 19'45'00.0" D = ll°30'00.0" D = 0°10'28.9" u L = 365.93' L = 2/1.53' L = 3/6.43' L = 1,028.69' I T = 184.23' T = 110.71' T = 163.76' T = 514.39' I o =I • ,;EGIN CONSTRUC mm R = 1,273.24' R = 290.1/' R = 498.22' R = 32,800.00' �` Xo' 9 BEGIN RESURFACING SE = EXIST. SE = EXIST. SE = 06 SE = NC \ n y//- STA,/5+14.36 SEE SHEET 54 FOR-Y s PROFILE o,..,,- .0). DS = EXIST. DS = EXIST. DS = 40 MPH DS = 60 MPH \S7• \' N/I SEE SHEET 89 FOR-Vii-PROFILE ' el �',\' ' „ t -Ylsl\ PT Sta.14+64.36 Q•/ "`I 1 /00l MoreAead Squa next I cnEn x l / s2c'VI' arxor`r oies 8io3 I-38/,7, 22 0. V.re C, day x ,x a. '�••ePo c. -M,qT 'mi"'YRPc. sC d`. s'S' fd'°v.„,,,,;n £,..,„,, �1x � •♦e SE STA 2 ) L�F " ...4:o, �q 5� �' 1�♦ r E SHE' 35+p ` do , SAS PyF ec � ' �ti ET 7�2 0 '.Y."-RT.' ` e sR. P'*.C`I pAPTCHLINYRPAC e1a.xa:m 0,�4 A • / r ` DOCUMENTNOTCONSIDREDFINAL 0'00 I II� �. sa„S., �� lj� SEE SHEET NO. �> k.��l� i '.1• ` �r�, .• ' \j - / • w -41 101, ,...,.N.:•.: r 3/ l llll \ er. o' / .� .__ �I %/ �. \„.:, • '''' ., `� �"�w •p:'r.-- /I%�/' O%�* tie o o '\ -rPRc-Ts sa.19+29Ao \ N ,.. � ®,�� -" / i * � .... �;� ,G., . ,,, ,,, ,, .\.‘,‘ 1 it,,,,, „..., h,i, „,,,,00,..: ,A z-, .0,0*. ., , A1/47‘ 4/,,,0`0.*q" „.-ektp E,,.*14,.:'. --., ' N\'E:..- " .,_,LT \\\ „:, .' . ie-g.41 ,,,,c,. i, 41.,,ba. .,,,,, .:::rez/ . , , ,40,,,e4;7°;0__ v. ,s041 6. ,,,,,,,, g, ��\ 41L .. �i4f . �.�� EYRP BRIDGE _.6 &S :4: '''' off", p '' '-,.. kRb ip", • �� - � : ° •" \` I I/ t N,� ' �' ,��4_ sae° fl �,ff'`� :y\a \ w; = \ `�yt ,lIu./ I P,' '*1,I p.' 94.LI I.1.1i c -YRPD- .l \S" \�\ rr 9 .���. %Ie/ iii a sours,LLC k.ifiro, 4.../ .1... 3 x \ '"\a ', ' I,f,; :'/\ / ////fir 7 ''�rM, PI Sla I4+24A3 Pls Sia 23+7430 PI Sla 26+fie - 4'4 r '4 ° 8391 Pls Sta 29+0394 Pls Sia 30+9594 � : . 'Ill �w ay "t' d � © 0=2'3002.3'lRT1 B5=452'552 =2924'llA'(RT)Bs=452'S52'Bs=45/'08.4�u .\¢\, °� R t • 5 /1 \k/i ��,'///jil • : eta L9D=238'02. Is-I4452Y 0 G'24'90' Ls LT=I452' Ls=I44Aa' ^eei\ \`• \ n �Ml l I �T� Y .229 : / T-j%43 5T= A' T=P21. ST-%DA STLT-4BD3'^.,�\ ••••••'••• • •'•••, • , . r;'1 YS-PoT o.129+gg98 4' .. R=9.000AO R=845LV' °\.''' '\. .• ,' ' \..•;.:•.:.•::. •• / -1/ / :N Afilt4V4IF , ©� FJQ4dSE=NC5E=50� ?I' "•' OS=50 MPH OS=50 MPH \ \ a b t 1 41/ / IA 44 iIAtii-f1.