Loading...
HomeMy WebLinkAbout20021731 Ver 1_More Info Letter_20021212Michael F. Easley, Governor OaO? W AT co 7 William G. Ross Jr., Secretary j r North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality December 12, 2002 I Di ? 11" CERTIFIED MAIL: 7002 0860 0003 9550 8823 UU ru Q 2002 RETURN RECEIPT REQUESTED Mr. Sterling B. Cheatham, City Manager yyq ET UNI S GROUP City of Wilmington '" -?-----_Q ALtTY itC PO Box 1810 Wilmington, NC 28402 SUBJECT: PROJECT ON HOLD FOR ADDITIONAL INFORMATION ON Longstreet Drainage Way DWQ Project # 021731 Dear Mr. Cheatham: This Office has reviewed your application and is placing your project on hold until we receive the following additional information: 1). The deepening and widening of the stream is considered to be impacts based on some typical details provided. Please indicate the length of stream that will be impacted in this manner. 2). The proposed culvert extensions and dissipator pads are impacts if they extend beyond the existing footprint. Please enumerate these additional impacts and/or provide a signed map from the Corps showing what portions of the stream are not waters of the United States. 3). If the channel or bank hardening as well as stream widening and deepening are greater then 150 feet total, then stream mitigation will be required and a stream mitigation plan must be provided. It is possible that the deepening and widening could be conducted in a manner that would not require mitigation. Please contact Todd St. John of the Raleigh Office at (919)-733-9584 to discuss. 4). If the total widening and deepening as well as hardening and culvert extensions are greater than 500 feet, a SEPA document may also be required. 5). If the entire culvert is to be replaced, then aquatic life passage should be provided. N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer Service A Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 1N C6- ENR Mr.. Cheatham DWQ"Project # 021731 December 12, 2002 Please respond within three weeks of the date of this letter by sending a copy of the inf6rmation to Noelle Lutheran and to Cyndi Karoly, 401 Wetlands Unit, 2321 Crabtree Blvd., Raleigh, NC 27604-226, her phone number is (919) 733-9721. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. If you have any questions, please feel free to call me at (910) 395- 3900. Sincerely, Noelle Lutheran Environmental Tech V cc: Cyndi Karoly -Wetlands Group Todd St. John - Wetlands Group Angie Pennock - Corps of Engineers Wilmington WiRO