Loading...
HomeMy WebLinkAbout20030652 Ver 1_More Info Letter_20030716Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E. Director Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality July 16, 2003 CERTIFIED MAIL: 7003 0500 0000 8804 2450 RETURN RECEIPT REQUESTED Commanding General Marine Corps Air Station Cherry Point EAD LN, PSC Box 8006 Cherry Point, NC 28533-0006 SUBJECT: Dear Commanding General: PROJECT ON HOLD F ADDITIONAL INFORMATION/ CP03004 Replace Fuel Storage Facility / Repair Bulkhead DWQ PROJECT # 030652 Onslow County This Office has reviewed your Pre-Construction Notification application and is placing your project on hold until we receive the following additional information: 1). Please provide a signed and dated copy of an Agent Authorization Letter for George Radford to have signatory authority on the Pre Construction Notification application. Please respond within three weeks of the date of this letter by sending a copy of the information to Noelle Lutheran and to Cyndi Karoly, 401 Wetlands Unit, 2321 Crabtree Blvd., Raleigh, NC 27604-226, her phone number is (919) 733-9721. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. If you have any questions, please feel free to call me at (910) 395-3900. Sincere Noelle Lutheran Environmental Specialist III cc: Cyndi Karoly -Wetlands Group Mr. George Radford, Environmental Affairs Officer WiRO RECEIVED JUL 21 2003 NC WETLANDS RESTORATION N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer Service Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 14415b tt