Loading...
HomeMy WebLinkAboutNCC205504_NOI Application_20201202Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 11/28/2020 12:01:44 PM (NCG01 NOI Submission) Approve by Meloy, Michael 11/30/2020 8:14:12 AM (Review- Construction NOI 37409) • The task was assigned to Meloy, Michael by round robin distribution 11/28/2020 12:02 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: December 2, 2020 5:00 PM 11/28/2020 12:02 PM Submit by Selkane, Aziza 12/2/2020 11:29:04 AM (Payment Verification for NCC205504) * Julia F Tripp • Selkane, Aziza assigned the task to Selkane, Aziza 12/2/2020 11:28 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: January 11, 2021 5:00 PM 11 /30/2020 8:14 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * T&G Tract Single Source Borrow Pit 1 b. Specific Lot This field may be used to list specifc lot numbers. Numbers Parcel ID: 20400011, 20400012, 20400013, 20400014, 20400048, 20400043, 20400045 and 20400047 2. County* Brunswick 3. Highway or Street NC 211 Address * Street narre only is acceptable if no address number assigned yet 4. CityorTownship* Smithfield 5. State * NC 6. Zip Code * 28461 7. Latitude * Enter the latitude in decimal degrees 33.9670 8. Longitude* Enter the longitude in decinal degrees (N ISTbe negative) -78.0900 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 11/30/2020 Estimated Construction Project Start Date 10. Date to End* 11/29/2021 Estimated Construction Project End Cute 11. SIC (Primary)* Industrial (1541) Standard Industrial aassification for Developrrent 12. Acres to be 5.00 disturbed* (including off -site borrow and waste areas) 13. Total site area 5.00 (acres) * 14. Post- 0.00 construction (Estirrated) impervious area (acres) * NCC Project NCC-BRUNS-2020-T&G Tract Single Source Borrow Pit Tracking ID Assignedautorraticaly Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Beaverdam Creek Wate rbody* Narre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 18-88-9-1-(0.5) Index No.* NCWaterbody Index Narrber Stormwater rJ No discharges will flow r- Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * Tripp's Construction, LLC IF pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Dave IF Corporation, enter Faegistered Agent First %rre 3. Last Name* Tripp IF Corporation, enter F;bgistered Agent Last %rre 3b. Title Manager 4. Permitee E-mail trippsconstruction@atmc.net Address* 5. Permittee 910-287-3234 Telephone No.* 6. Permittee Mailing Street Address Address* P.O. Box 126 Address Line 2 City Ash Fbstal / Zip Code 28420 Check box if the F Yes street address the same as mailing address State / Frovince / i egion NC Country us 7. Permittee Street Street Address Address* 9854 Rivergate Drive Northwest Address Line 2 City State / Frovince / Region Ash NC Fbstal / Zip Code Country 28420-2025 us 8. Type of Non -Government Ownership C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Dave Contact - First Name * 2. Primary Site Tripp Contact - Last Name * 3. Title Manager 4. Site Contact E- trippsconstruction@atmc.net mail Address* 5. Site Contact 910-287-3234 Telephone No. 6. Organization Tripp's Construction, LLC Name 7. Site Contact Street Address Mailing Address* P.O. Box 126 Address Line 2 city Ash Fbstal / Zip Code 28420 8. Consultant Name (Optional) Phil Norris First and Last nacre 9. Consultant E-mail pnorris@ntengineers.com This person will be copied on all correspondence. 10. Consultant 9102875900 Telephone No. State / Rovince / Region NC Country USA D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 11/20/2020 Approved * 2. E&SC Plan Project BRUNS-2021-028 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Wilmington (WiRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan Approved Single Source Borrow Pit (BRUNS-2021- Approval letter or 304.89KB 028) 11-20-20.pdf Grading Permit Mast be RDFfon-rat 6. Site Location Map Mist be RDFforrret (lint 201VB) 20119 USGS .pdf 494.25KB Rease do not upload entire set of E&SC plans. 7. Notes (Optional) Provide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification NOI form.pdf 690.57KB Form Mist be RDFforrret This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Pw T�l Type Name * Dave Tripp Title Manager Organization Legally Plesponsible Entity Tripp's Construction, LLC Date * 11/28/2020 F. Tracking and COC Info NOI Tracking No. 37409 NC Reference No. NCG01-2020-5504 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC205504 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 5504 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC205504-2020 Invoice Due Date 12/30/2020 Initial Fee $ 100.00 Invoice Status OPEN