HomeMy WebLinkAboutSW3201001_SuppEZ-2018-Version-2.1.1_20201202
SUPPLEMENT-EZ COVER PAGE
FORMSLOADED
PROJECT INFORMATION
Project Name
Dollar General - Granite Quarry (Store #22446)
1
2Project Area (ac)2.17
3Coastal Wetland Area (ac)0
4Surface Water Area (ac)0
5Is this project High or Low Density?High
Does this project use an off-site SCM?No
6
COMPLIANCE WITH 02H .1003(4)
7Width of vegetated setbacks provided (feet)N/A
8Will the vegetated setback remain vegetated?Yes
9Is BUA other that as listed in .1003(4)(c-d) out of the setback?Yes
Is streambank stabilization proposed on this project?No
10
NUMBER AND TYPE OF SCMs:
11Infiltration System0
12Bioretention Cell0
13Wet Pond0
14Stormwater Wetland0
15Permeable Pavement0
16Sand Filter1
17Rainwater Harvesting (RWH)0
18Green Roof0
19Level Spreader-Filter Strip (LS-FS)0
20Disconnected Impervious Surface (DIS)0
21Treatment Swale0
22Dry Pond0
23StormFilter0
24Silva Cell0
25Bayfilter0
Filterra0
26
FORMSLOADED
DESIGNER CERTIFICATION
27Name and Title:Justin Church, PE / Principal Engineer
28Organization:BREC, P.A.
29Street address:1520 Meadowview Drive
30City, State, Zip:Wilkesboro, NC 28697
31Phone number(s):336.844.4088
Email:justin@brec.biz
32
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or
supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and
that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent
with the information provided here.
Designer
______________________________________________
Signature of Designer
09/29/2020
______________________________________________
Date
Seal
DRAINAGE AREAS
1Is this a high density project?Yes
ge areas/SCMs1
2 If so, number of draina
Is all/part of this project subject to previous rule
3versions?No
FORMSLOADED
Entire Site1
DRAINAGE AREA INFORMATION
4T
ype of SCM N/ASand Filter
5Total BUA in project (sq ft)53464 sf53464 sf
New BUA on subdivided lots (subject to
6permitting)(sq ft)N/AN/A
New BUA outside of subdivided lots (subject to
7permitting) (sf)29211 sf29211 sf
(sq ft)43875 sf43875 sf
8Offsite - total area
9Offsite BUA (sq ft)24253 sf24253 sf
10Breakdown of new BUA outside subdivided lots:
- Parking (sq ft)18026 sf18026 sf
- Sidewalk (sq ft)1976 sf1976 sf
- Roof (sq ft)9209 sf9209 sf
- Roadway (sq ft) sf sf
- Future (sq ft) sf sf
- Other, please specify in the comment box
below (sq ft) sf sf
New infiltrating permeable pavement on
11subdivided lots (sq ft) sf sf
New infiltrating permeable pavement outside of
12subdivided lots (sq ft) sf sf
Exisitng BUA that will remain (not subject to
13permitting) (sq ft) sf sf
14Existing BUA that is already permitted (sq ft) sf sf
15Existing BUA that will be removed (sq ft) sf sf
16Percent BUA57%57%
17Design storm (inches)N/A1 in
18Design volume of SCM (cu ft)N/A4404 cf
Calculation method for design volumeN/ASimple
19
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
20drainage area(s):
Entire Site1
DRAINAGE AREA INFORMATION
4Type of SCMN/A
Total BUA from project (sq ft)
5
6 1995 rules
SL 2006-246
2008 rules
2017 rules
New BUA on subdivided lots (subject to
permitting) (sq ft)
7
1995 rules
SL 2006-246
2008 rules
2017 rules
New BUA outside of subdivided lots (subject
to permitting) (sf)
8
1995 rules
SL 2006-246
2008 rules
2017 rules
Offsite - total area (sq ft)
9
1995 rules
SL 2006-246
2008 rules
2017 rules
Offsite BUA (sq ft)
10
1995 rules
SL 2006-246
2008 rules
2017 rules
Design storm (inches)
11
1995 rules
