Loading...
HomeMy WebLinkAbout240095_30 day poa_20201112PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): JJerryJohnson 24-95 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard 11 /12/2020 a. current liquid level according to marker 17.0 inches b. designed 25 yr./24 hr. storm & structural freeboard JQ .5l inches c. line b - line a (inches in red zone) = 2.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 73206 ft2 e. line c/12 x line d x 7.48 gallons/ft3 114079 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 432000 ft3 h. current herd # 3200 certified herd # 3200 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 8/24/2020 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 432000 ft' Oft3 44625 ft3 594193 gallons 1.21 Ibs/1000 gal. 857.0 Ibs. PAN PoA (30 Day) 2/21 /00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Jerry Johnson line m = 857.0 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 857.0 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 1 Small Grain 4.10 50.00 205.0 Oct - Mar 2 Small Grain 3.20 50.00 160.0 Oct - Mar 3 Small Grain 3.20 50.00 160.0 Oct - Mar 4 Small Grain 3.60 50.00 180.0 Oct - Mar 1 B Small Grain 1.10 50.00 55.0 Oct - Mar 213 Small Grain 0.75 50.00 37.5 Oct - Mar 313 Small Grain 0.80 50.00 40.0 Oct - Mar 413 Small Grain 2.50 50.00 125.0 Oct - Mar 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 962.5 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 857.0 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 962.5 lb. PAN y. Overall PAN balance (w - x) = -105 lb. PAN PoA (30 Day) 2/21 /00 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Waste will be applied agronomically and hydraulically as weather permits. PoA (30 Day) 2/21 /00