- +. Y_S -YRPAC- r = \ \ ."�•\ • .e , •I /, /// (>.:'" Pr Sia m+6863 PI Sta 74+Ou2 . \ " \ .• „• �I // ifR, / �i:eosv © O'29I53(Rrl 4 3,0z?4,488%!RT o` i 8 .' TS Sta.22+78.2� 0 0 029'53% M nor srn \ ;\ k \\ \ �a\.\ ` l Vl ►/L . / /� fl� L3© S� L IA14.43' L=593J5'.B' 'sus'n.Nc I�,Q \Q\° ` r I 44/ �fl LS R-S .ca R`z9T9 _ f SE=NC N , v.e6. \\ \ �. fl �� © OS 60 MPH 0.5 50 MPH fl Y1T Y R7 YRPC- `\94 \ * �{{ , �'� 0 Pls Sta 331+7361 Pl Sta 334+8661 Pis Sta 232+62,32 PI SA,235+9232 PIS Stu 20+25.04 PI Sta 24+6697 Pis Sta 28+57A3 \ - 11.,`\\{ja, *j 4\ t��, ;' •\\LY •• .� .1f/• ,• l Ls 14490' D 6'52'4IT Ls-144A0' D-O'43'409 Ls I4900' D-6'Sz'4l7' �, �,c j. ., / CT-%A4' L 3279' LT=%A4' L 730.41' LT=%D4 L-138922 I+11 1.1 4�•�` -91793' ') \\\ © •• e !14/� ' �, /�j ,08'i, a • ST 4BA3' R=8 JDO" ST-4dA3' R=7,870.00' ST=49A3' R=B33.00'i n�J(/ SE=06 SE=NC SE=06 .. NaTM '4 / / IF'I e1 wDS=50 MPH DS-50 MPH DS=50 MPH \,��'--ma.>s ...fi \\.,\ �azs ao"sN " II}: I• l 4Y a •O st .' fr*4 ' ' ik • r ,i:4., '**--333-,,_,..,.,,, TEN '''','',.., •33;`,.A ''''‘,',:•:3:::• Ita,L- IA' '''' 3.. / ‘,.i.,_• 1 • .,P.".f..; -.7 4, ,if / -- /I i A 41 '' .''.'‘ 4. '11''''"N' 1\ ------ N .: lir .,,,_, 7/I 70, , . i 404„:.:„.,,,, iiit,;• , .. ,,i.r.‘,.,,., in:,p,,T I I, ,1// l' i 11/4 ')477,-21 :7.‘'•: ' d rW -YRPAG`PT Sta.76+3635IN II Lj l l "OF ,( .,, ,,,,,:(3, ON,A,„ 1 .! I �•,r� J�„ ,1.., sue .,...ac....% — u v4, I1 i �+0�'i µ i� ���., 'bY"�ta.rz3ros•;wq,„ END BRIDGE R \.�� 1 " b �•.��1� A ��,'�i� trilf - 1#411,1 d-YRPOB-PT Sta.S_..r / _ ' I �` �' ST����� �����,WM /Y�cxENO APPROA H S PB \ e 1 I .r{t�'�.� 3 ����ilifitetiffrAttiVir #+014: ��y : _S-PoCSta.122+4175ENDAPPROACH �I,I "�1�;�\i�R(L"`'",..t ,� , iC � •`''A1' R 4�R BRIDGE.• lI i� � •v.1t�;Reittitg ,� -Y_5-POC Sia.122+pb3 \ \ -YRPAC-PC Slo.BO+3 � ¢•`�M'"dA � +; �� --'^.fie.. �1�,1 ,�, �,f,N� 1$1 /�r��'73W � �_\\\ \ .ounox. �n ar-w,nucxu+er naun�� MATCHLINE! /�: i`"A' 7 7 � • \�\ _ ST SEEOSHE'00 —YRPAC— STy TCy ®'�b cs �i1 ,o c1N : � \�'\�\� \ E, SEE SHEET 55 FOR-Y_S-PROFILE SEE SHEET 56 POR-Y LT-PROFILE nexa.,e�.. C...'.R.a.,, ET Np,21 SEE 0+0 f �I/� s Po sle 120+ate, \ �;„ \ SEE SHEET 69 FOR GRAPHIC SCALE ,CA„p DAVIS O r BEGIN APPROA H SLAB El C goo SHEET N�Y S, .v`r,= - a. . .1 O..eo. ' ,„\ °�,.