SL 2006-246
2008 rules
2017 rules
Breakdown of new BUA:
12
- Parking (sq ft)
- Sidewalk (sq ft)
- Roof (sq ft)
- Roadway (sq ft)
- Future (sq ft)
- Other, please specify in the comment box
below (sq ft)
New infiltrating permeable pavement on
13subdivided lots
(sq ft)
New infiltrating permeable pavement outside of
14subdivided lots (sq ft)
Exisitng BUA that will remain (not subject to
15permitting) (sq ft)
16Existing BUA that is already permitted (sq ft)
17Existing BUA that will be removed (sq ft)
18Percent BUA
gn volume of SCM (cu ft)
19Desi
Calculation method for design volume
20
ADDITIONAL INFORMATION
Please use this space to provide any additional
information about the drainage area(s):
21
SAND FILTER
Drainage area number1
1
Design volume of SCM (cu ft)4404 sf
2
GENERALMDCFROM02H.1050
Is the SCM sized to treat the SW from all surfaces at build-out?Yes
3
Is the SCM located away from contaminated soils?Yes
4
What are the side slopes of the SCM (H:V)?3:1
5
Does the SCM have retaining walls, gabion walls or other engineered
side slopes? No
6
Are the inlets, outlets, and receiving stream protected from erosion (10-
year storm)?Yes
7
Is there an overflow or bypass for inflow volume in excess of the
design volume?Yes
8
What is the method for dewatering the SCM for maintenance?Pump (preferred)
9
If applicable, will the SCM be cleaned out after construction?Yes
10
Does the maintenance access comply with General MDC (8)?Yes
11
Does the drainage easement comply with General MDC (9)?Yes
12
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
13
Is there an O&M Agreement that complies with General MDC (11)?Yes
14
Is there an O&M Plan that complies with General MDC (12)?Yes
15
Does the SCM follow the device specific MDC?Yes
16
Was the SCM designed by an NC licensed professional?Yes
17
SAND FILTER MDC FROM 02H .1056
SHWT elevation (fmsl)769
18
Type of sand filter (open or closed)Open
19
If closed, will the filter will be pre-cast or pour-in-place?
20
If closed, top of grate elevation (fmsl)
21
Is this sand filter designed to attenuate peak flows? No
22
{ĻķźƒĻƓƷ/ŷğƒĬĻƩ
1966 cf
Volume that can be retained in the sediment chamber (cubic feet)
23
Will there be a permanent pool in the sediment chamber?Yes
24
773.00
Bottom of the sediment chamber (fmsl)
25
1258 sf
Area of the sediment chamber (square feet)
26
28.0 in
Physical depth of the sediment chamber (inches)
27
Ponding depth in the sediment chamber, above any permanent pool
(inches)16.0 in
28
Elevation of top of weir between chambers (fmsl)775.3
29
{ğƓķ/ŷğƒĬĻƩ
1765 cf
Volume that can be retained in the sand chamber (cubic feet)
30
774.00
Bottom of the sand chamber (fmsl)
31
1129 sf
Area of the sand chamber (square feet)
32
16.0 in
Physical depth of the sand chamber (inches)
33
Ponding depth in the sand chamber, above any permanent pool
(inches)16.0 in
34
Elevation of the bypass device (fmsl)775.3
35
Type of bypass deviceOrifice
36
Mechanism for distributing flow over the sand surfacestone dam
37
Sand specification for sand chamberastm c33
38
Depth above underdrain pipe (inches)18 in
39
Will the media be maintained to drain at least two inches per hour at
the sand surface?Yes
40
Is at least one clean-out pipe provided at the low point of each
underdrain line?Yes
41
Will clean-out pipes be capped? Yes
42
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
Sand Filter(s):
43
SandFilter411:46AM9/29/2020