HomeMy WebLinkAbout310349_30 day poa_20201112PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 11/12/2020
1. Structure Name/Identifier (ID): I Benny Kennedy I FN: 31-349
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
16.0 inches
19.5 inches
3.5 inches
57575 ft2
125609 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 80705 ft3
h. current herd # 2448 certified herd # 2448
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 7/31/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
80705 ft3
0 ft3
35000 ft3
144246 gallons
1.68 Ibs/1000 gal.
453.4 Ibs. PAN
PoA (30 Day) 2/21 /00 11 /12/2020
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: Benny Kennedy
line m =
453.4 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n. lines 1 +2+3+4+5+6= 453.4 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
5773
3A
Small Grain
1.20
50.00
60.0
10/1 - 3/31
5773
313
Small Grain
1.45
50.00
72.5
10/1 - 3/31
5773
4A
Small Grain
2.10
50.00
105.0
10/1 - 3/31
5773
413
Small Grain
2.54
50.00
127.0
10/1 - 3/31
5773
5A
Small Grain
2.14
50.00
107.0
10/1 - 3/31
5773
5B
Small Grain
1.24
50.00
62.0
10/1 - 3/31
5773
5C
Small Grain
1.24
50.00
62.0
10/1 - 3/31
5773
6
Small Grain
5.24
50.00
262.0
10/1 - 3/31
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 857.5 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 453.4 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 857.5 lb. PAN
y. Overall PAN balance (w - x) _ -404 lb. PAN
PoA (30 Day) 2/21 /00 11 /12/2020
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based
on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the
PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility.
Waste will be applied as soon as weather permits.
PoA (30 Day) 2/21 /00 11 /12/2020