� \\�Ol sEAsxELr�a ro.oaax.�EOEr.LL: so zs p so p E«Ea.. o.x.a..n DATE .3,019 o•?7 ..E4��_ \ �`��.. ^^ \-satin __- PLANS - Y `` I PROJECT REFERENCE NO. SHEET NO. 1001 Morehead Square Dr., Suite 610, Charlotte,NC 28203 38/98 27 Hw NC LIC NO.F-0165 RN SHEET NO. I -- if \ ROADWAY DESIGN HYDRAULICS Z // ENGINEER ENGINEER I a�� pp,VtN„CAROlip� ,�.P H'CAR0 i A�� �.`2 r'pFE55/p�y'�.� p2�.'FESS�p,�P.✓'. ---— /4� 4' _ _r -_-__ r I ? SEAL ":, s —�--- I SEAL I . z DI s z CONC r NE L, 033007 's 041292 I if O _ r NC GRID NAD 8395 °T % �!yi.'<G I St.4. '': FNGINEEQ'c •� O ,���TOPHER O;�P�J I.C. GV. �� 1114uuN. W �- DOCUMENT NOT CONSIDERED FINAL (V W ._ ..".. .. .. .. .. .. .. UNLESS ALL SIGNATURES COMPLETED . 2 N 8'wwX X X Xf X 98.86'RT -Y-N- \ -,-;.-, DCOFORTH FAMILY W \ °RBV06166PG 028ST RAMONA LOWE JOHNSON S Z PUE�I1 DB 1780 PG 1456 "/," " " """* R +89.39-Y N- /" " ' ` J 154.94'RT _ :SF 0 U ,/ N O I- O GOFORTH, GOFORTH & CONE, LLC r� DB 1903 PG 104 \Ps.Z - TIW�OIL EX.DITCH'V'DITCH END SB WIDENING/RESURF. '9\'- \ . .. SEE DETAIL 77 _Y N— POT STA. 205+15.43 / W 720'MEDIAN WIDTH TRANSITION (LT) e INSET W 300'LANE ADD.TAPER o -- -I 7 4'BASE HEAD DITCH SE�"' LATERAL'V'DITCH TIE TO EXIST.FENCE W/CLASS 1 RIPRAP END NB RECONSTRUCTION I SEE DETNL78+65.43 +15.43-Y_N- SEE DETAIL 87 BEG. NB WIDENING & RESURF. N— P T STA. 20 +50.00 101.06 ^ S .. W _ CL B RIP RAP EXISTING R/w l�� END CONSTRUCTION \ ., o W x o a• X— X X X x 4s'ww X s I 3[1F- � :•ww R� 4e•ww X4a•ww X- ��� "EScn �,� "■ ' EN D NBA WIDENIN7G & RESURF. w I i.5"CS ae Ti. �� �1��'•W 73 .. F EU TL+ F HW > .. x M . i� L -I N- ."O T 1. - REPLACE CONCRETE DITCH Z ,_tar,; ,._ 2GI<2= 4WD fi51- REMOVE HW 61 REPLACE CONCRETE DITCH -- -- —WMER�LLSEOPE-COVER — ---- — 0 W �` ____ - • -Fitt S[OPE_COVERS -- REMOVE CROSS PIPE -- CONC�t€FE ---- %� 11 E91dTRAET6I�T�E(�NFHHOrEXiSTiNC W I\� C',S, EX.HW END SECTION e/ RETAIN RETAINaft,� V„I PLOWABLE FILL al: EX.CONCRETE `-�� SEE DETAIL 79 Qc, �J' W TRENCHLESS SEE DETAIL 79 A / \\ ANDPE INVERT RM WITHIT CONSTRUCTION T ,r o ---- _ -- `�/ --- RETAIN CONCRETE CHANNEL 1 6 // PAVED DITCH CONFIRM ENGINEER pylm -41.1 fie 0 70 2OJ�+� , �� .