HomeMy WebLinkAbout20021160 Ver 1_More Info Letter_20020920 (2)?0 WATF9P
r
?C, ?i
O 'C
CO
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Gregory J. Thorpe, Ph.D.
Acting Director
Division of Water Quality
September 20, 2002
CERTIFIED MAIL: 7001 1940 0007 1402 3146 - - - SEP 7
RETURN RECEIPT REQUESTED 2002 41,
Homeco Builders, Inc. & Sunset Cove Development, Inc. ?.U?IDS OROup °
Mr. John L. Pierce Ll SECTIO.N
P.O. Box 1685 '
Jacksonville, NC 28540
SUBJECT: PROJECT ON HOLD FOR
ADDITIONAL INFORMATION ON
Harbor Pointe Subdivision
DWQ PROJECT # 021160
Pender County
Dear Mr. Pierce:
This Office has reviewed your revised application and is placing your project on hold until we receive the
following additional information:
1). The proposed dredging at the second site adjacent to the proposed bulkhead would cause degradation
to a Primary Nursery Area according to the Division of Marine Fisheries. Delete the dredging at the
second site from the proposed project.
Please respond within three weeks of the date of this letter by sending a copy of the information to Noelle
Lutheran and to Cyndi Karoly, 401 Wetlands Unit, 2321 Crabtree Blvd., Raleigh, NC 27604-226, her phone
number is (919) 733-9721. If we do not hear from you within three weeks, we will assume that you no longer
want to pursue this project and we will consider the project as withdrawn. If you have any questions, please feel
free to call me at (910) 395-3900.
Sincerely, /
-/ t? & zle,4 zzel?
Noelle Lutheran
Environmental Tech V
cc: Cyndi Karoly -Wetlands Group
Jim Gregson, DCM
Henry Wicker - Corps of Engineers Wilmington
WiRO
127 Cardinal Drive Ext., Wilmington, INC 28405-3845 Telephone (910) 395-3900 FAX (910) 350-2004
An Equal Opportunity Affirmative Action Employer