— v RETAIN �L BESET--GUARDRAI6 FULL OF DEB _ —TIE TO-EXISTING- 1 ��_ _ - a s - INSTAL64A 1 11 CiN3_ 1. - CR.: - ONC /. T MTL F ! 3••E II:IW -�r�1- .. -' M r - I - 1- - I A 1 — F r X MT ,F TL F1 — — -- - rnrw, Y, M 1 n �T! Irii. . 1 _ram i 1 1 D • EL 1 1 2 1 1 . . -. —— Ci T , — M P� (n o a — IL' REMOVE EX.24"RCP -j Iv Man / / ASSUMED 18"RCP LOCATION mac. q = - TO BE RETAINED �� � R� ��� H�N[INFEB_ I��_ - __IIE1D_FX DITCH 'c'llntQ _ G,�� F REMOVE 8 LF Or EX.13'Ra.P �_IS _ 7'/TAIL'V'DITCH rL CO r 4-\ — --- I-CIUR 10 CONFIRM tXIJ 11NG- ffl DETAIL O _:. :7u* 15"RCP-III TB 2GI VERT DURING CONSTRUCTIO"" 71 COLLAR /j^d N I". " •ND CONFIRM WITH ENGI 15"RCP-IV 18".r'-I °•i TB GI •77 '77 / _ • N LLI CV . . ,a_ I aa'ww kn 4e ww �u r. L L L IN 86" SPECIAL LATERAL V'DITCH - <� Q 48 RCP III�OLLAR\^ E TB 2Gl' All 71 TB 15"RCP N RT a _ 5"RCP III - SEED J F.. 'AC n .✓. ...3 ' ...----- TIE F � W -�� � CC DRIP IfA� F F iNdo- F F F 71y� 7- <2716> .0 1B w/MH — Y N �` t��y t� 1 TONS 5 SY 7 o PROP.CHL FENCE 18"RCP-III ,1 «� i _ _ o \J W L imIII 1 .. ... 1 11-r !7 . .. 72 Me: 2 -a I .. .IIJ `.' aa .:. GL B'' C i C 6 TONS 20 SY �II '7� _ .. _ ._�P GUT DITCH ._ ._+ :. ' ` (n m W 15"CSP +74.17-Y N- 5 TONS 14 Sr t^ 120.00'RT +50.00-Y N- 98.86'RT t,J m W/ELBOWS 20.00'RT- 120.00'RT- SEE DETAIL 72 Z PUE •UE PUE PUE D•�;.;; PUE PUE PUE PUE P .-_7 PUE VVELBOWS PU:'—' PUE PUE PUE PUE PUE PUE PUE N 2 2• -Y - PIPE OUTLET `u is 4'BASE TAIL DITCH• PIPE OU ET + I E -Y N_ �ol_ 520'OUTSIDE SHOULDER TAPER m J 120.00'RT CHANNEL STABILIZATION - W/CLASS B RIPRAP CHANNEL STABIL • ION . .. 152.89'RT If +15.4 SEE DETAIL 73 PDE O SEE DETAIL 88 SE • AIL 4 150.00 CL I RIP RAP L I RIP RAP TOE PROTECTI• SPECIAL LATERAL'V'DITCH +•4.L -Y N- N 92 TONS 127 SY WITH CLASS P W/CLASS B RIPRAP 120.00'RT v 25 TONS - SEE DETAIL 31 +03.77-Y N- +54.1B-Y N- SEE DETAIL 74 n120.00'RT- 120.00'RT- o NOT DISTUR:.SIGN o s I— TOE PROTECTION 152.23'RT 152.35'RT SS/ o �� 720'SHIFT & 720'INSIDE SHOULDER TAPER ,c 175.00'RT 175.00'RT n • 720'LANE DROP TAPER - WITH CLASS B RIPRAP f + SEE DETAIL 31 /j5/ + -a t m m IS ami m ii�RETAIN GOFORTH FAMILY REVOCABLE TRUST .-. L� DB 1607 PG 197 v SF N m N co to co / -a i 73 d In U i SEE SHEET 59,60 FOR-Y_N-PROFILE md, om v om xv AL.joe Oa8 -/3